986 resultados para Airport construction contracts


Relevância:

80.00% 80.00%

Publicador:

Resumo:

This document outlines a framework that could be used by government agencies in assessing policy interventions aimed at achieving social outcomes from government construction contracts. The framework represents a rational interpretation of the information gathered during the multi-outcomes construction policies project. The multi-outcomes project focused on the costs and benefits of using public construction contracts to promote the achievement of training and employment and public art objectives. The origin of the policy framework in a cost-benefit appraisal of current policy interventions is evidenced by its emphasis on sensitivity to policy commitment and project circumstances (especially project size and scope).The quantitative and qualitative analysis conducted in the multi-outcomes project highlighted, first, that in the absence of strong industry commitment to policy objectives, policy interventions typically result in high levels of avoidance activity, substantial administrative costs and very few benefits. Thus, for policy action on, for example, training or local employment to be successful compliance issues must be adequately addressed. Currently it appears that pre-qualification schemes (similar to the Priority Access Scheme) and schemes that rely on measuring, for example, the training investments of contractors within particular projects do not achieve high levels of compliance and involve significant administrative costs. Thus, an alternative is suggested in the policy framework developed here: a levy on each public construction project – set as a proportion of the total project costs. Although a full evaluation of this policy alternative was beyond the scope of the multi-outcomes construction policies project, it appears to offer the potential to minimize the transaction costs on contractors whilst enabling the creation of a training agency dedicated to improving the supply of skilled construction labour. A recommendation is thus made that this policy alternative be fully researched and evaluated. As noted above, the outcomes of the multi-outcomes research project also highlighted the need for sensitivity to project circumstances in the development and implementation of polices for public construction projects. Ideally a policy framework would have the flexibility to respond to circumstances where contractors share a commitment to the policy objectives and are able to identify measurable social outcomes from the particular government projects they are involved in. This would involve a project-by-project negotiation of goals and performance measures. It is likely to only be practical for large, longer term projects.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This thesis provides a behavioural perspective to the problem of collusive tendering in the construction market by examining the decision making factors of individuals potentially involved in such agreements using marketing ethics theory and techniques. The findings of a cross disciplinary literature review were synthesised into a model of factors theoretically expected to determine the individual's behavioural intent towards a set of collusive tendering agreements and the means of reaching them. The factors were grouped as internal cognitive (the individuals' value systems) and affective (demographic and psychographic characteristics) as well as external environmental (legal, industrial and organisational codes and norms) and situational (company, market and economic conditions). The model was tested using empirical data collected through a questionnaire survey of estimators employed in the largest Australian construction firms. All forms of explicit collusive tendering agreements were considered as having a prohibitive moral content by the majority of respondents who also clearly differentiated between agreements and discussions of contract terms (which they found to be a moral concern but not prohibitive) or of prices. The comparisons between those of the respondents that would never participate in a collusive agreement and the potential offenders clearly showed two distinctly different groups. The law abiding estimators are less reliant on situational factors, happier and more comfortable in their work environments and they live according to personal value and belief systems. The potential offenders on the other hand are mistrustful of colleagues, feel their values are not respected, put company priorities above principles and none of them is religious or a member of a professional body. The research results indicate that Australian estimators are, overall law abiding and principled and accept the existing codification of collusion as morally defensible and binding. Professional bodies' and organisational codes of conduct as well as personal value and belief systems that guide one's own conduct appear to be deterrents to collusive tendering intent and so are moral comfort and work satisfaction. These observations are potential indicators of areas where intervention and behaviour modification can increase individuals' resistance to collusion.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This thesis investigates the Value Management processes used by construction project clients that effects project team involvement in VM workshops during the design stage of the projects. It is based on five case studies of the Malaysian international airport construction project packages. The focus of the research is on how issues related to infrastructure design that can improve construction processes on-site are being identified, analysed and resolved through multi-disciplinary team participation. The degrees of interaction, diversity of visualisation aids, certain cultural dimensions and the system thinking approach are found to have significant influence in maximizing participation among project team members during the entire VM workshop process.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Digital image

