867 resultados para Infrastructure Procurement
Resumo:
Democratic governments raise taxes and charges and spend revenue on delivering peace, order and good government. The delivery process begins with a legislature as that can provide a framework of legally enforceable rules enacted according to the government’s constitution. These rules confer rights and obligations that allow particular people to carry on particular functions at particular places and times. Metadata standards as applied to public records contain information about the functioning of government as distinct from the non-government sector of society. Metadata standards apply to database construction. Data entry, storage, maintenance, interrogation and retrieval depend on a controlled vocabulary needed to enable accurate retrieval of suitably catalogued records in a global information environment. Queensland’s socioeconomic progress now depends in part on technical efficiency in database construction to address queries about who does what, where and when; under what legally enforceable authority; and how the evidence of those facts is recorded. The Survey and Mapping Infrastructure Act 2003 (Qld) addresses technical aspects of where questions – typically the officially recognised name of a place and a description of its boundaries. The current 10-year review of the Survey and Mapping Regulation 2004 provides a valuable opportunity to consider whether the Regulation makes sense in the context of a number of later laws concerned with management of Public Sector Information (PSI) as well as policies for ICT hardware and software procurement. Removing ambiguities about how official place names are to be regarded on a whole-of-government basis can achieve some short term goals. Longer-term goals depend on a more holistic approach to information management – and current aspirations for more open government and community engagement are unlikely to occur without such a longer-term vision.
Resumo:
Purpose Most barriers and enablers of sustainable projects are related to procurement. This study proposes a framework for evaluating green procurement practices throughout the lifecycle of road construction projects and demonstrates its application through an Australian case study. Design/methodology/approach The study is based on linking the phases of road construction with incentive mechanisms for proactively motivating behavioural change. A holistic view on utilised and potential incentives is attempted with a literature review and a state-of-practice review. The latter is based on interviews and 90 policy and procurement documents across five Australian states. Findings An evaluation framework with seven procurement stages is suggested to describe current state green procurement incentives throughout the delivery lifecycle of road construction projects. The Australian case study was found to provide useful data to identify gaps and strong points of the different states regarding their level of integration of sustainability and greenhouse gas emissions GHG) reduction elements in their procurement practices. This understanding was used to draw recommendations on future advancement of green procurement. Originality/value: Government entities across the globe can impact considerably the achievement of sustainability and GHG targets, by using their procurement practices and requirements to create incentives for contractors and suppliers to engage in more GHG conscious practices. The present study provides a systematic account of how green procurement practices can be underpinned using the Australian road construction industry as a case study, and distinguish between strong and weak links in the green procurement chain to draw recommendations for future initiatives.
Resumo:
Collaborative infrastructure projects use hybrid formal and informal governance structures to manage transactions. Based on previous desk-top research, the authors identified the key mechanisms underlying project governance, and posited the performance implications of the governance (Chen et al. 2012). The current paper extends that qualitative research by testing the veracity of those findings using data from 320 Australian construction organisations. The results provide, for the first time, reliable and valid scales to measure governance and performance of collaborative projects, and the relationship between them. The results confirm seven of seven hypothesised governance mechanisms; 30 of 43 hypothesised underlying actions; eight of eight hypothesised key performance indicators; and the dual importance of formal and informal governance. A startling finding of the study was that the implementation intensity of informal mechanisms (non-contractual conditions) is a greater predictor of project performance variance than that of formal mechanisms (contractual conditions). Further, contractual conditions do not directly impact project performance; instead their impact is mediated by the non-contractual features of a project. Obligations established under the contract are not sufficient to optimise project performance.
Resumo:
Based on Dunning's dominant international business theory and the unique characteristics of construction, a novel framework is developed and tested to explain multinational contracting into Australia. Beyond contributions to theory, Australian governments now have clear evidence upon which to develop more effective procurement reform towards increasing the attractiveness of public sector major infrastructure projects and competition in this sector.
