984 resultados para Energy facilities
Resumo:
Objective The present paper reports on a quality improvement activity examining implementation of A Better Choice Healthy Food and Drink Supply Strategy for Queensland Health Facilities (A Better Choice). A Better Choice is a policy to increase supply and promotion of healthy foods and drinks and decrease supply and promotion of energy-dense, nutrient-poor choices in all food supply areas including food outlets, staff dining rooms, vending machines, tea trolleys, coffee carts, leased premises, catering, fundraising, promotion and advertising. Design An online survey targeted 278 facility managers to collect self-reported quantitative and qualitative data. Telephone interviews were sought concurrently with the twenty-five A Better Choice district contact officers to gather qualitative information. Setting Public sector-owned and -operated health facilities in Queensland, Australia. Subjects One hundred and thirty-four facility managers and twenty-four district contact officers participated with response rates of 48·2 % and 96·0 %, respectively. Results Of facility managers, 78·4 % reported implementation of more than half of the A Better Choice requirements including 24·6 % who reported full strategy implementation. Reported implementation was highest in food outlets, staff dining rooms, tea trolleys, coffee carts, internal catering and drink vending machines. Reported implementation was more problematic in snack vending machines, external catering, leased premises and fundraising. Conclusions Despite methodological challenges, the study suggests that policy approaches to improve the food and drink supply can be implemented successfully in public-sector health facilities, although results can be limited in some areas. A Better Choice may provide a model for improving food supply in other health and workplace settings.
Resumo:
This paper primarily intends to develop a GIS (geographical information system)-based data mining approach for optimally selecting the locations and determining installed capacities for setting up distributed biomass power generation systems in the context of decentralized energy planning for rural regions. The optimal locations within a cluster of villages are obtained by matching the installed capacity needed with the demand for power, minimizing the cost of transportation of biomass from dispersed sources to power generation system, and cost of distribution of electricity from the power generation system to demand centers or villages. The methodology was validated by using it for developing an optimal plan for implementing distributed biomass-based power systems for meeting the rural electricity needs of Tumkur district in India consisting of 2700 villages. The approach uses a k-medoid clustering algorithm to divide the total region into clusters of villages and locate biomass power generation systems at the medoids. The optimal value of k is determined iteratively by running the algorithm for the entire search space for different values of k along with demand-supply matching constraints. The optimal value of the k is chosen such that it minimizes the total cost of system installation, costs of transportation of biomass, and transmission and distribution. A smaller region, consisting of 293 villages was selected to study the sensitivity of the results to varying demand and supply parameters. The results of clustering are represented on a GIS map for the region.
Resumo:
The encircled energy of a focusing lens is one of the parameters directly affecting the target efficiency in high-power laser facilities. The direct measurement method of the encircled energy for the focusing lens based on the scanning Hartmann test is proposed in this paper. With the scanning Hartmann test setup, the information in the whole aperture of the focusing lens can be achieved. The encircled energy can be obtained by analyzing the spot diagram on the focal plane of the focusing lens. In experiments, the encircled energy of an aspheric focusing lens is measured using this method. The measurement result is in good agreement with that derived from measurement data by an interferometer and the difference is 7.7%. (C) 2006 Elsevier GmbH. All rights reserved.
Resumo:
Energy performance labelling and certification have been introduced widely to address market failures affecting the uptake of energy efficient technologies, by providing a signal to support decision making during contracting processes. The UK has recently introduced the Energy Performance Certificate (EPC) as a signal of building energy performance. The aims of this article are: to evaluate how valid EPC's are signals of occupier satisfaction with office facilities; and to understand whether occupant attitudes towards environmental issues have affected commercial office rental values. This was achieved by surveying occupant satisfaction with their workplaces holistically using a novel multi-item rating scale which gathered 204 responses. Responses to this satisfaction scale were matched with the corresponding EPC and rental value of occupier's workplaces. The satisfaction scale was found to be both a reliable and valid measure. The analysis found that EPC asset rating correlates significantly with occupant satisfaction with all facility attributes. Therefore, EPC ratings may be considered valid signals of overall facility satisfaction within the survey sample. Rental value was found to correlate significantly only with facility aesthetics. No evidence suggests rental value has been affected by occupants' perceptions towards the environmental impact of facilities. © 2013 The Authors.