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Synthetic Geology Information System (SGIS) is an important constituent part of the theory of Engineering Geomechanics Mate-Synthetic (EGMS), and is the information system more suited for the collection, storage, management, analysis and processing to the information coming from engineering geology,' geological engineering and geotechnical engineering. Its contents involve various works and methods of the investigation, design, and construction in different stages of the geological engineering. Engineering geological and three-dimensional modeling and visualization is the fundamental part of the SGIS, and is a theory, method and technique by which, adopting the computer graphics and image processing techniques, the data derived from engineering geological survey and the calculated results obtained from the geomechanical numerical simulation and analysis are converted to the graphics and images displayed on the computer screen and can be processed interactively. In this paper, the significance and realizing approaches of the three-dimensional modeling and visualization for the complex geological mass in the engineering geology are discussed and the methods of taking advantage of the interpolation and fitting for the scattered and field-surveyed data to simulate the geological layers, such as the topography and earth surface, the groundwater table and the stratum boundary, are researched into. At the mean time, in mind the characteristics of the structure of the basic data for three-dimensional modeling, its visual management can be resolved into the engineering surveyed database management module, plot parameter management module and data output module and the requirement for basic data management can be fulfilled. In the paper, the establishment and development of the three-dimensional geological information system are probed tentatively, and an instance of three-dimensional visual Engineering Distribution Information System (EDIS), theConstruction Management Information System for an airport, in which the functions, such as the real-time browse among the three-dimensional virtual-reality landscapes of the airport construction from start to finish, the information query to the airport facility and the building in the housing district and the recording and playback of the animation sets for the browse and the takeoff and landing of the planes, is developed by applying the component-mode three-dimensional virtual-reality geological information system (GIS) software development kits (SDK), so the three-dimensional visual management platform is provided for the airport construction. Moreover, in the gaper, integrated with the three-dimensional topography visualization and its application in the Sichuan-Tibet Highways, the method of the digital elevation model (DEM) data collection from the topographic maps is described, and the three-dimensional visualization and the roaming about the terrain along the highway are achieved through computer language programming. Understanding to the important role played by the varied and unique topographical condition in the gestation and germination of the highly-dense, frequently-arising and severely-endangered geological hazards can be deepened.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