Resumo:
Construction product innovation can exert a positive influence on project and industry performance. However, guidance is scarce on product innovation diffusion for road infrastructure, in contrast to the large body of literature on the manufacturing industry. A conceptual framework is proposed to understand these processes. Advice is given to managers based on the framework and a large quantitative survey. The framework focuses on contextual characteristics that influence the decision to adopt new-to-industry product innovation, as part of a diffusion process. Case study data are interpreted within the revised framework to test its value and disaggregate the broad obstacles to innovation. A large quantitative survey was then conducted to rank the relative importance of the obstacles constraining the adoption of innovative products on road construction projects. The three most important obstacles were found to be: (1) overemphasis on up-front project costs during tender stage; (2) disagreement over who carries the risk of new product failure; and (3) adversarial contract relations. The results suggest refinements to the conceptual framework to make it a more powerful tool for categorizing and analysing construction innovation obstacles. Results also suggest well-resourced repeat interactions within complementary procurement and regulatory systems will enhance the project teams’ ability to recognize and address innovation obstacles. Further, improved relationships are expected to decrease the need for an overly conservative approach to product approval and prescriptive specifications.
Resumo:
Construction scholars suggest that procurement processes can be used as mechanisms to change construction industry practices. This paper discusses industry changes as a response to the calls for integration of sustainability ideals into construction practices. Because major infrastructure construction has been identified as a key producer of greenhouse gas emissions (GHGE), this study explores collaborative procurement models that have been used to facilitate mitigation of GHGE. The study focuses on the application of non-price incentives and rewards that work together as a binary mechanism. Data were collected using mixed-methods: government document content analysis was complemented with data collected through focus groups and individual interviews with both clients and contractors. This report includes examples of greening procurement agendas for three Australian road authorities relating to collaborative procurement project delivery models. Three collaborative procurement models, Alliance Consortium, Early Contractor Involvement and Public Private Partnerships provide evidence of construction projects that were completed early. It can also be argued that both clients and contractors are rewarded through collaborative project delivery. The incentive of early completion is rewarded with reduction of GHGE. This positive environmental outcome, based on a dual benefit and non-price sustainability criteria, suggests a step towards changed industry practices though the use of green procurement models.
Resumo:
Purpose Performance heterogeneity between collaborative infrastructure projects is typically examined by considering procurement systems and their governance mechanisms at static points in time. The literature neglects to consider the impact of dynamic learning capability, which is thought to reconfigure governance mechanisms over time in response to evolving market conditions. This conceptual paper proposes a new model to show how continuous joint learning of participant organisations improves project performance. Design/methodology/approach There are two stages of conceptual development. In the first stage, the management literature is analysed to explain the Standard Model of dynamic learning capability that emphasises three learning phases for organisations. This Standard Model is extended to derive a novel Circular Model of dynamic learning capability that shows a new feedback loop between performance and learning. In the second stage, the construction management literature is consulted, adding project lifecycle, stakeholder diversity and three organisational levels to the analysis, to arrive at the Collaborative Model of dynamic learning capability. Findings The Collaborative Model should enable construction organisations to successfully adapt and perform under changing market conditions. The complexity of learning cycles results in capabilities that are imperfectly imitable between organisations, explaining performance heterogeneity on projects. Originality/value The Collaborative Model provides a theoretically substantiated description of project performance, driven by the evolution of procurement systems and governance mechanisms. The Model’s empirical value will be tested in future research.
Resumo:
Green infrastructure is considered as a strategic approach to address the ecological and social impacts of urban sprawl. The main elements of green infrastructure have been well established and include a series of multifunctional ecological systems, such as green urban space, green road infrastructure and the links between these systems. However, it should be noted that the elements of green road infrastructure have only been briefly mentioned in isolated life cycle stages, e.g. design, procurement, construction, maintenance and operation. The definition of green road infrastructure and the elements in green road infrastructure projects remain largely unknown. To explore the elements in green road infrastructure, a critical review was adopted. As the development of green road infrastructure projects is guided by rating systems, a comparison of three major green roads rating systems, including GreenroadsTM, EnvisionTM and Infrastructure Sustainability Rating Tool—IS, was conducted. The comparison reveals that green roads can be defined as road projects that have superior performance in economic, social and environmental sustainability. The sustainability features in green roads mainly include environmental sustainability, social sustainability, economic sustainability, quality, pavement technology and innovation. The results will contribute to an increased understanding of green roads and will be useful to improve the performance of road projects on these sustainability features.