Resumo:
We report some recent progress in constraining the symmetry energy E-sym(rho) at high densities using high-energy heavy-ion collisions. Circumstantial evidence of a soft E-sym(rho) at supra-saturation density is obtained by comparing the pion ratio pi(-)/pi(+) measured recently with FOPI at GSI and the IBUU04 model calculations. Detailed studies indicate that the power of determining the E-sym(rho)from pi(-)/pi(+) is enhanced with decreasing the beam energy to near the pion production threshold, showing a correlation to the increasing nuclear stopping. Among several heavy-ion reaction facilities in the world, the cooling storage ring (HIRFL-CSR), newly commissioned at Lanzhou, delivering heavy-ion beams up to 1 A GeV, to be coupled with advanced detectors will contribute significantly to further studies of the equation of state of asymmetric nuclear matter.
Resumo:
Due to growing concerns regarding the anthropogenic interference with the climate system, countries across the world are being challenged to develop effective strategies to mitigate climate change by reducing or preventing greenhouse gas (GHG) emissions. The European Union (EU) is committed to contribute to this challenge by setting a number of climate and energy targets for the years 2020, 2030 and 2050 and then agreeing effort sharing amongst Member States. This thesis focus on one Member State, Ireland, which faces specific challenges and is not on track to meet the targets agreed to date. Before this work commenced, there were no projections of energy demand or supply for Ireland beyond 2020. This thesis uses techno-economic energy modelling instruments to address this knowledge gap. It builds and compares robust, comprehensive policy scenarios, providing a means of assessing the implications of different future energy and emissions pathways for the Irish economy, Ireland’s energy mix and the environment. A central focus of this thesis is to explore the dynamics of the energy system moving towards a low carbon economy. This thesis develops an energy systems model (the Irish TIMES model) to assess the implications of a range of energy and climate policy targets and target years. The thesis also compares the results generated from the least cost scenarios with official projections and target pathways and provides useful metrics and indications to identify key drivers and to support both policy makers and stakeholder in identifying cost optimal strategies. The thesis also extends the functionality of energy system modelling by developing and applying new methodologies to provide additional insights with a focus on particular issues that emerge from the scenario analysis carried out. Firstly, the thesis develops a methodology for soft-linking an energy systems model (Irish TIMES) with a power systems model (PLEXOS) to improve the interpretation of the electricity sector results in the energy system model. The soft-linking enables higher temporal resolution and improved characterisation of power plants and power system operation Secondly, the thesis develops a methodology for the integration of agriculture and energy systems modelling to enable coherent economy wide climate mitigation scenario analysis. This provides a very useful starting point for considering the trade-offs between the energy system and agriculture in the context of a low carbon economy and for enabling analysis of land-use competition. Three specific time scale perspectives are examined in this thesis (2020, 2030, 2050), aligning with key policy target time horizons. The results indicate that Ireland’s short term mandatory emissions reduction target will not be achieved without a significant reassessment of renewable energy policy and that the current dominant policy focus on wind-generated electricity is misplaced. In the medium to long term, the results suggest that energy efficiency is the first cost effective measure to deliver emissions reduction; biomass and biofuels are likely to be the most significant fuel source for Ireland in the context of a low carbon future prompting the need for a detailed assessment of possible implications for sustainability and competition with the agri-food sectors; significant changes are required in infrastructure to deliver deep emissions reductions (to enable the electrification of heat and transport, to accommodate carbon capture and storage facilities (CCS) and for biofuels); competition between energy and agriculture for land-use will become a key issue. The purpose of this thesis is to increase the evidence-based underpinning energy and climate policy decisions in Ireland. The methodology is replicable in other Member States.
Resumo:
The contribution of buildings towards total worldwide energy consumption in developed countries is between 20% and 40%. Heating Ventilation and Air Conditioning (HVAC), and more specifically Air Handling Units (AHUs) energy consumption accounts on average for 40% of a typical medical device manufacturing or pharmaceutical facility’s energy consumption. Studies have indicated that 20 – 30% energy savings are achievable by recommissioning HVAC systems, and more specifically AHU operations, to rectify faulty operation. Automated Fault Detection and Diagnosis (AFDD) is a process concerned with potentially partially or fully automating the commissioning process through the detection of faults. An expert system is a knowledge-based system, which employs Artificial Intelligence (AI) methods to replicate the knowledge of a human subject matter expert, in a particular field, such as engineering, medicine, finance and marketing, to name a few. This thesis details the research and development work undertaken in the development and testing of a new AFDD expert system for AHUs which can be installed in minimal set up time on a large cross section of AHU types in a building management system vendor neutral manner. Both simulated and extensive field testing was undertaken against a widely available and industry known expert set of rules known as the Air Handling Unit Performance Assessment Rules (APAR) (and a later more developed version known as APAR_extended) in order to prove its effectiveness. Specifically, in tests against a dataset of 52 simulated faults, this new AFDD expert system identified all 52 derived issues whereas the APAR ruleset identified just 10. In tests using actual field data from 5 operating AHUs in 4 manufacturing facilities, the newly developed AFDD expert system for AHUs was shown to identify four individual fault case categories that the APAR method did not, as well as showing improvements made in the area of fault diagnosis.
