924 resultados para Competitive Displacement
Resumo:
The control and coordination of multiple mobile robots is a challenging task; particularly in environments with multiple, rapidly moving obstacles and agents. This paper describes a robust approach to multi-robot control, where robustness is gained from competency at every layer of robot control. The layers are: (i) a central coordination system (MAPS), (ii) an action system (AES), (iii) a navigation module, and (iv) a low level dynamic motion control system. The multi-robot coordination system assigns each robot a role and a sub-goal. Each robots action execution system then assumes the assigned role and attempts to achieve the specified sub-goal. The robots navigation system directs the robot to specific goal locations while ensuring that the robot avoids any obstacles. The motion system maps the heading and speed information from the navigation system to force-constrained motion. This multi-robot system has been extensively tested and applied in the robot soccer domain using both centralized and distributed coordination.
Resumo:
Value Management (VM) has been proven to provide a structured framework, together with supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It is identified at International level as a natural career progression for the construction service provider and as an opportunity in developing leading-edge skills. The services offered by contractors and consultants in the construction sector have been expanding. In an increasingly competitive and global marketplace, firms are seeking ways to differentiate their services to ever more knowledgeable and demanding clients. The traditional demarcations have given way, and the old definition of what contractors, designers, engineers and quantity surveyors can, and cannot do in terms of their market offering has changed. Project management, design and cost and safety consultancy services, are being delivered by a diverse range of suppliers. Value management services have been developing in various sectors in industry; from manufacturing to the military and now construction. Given the growing evidence that VM has been successful in delivering value-for-money to the client, VM would appear to be gaining some momentum as an essential management tool in the Malaysian construction sector. The recently issued VM Circular 3/2009 by the Economic Planning Unit Malaysia (EPU) possibly marks a new beginning in public sector client acceptance on the strength of VM in construction. This paper therefore attempts to study the prospects of marketing the benefits of VM by construction service providers, and how it may provide an edge in an increasingly competitive Malaysian construction industry.
Resumo:
Managing for uncertain futures is a major concern in the area of strategic management with environmental stability fading and increasing global impacts on local decisions. One critical resource that has attained special interest lies in talented and qualified employees. It is a challenge to motivate such employees to invest in firm-specific assets that may form a valuable basis for competitive advantage. Short term contracts and a lack of care for employees make it hard to establish a committed workforce. The aim of the paper is the elaboration of a conceptual framework showing the links and contributing to a better understanding of how the alignment of interests of employees and firms maybe a valuable contribution to the understanding of competitive advantage.
Resumo:
This chapter investigates the challenges and opportunities associated with planning for a competitive city. The chapter is based on the assumption that a healthy city is a fundamental prerequisite for a competitive city. Thus, it is critical to examine the local determinants of health and factor these into any planning efforts. The main focus of the chapter is on the role of e-health planning, by utilising web-based geographic decision support systems. The proposed novel decision support system would provide a powerful and effective platform for stakeholders to access essential data for decision-making purposes. The chapter also highlights the need for a comprehensive information framework to guide the process of planning for healthy cities. Additionally, it discusses the prospects and constraints of such an approach. In summary, this chapter outlines the potential insights of using information science-based framework and suggests practical planning methods, as part of a broader e-health approach for improving the health characteristics of competitive cities.
Resumo:
Since 2000-2001, dengue virus type 1 has circulated in the Pacific region. However, in 2007, type 4 reemerged and has almost completely displaced the strains of type 1. If only 1 serotype circulates at any time and is replaced approximately every 5 years, DENV-3 may reappear in 2012.
Resumo:
Research on workforce diversity at the organisational level gained momentum in the 1990s, because of the growing trend in HR research to link HR practices with organisational performance. The new parallel wave of research focused on the business case for diversity, in which diversity was linked to organisational performance. However, the results of these studies, mainly focusing on linear diversity-performance relationships, have been inconsistent. Based on contrasting theories, this paper proposes three competing predictions of the gender diversity-performance relationship at the organisational level: a positive linear relationship derived from the resource-based view of the firm, a negative linear relationship derived from self-categorisation and social identity theories, and a U-shaped curvilinear relationship derived from the integration of the resource-based view of the firm with self-categorisation and social identity theories. The U-shaped relationship accounts for the inconsistent findings in past research, because different proportions of men and women produce different social dynamics that have different effects on organisational performance. Further, the proposed U-shaped relationship can have different slopes in the manufacturing and services industries. The paper contributes to the field of diversity by strengthening its weak theoretical foundations and by highlighting the industry differences.
Resumo:
Pragmatic construction professionals, accustomed to intense price competition and focused on the bottom line, have difficulty justifying investments in advanced technology. Researchers and industry professionals need improved tools to analyze how technology affects the performance of the firm. This paper reports the results of research to begin answering the question, “does technology matter?” The researchers developed a set of five dimensions for technology strategy, collected information regarding these dimensions along with four measures of competitive performance in five bridge construction firms, and analyzed the information to identify relationships between technology strategy and competitive performance. Three technology strategy dimensions—competitive positioning, depth of technology strategy, and organizational fit—showed particularly strong correlations with the competitive performance indicators of absolute growth in contract awards and contract award value per technical employee. These findings indicate that technology does matter. The research also provides ways to analyze options for approaching technology and ways to relate technology to competitive performance for use by managers. It also provides a valuable set of research measures for technology strategy.
Resumo:
This current report, It’s About Time: Investing in Transportation to Keep Texas Economically Competitive, updates the February 2009 report by providing an enhanced analysis of the current state of the Texas transportation system, determining the household costs of under-investing in the system and identifying potential revenue options for funding the system. However, the general conclusion has not changed. There are tremendous needs and high costs associated with “doing nothing new.”
Resumo:
Doctoral dissertation, Stanford University, California, 1993
Resumo:
Earlier research developed theoretically-based aggregate metrics for technology strategy and used them to analyze California bridge construction firms (Hampson, 1993). Determinants of firm performance, including trend in contract awards, market share and contract awards per employee, were used as indicators for competitive performance. The results of this research were a series of refined theoretically-based measures for technology strategy and a demonstrated positive relationship between technology strategy and competitive performance within the bridge construction sector. This research showed that three technology strategy dimensions—competitive positioning, depth of technology strategy, and organizational fit— show very strong correlation with the competitive performance indicators of absolute growth in contract awards, and contract awards per employee. Both researchers and industry professionals need improved understanding of how technology affects results, and how to better target investments to improve competitive performance in particular industry sectors. This paper builds on the previous research findings by evaluating the strategic fit of firms' approach to technology with industry segment characteristics. It begins with a brief overview of the background regarding technology strategy. The major sections of the paper describe niches and firms in an example infrastructure construction market, analyze appropriate technology strategies, and describe managerial actions to implement these strategies and support the business objectives of the firm.