Resumo:
Australia is a leading user of collaborative procurement methods, which are used to deliver large and complex infrastructure projects. Project alliances, Early Contractor Involvement (ECI), and partnering are typical examples of collaborative procurement models. In order to increase procurement effectiveness and value for money (VfM), clients have adopted various learning strategies for new contract development. However client learning strategies and behaviours have not been systematically analysed before. Therefore, the current paper undertakes a literature review addressing the research question “How can client learning capabilities be effectively understood?”. From the resource-based and dynamic capability perspectives, this paper proposes that the collaborative learning capability (CLC) of clients drives procurement model evolution. Learning routines underpinning CLC carry out exploratory, transformative and exploitative learning phases associated with collaborative project delivery. This learning improves operating routines, and ultimately performance. The conceptualization of CLC and the three sequential learning phases is used to analyse the evidence in the construction management literature. The main contribution of this study is the presentation of a theoretical foundation for future empirical studies to unveil effective learning strategies, which help clients to improve the performance of collaborative projects in the dynamic infrastructure market.
Resumo:
Public-Private Partnerships (PPP) are established globally as an important mode of procurement and the features of PPP, not least of which the transfer of risk, appeal to governments and particularly in the current economic climate. There are many other advantages of PPP that are claimed as outweighing the costs of PPP and affording Value for Money (VfM) relative to traditionally financed projects or non-PPP. That said, it is the case that we lack comparative whole-life empirical studies of VfM in PPP and non-PPP. Whilst we await this kind of study, the pace and trajectory of PPP seem set to continue and so in the meantime, the virtues of seeking to improve PPP appear incontrovertible. The decision about which projects, or parts of projects, to offer to the market as a PPP and the decision concerning the allocation or sharing risks as part of engagement of the PPP consortium are among the most fundamental decisions that determine whether PPP deliver VfM. The focus in the paper is on latter decision concerning governments’ attitudes towards risk and more specifically, the effect of this decision on the nature of the emergent PPP consortium, or PPP model, including its economic behavior and outcomes. This paper presents an exploration into the extent to which the seemingly incompatible alternatives of risk allocation and risk sharing, represented by the orthodox/conventional PPP model and the heterodox/alliance PPP model respectively, can be reconciled along with suggestions for new research directions to inform this reconciliation. In so doing, an important step is taken towards charting a path by which governments can harness the relative strengths of both kinds of PPP model.
Resumo:
Construction firms that employ collaborative procurement approaches develop operating routines through joint learning so as to improve infrastructure project performance. This paper reports a study based on a survey sample of 320 construction practitioners which were involved in collaborative infrastructure delivery in Australia. The study developed valid and reliable scales for measuring collaborative learning capability (CLC), and used the scales to evaluate the CLC of contractor and consultant firms within the sample. The evaluation suggests that whilst these firms explore knowledge from both internal and external sources, transform both explicit and tacit knowledge, and apply and internalise new knowledge, they can improve the extent to which these routines are applied to optimise project performance.
Resumo:
Spink, S., Urquhart, C., Cox, A. & Higher Education Academy - Information and Computer Sciences Subject Centre. (2007). Procurement of electronic content across the UK National Health Service and Higher Education sectors. Report to JISC executive and LKDN executive. Sponsorship: JISC/LKDN
Resumo:
Urquhart, C. J., Cox, A. M.& Spink, S. (2007). Collaboration on procurement of e-content between the National Health Service and higher education in the UK. Interlending & Document Supply, 35(3), 164-170. Sponsorship: JISC, LKDN
Resumo:
There is a lack of knowledge base in relation to experiences gained and lessons learnt from previously executed National Health Service (NHS) infrastructure projects in the UK. This is in part a feature of one-off construction projects, which typify healthcare infrastructure, and in part due to the absence of a suitable method for conveying such information. The complexity of infrastructure delivery process in the NHS makes the construction of healthcare buildings a formidable task. This is particularly the case for the NHS trusts who have little or no experience of construction projects. To facilitate understanding a most important aspect of the delivery process, which is the preparation of a capital investment proposal; steps taken in developing the business case for an NHS healthcare facility are examined. The context for such examination is provided by the planning process of a healthcare project, studied retrospectively. The process is analysed using a social science based method called ‘building stories’, developed at the University of California-Berkeley. By applying this method, stories or narratives are constructed around the data captured on the case study. The findings indicate that the business case process may be used to justify, rather than identify, trusts’ requirements. The study is useful for UK public sector clients as well as consultants and professionals who aim to participate in the delivery of healthcare infrastructure projects in the UK.
Resumo:
The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trialed. Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.