Resumo:
Building Information Modelling (BIM) is growing in pace, not only in design and construction stages, but also in the analysis of facilities throughout their life cycle. With this continued growth and utilisation of BIM processes, comes the possibility to adopt such procedures, to accurately measure the energy efficiency of buildings, to accurately estimate their energy usage. To this end, the aim of this research is to investigate if the introduction of BIM Energy Performance Assessment in the form of software analysis, provides accurate results, when compared with actual energy consumption recorded. Through selective sampling, three domestic case studies are scrutinised, with baseline figures taken from existing energy providers, the results scrutinised and compared with calculations provided from two separate BIM energy analysis software packages. Of the numerous software packages available, criterion sampling is used to select two of the most prominent platforms available on the market today. The two packages selected for scrutiny are Integrated Environmental Solutions - Virtual Environment (IES-VE) and Green Building Studio (GBS). The results indicate that IES-VE estimated the energy use in region of ±8% in two out of three case studies while GBS estimated usage approximately ±5%. The findings indicate that the introduction of BIM energy performance assessment, using proprietary software analysis, is a viable alternative to manual calculations of building energy use, mainly due to the accuracy and speed of assessing, even the most complex models. Given the surge in accurate and detailed BIM models and the importance placed on the continued monitoring and control of buildings energy use within today’s environmentally conscious society, this provides an alternative means by which to accurately assess a buildings energy usage, in a quick and cost effective manner.
Resumo:
Small-scale, decentralized and community-owned renewable energy is widely acknowledged to be a desirable feature of low carbon futures, but faces a range of challenges in the context of conventional, centralized energy systems. This paper draws on transition frameworks to investigate why the UK has been an inhospitable context for community-owned renewables and assesses whether anything fundamental is changing in this regard. We give particular attention to whether political devolution, the creation of elected governments for Scotland, Wales and Northern Ireland, has affected the trajectory of community renewables. Our analysis notes that devolution has increased political attention to community renewables, including new policy targets and support schemes. However, these initiatives are arguably less important than the persistence of key features of socio-technical regimes: market support systems for renewable energy and land-use planning arrangements that systemically favour major projects and large corporations, and keep community renewables to the margins. There is scope for rolling out hybrid pathways to community renewables, via joint ownership or through community benefit funds, but this still positions community energy as an adjunct to energy pathways dominated by large, corporate generation facilities
Resumo:
Tese de doutoramento, Sistemas Sustentáveis de Energia, Universidade de Lisboa, Faculdade de Ciências, 2015
Resumo:
The trabecular bone score (TBS, Med-Imaps, Pessac, France) is an index of bone microarchitecture texture extracted from anteroposterior dual-energy X-ray absorptiometry images of the spine. Previous studies have documented the ability of TBS of the spine to differentiate between women with and without fractures among age- and areal bone mineral density (aBMD)-matched controls, as well as to predict future fractures. In this cross-sectional analysis of data collected from 3 geographically dispersed facilities in the United States, we investigated age-related changes in the microarchitecture of lumbar vertebrae as assessed by TBS in a cohort of non-Hispanic US white American women. All subjects were 30 yr of age and older and had an L1-L4aBMDZ-score within ±2 SD of the population mean. Individuals were excluded if they had fractures, were on any osteoporosis treatment, or had any illness that would be expected to impact bone metabolism. All data were extracted from Prodigy dual-energy X-ray absorptiometry devices (GE-Lunar, Madison, WI). Cross-calibrations between the 3 participating centers were performed for TBS and aBMD. aBMD and TBS were evaluated for spine L1-L4 but also for all other possible vertebral combinations. To validate the cohort, a comparison between the aBMD normative data of our cohort and US non-Hispanic white Lunar data provided by the manufacturer was performed. A database of 619 non-Hispanic US white women, ages 30-90 yr, was created. aBMD normative data obtained from this cohort were not statistically different from the non-Hispanic US white Lunar normative data provided by the manufacturer (p = 0.30). This outcome thereby indirectly validates our cohort. TBS values at L1-L4 were weakly inversely correlated with body mass index (r = -0.17) and weight (r = -0.16) and not correlated with height. TBS values for all lumbar vertebral combinations decreased significantly with age. There was a linear decrease of 16.0% (-2.47 T-score) in TBS at L1-L4 between 45 and 90 yr of age (vs. -2.34 for aBMD). Microarchitectural loss rate increased after age 65 by 50% (-0.004 to -0.006). Similar results were obtained for other combinations of lumbar vertebra. TBS, an index of bone microarchitectural texture, decreases with advancing age in non-Hispanic US white women. Little change in TBS is observed between ages 30 and 45. Thereafter, a progressive decrease is observed with advancing age. The changes we observed in these American women are similar to that previously reported for a French population of white women (r(2) > 0.99). This reference database will facilitate the use of TBS to assess bone microarchitectural deterioration in clinical practice.
Resumo:
The energy decomposition scheme proposed in a recent paper has been realized by performing numerical integrations. The sample calculations carried out for some simple molecules show excellent agreement with the chemical picture of molecules, indicating that such an energy decomposition analysis can be useful from the point of view of connecting quantum mechanics with the genuine chemical concepts
Resumo:
The Bahrain International Circuit (BIC) and complex, at latitude 26.00N and longitude 51.54E, was built in 483 days and cost 150 million US$. The circuit consists of six different individual tracks with a 3.66 km outer track (involving 10 turns) and a 2.55 km inner track (having six turns). The complex has been designed to host a variety of other sporting activities. Fifty thousand spectators, including 10,500 in the main grandstand, can be accommodated simultaneously. State-of-the art on-site media and broadcast facilities are available. The noise level emitted from vehicles on the circuit during the Formula-1 event, on April 4th 2004, was acceptable and caused no physical disturbance to the fans in the VIP lounges or to scholars studying at the University of Bahrain's Shakeir Campus, which is only 1.5 km away from the circuit. The sound-intensity level (SIL) recorded on the balcony of the VIP lounge was 128 dB(A) and was 80 dB(A) inside the lounge. The calculated SIL immediately outside the lecture halls of the University of Bahrain was 70 dB(A) and 65 dB(A) within them. Thus racing at BIC can proceed without significantly disturbing the academic-learning process. The purchased electricity demand by the BIC complex peaked (at 4.5 MW) during the first Formula-1 event on April 4th 2004. The reverse-osmosis (RO) plant at the BIC provides 1000 m(3) of desalinated water per day for landscape irrigation. Renewable-energy inputs, (i.e., via solar and wind power), at the BIC could be harnessed to generate electricity for water desalination, air conditioning, lighting as well as for irrigation. If the covering of the BIC complex was covered by adhesively fixed modern photovoltaic cells, then similar to 1.2 MW of solar electricity could be generated. If two horizontal-axis, at 150 m height above the ground, three 75m bladed, wind turbines were to be installed at the BIC, then the output could reach 4 MW. Furthermore, if 10,000 Jojoba trees (a species renowned for having a low demand for water, needing only five irrigations per year in Bahrain and which remain green throughout the year) are planted near the circuit, then the local micro-climate would be improved with respect to human comfort as well as the local environment becoming cleaner.
Resumo:
The construction industry with its nature of project delivery is very fragmented in terms of the various processes that encompass design, construction, facilities and assets management. Facilities managers are in the forefront of delivering sustainable assets management and hence further the venture for mitigation and adaptation to climate change. A questionnaire survey was conducted to establish perceptions, level of commitment and knowledge chasm in practising sustainable facilities management (FM). This has significant implications for sustainable design management, especially in a fragmented industry. The majority of questionnaire respondents indicated the importance of sustainability for their organization. Many of them stated that they reported on sustainability as part of their organization annual reporting with energy efficiency, recycling and waste reduction as the main concern for them. The overwhelming barrier for implementing sound, sustainable FM is the lack of consensual understanding and focus of individuals and organizations about sustainability. There is a knowledge chasm regarding practical information on delivering sustainable FM. Sustainability information asymmetry in design, construction and FM processes render any sustainable design as a sentiment and mere design aspiration. Skills and training provision, traditionally offered separately to designers and facilities managers, needs to be re-evaluated. Sustainability education and training should be developed to provide effective structures and processes to apply sustainability throughout the construction and FM industries coherently and as common practice.
Resumo:
Electricity consumption in Ghana is estimated to be increasing by 10% per annum due to the demand from the growing population. However, current sources of production (hydro and thermal facilities) generate only 66% of the current demand. Considering current trends, it is difficult to substantiate these basic facts, because of the lack of information. As a result, research into the existing sources of generating electricity, electricity consumption and prospective projects has been performed. This was achieved using three key techniques; review of literature, empirical studies and modelling. The results presented suggest that, current annual installed capacity of energy generation (i.e. 1960 MW) must be increased to 9,405.59 MW, assuming 85% plant availability. This is then capable to coop with the growing demand and it would give access to the entire population as well as support commercial and industrial activities for the growth of the economy. The prospect of performing this research is with the expectation to present an academic research agenda for further exploration into the subject area, without which the growth of the country would be stagnant.