In the engineering reinforcement of-rock and soil mass, engineers must consider how to obtain better reinforcing effect at the cost of less reinforcing expense, which, in fact, is the aim of reinforcement design. In order to accomplish the purpose, they require not only researching the material used to reinforce and its structure, but also taking into account of several important geological factors, such as the structure and property of rock and soil mass. How to improve the reinforcing effect according to engineering geomechanical principle at the respect of the reinforcement of engineering soil and rock mass is studied and discussed in this paper. The author studies the theory, technology and practice of geotechnical reinforcement based on engineering geomechanics, taking example for the soil treatment of Zhengzhou Airport, the effect analysis of reinforcement to the slope on the left bank of Wuqiangxi Hydropower Station and the reinforcing design of the No. 102 Landslide and unique sand-slide slope on the Sichuan-Tibet Highway. The paper is comprised of two parts for the convenience of discussion. In the first part, from the first chapter to the fifth chapter, trying to perform the relevant research and application at the viewpoint of soil mass engineering geomechanics, the author mainly discusses the study of reinforcing soft ground soil through dynamical consolidation and its application. Then, in the second part, from the sixth chapter to the eleventh chapter, the study of new technologies in the rock slope reinforcement and their application are discussed. The author finds that not only better reinforcing effect can be gained in the research where the principle and method of rock mass engineering geomechanics is adopted, but also new reinforcing technologies can be put forward. Zhengzhou Airport is an important one in central plains. It lies on Yellow River alluvial deposit and the structure of stratum is complex and heterogeneous. The area of airport is very large, which can result in differential settlement easily, damage of airport and aircraft accident, whereas, there are no similar experiences to dispose the foundation, so the foundation treatment become a principal problem. During the process of treatment, the method of dynamic compaction was adopted after compared with other methods using the theory of synthetic integration. Dynamic compaction is an important method to consolidate foundation, which was successfully used in the foundation of Zhengzhou Airport. For fill foundation, controlling the thickness of fill so as to make the foundation treatment can reach the design demand and optimum thickness of the fill is a difficult problem. Considering this problem, the author proposed a calculation method to evaluate the thickness of fill. The method can consider not only the self-settlement of fill but also the settlement of the ground surface under applied load so as to ensure the settlement occurred during the using period can satisfy the design demand. It is proved that the method is correct after using it to choose reasonable energy of dynamic compaction to treat foundation. At the same time, in order to examine the effect of dynamic compaction, many monitor methods were adopted in the test such as static loading test, modulus of resilience test, deep pore pressure -test, static cone penetration test and the variation of the pore volume measurement. Through the tests, the author summarized the discipline of the accumulation and dissipation of pore pressure in Yellow River alluvial deposit under the action of dynamic compaction, gave a correct division of the property change of silt and clay under dynamic compaction, determined the bearing capacity of foundation after treatment and weighted the reinforcing effect of dynamic consolidation from the variation of the soil particle in microcosmic and the parameter of soil mass' density. It can be considered that the compactness of soil is in proportion to the energy of dynamic compaction. This conclusion provided a reference to the research of the "Problem of Soil Structure-the Central Problem of Soil Mechanics in 21 Century ". It is also important to strengthen rock mass for water conservancy and electric power engineering. Slip-resistance pile and anchoring adit full of reinforced concrete are usually adopted in engineering experience to strengthen rock mass and very important for engineering. But there also some deficiency such as the weakest section can't be highlighted, the monitor is inconvenient and the diameter of pile and adit is very large etc. The author and his supervisor professor Yangzhifa invented prestressed slip-resistance pile and prestressed anchoring adit full of reinforced concrete, utilizing the advantage that the prestressed structure has better anti-tensile characteristic (this invention is to be published). These inventions overcome the disadvantages of general slip-resistance pile and anchoring adit full of reinforced concrete and have the functions of engineering prospecting, strengthening, drainage and monitor simultaneous, so they have better strengthened effect and be more convenient for monitor and more economical than traditional methods. Drainage is an important factor in treatments of rock mass and slop. In view of the traditional drainage method that drainage pore often be clogged so as to resulted in incident, professor Yangzhifa invented the method and setting of guide penetration by fiber bundle. It would take good effect to use it in prestressed slip-resistance pile and anchoring adit full of reinforced concrete. In this paper, the author took example for anchoring adit full of reinforced concrete used to strengthen Wuqiangxi left bank to simulate the strengthened effect after consolidated by prestressed slip-resistance pile, took example for 102 landslide occurred along Sichuan-Tibet highway to simulate the application of slip-resistance pile and the new technology of drainage. At the same time the author proposed the treatment method of flowing sand in Sichuan-Tibet highway, which will benefit the study on strengthening similar engineering. There are five novelties in the paper with the author's theoretical study and engineering practice: 1. Summarizing the role of pore water pressure accumulation and dissipation of the Yellow River alluvial and diluvial soil under the action of dynamical consolidation, which has instructive significance in the engineering construction under the analogical engineering geological conditions in the future. It has not been researched by the predecessors. 2. Putting forward the concept of density D in microcosmic based on the microcosmical structure study of the soil sample. Adopting D to weight the reinforcing effect of dynamic consolidation is considered to be appropriate by the means of comparing the D values of Zhengzhou Airport's ground soil before with after dynamically consolidating reinforcement, so a more convenient balancing method can be provided for engineering practice. 3. According to the deep research into the soil mass engineering geology, engineering rock and soil science, soil mechanics, as well as considerable field experiments, improving the consolidating method in airport construction, from the conventional method, which is dynamically compactmg original ground surface firstly, then filling soil and dynamically layer-consolidating or layer-compacting at last to the upgraded method, which is performing dynamical consolidation after filling soil to place totally at the extent of the certain earth-filling depth. The result of the dynamical consolidation not only complies with the specifications, but also reduces the soil treatment investment by 10 million RMB. 4. Proposing the method for calculating the height of the filled soil by the means of estimating the potential displacement produced in the original ground surface and the filled earth soil under the possible load, selecting the appropriate dynamically-compacting power and determining the virtual height of the filled earth soil. The method is proved to be effective and scientific. 5. According to the thought of Engineering Geomechanics Metal-Synthetic Methodology (EGMS), patenting two inventions (to the stage of roclamation, with Professor Yang Zhi-fa, the cooperative tutor, and etc.) in which multi-functions, engineering geological investigation, reinforcement, drainage and strength remedy, are integrated all over in one body at the viewpoint of the breakage mechanism of the rock slope.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The scope of the following study is to present an alternative and preventive dispute resolution method known as Dispute Resolution Board. The Dispute Resolution Board mechanism is included in construction contracts to support project participants in avoiding and resolving disputes. Over the years the construction industry dealt with the resolution of claims and disputes through several methods. One of the most successful and lasting is the Dispute Resolution Board. A Dispute Resolution Board is a board of impartial professionals formed at the start of the project to follow construction progress, prevent arising disputes, and assist in the resolution of disputes during the project. When a dispute arises the Board meets with the parties to settle this dispute. The recommendation of this Board is non-binding for the parties. In Portugal there is no experience with this form of conciliation.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Financial Protection in the UK Building Industry provides comprehensive treatment of a complex aspect of construction management which is increasingly important in modern construction contracts. The term 'Financial Protection' refers to refers to the various mechanisms by which funds are made available to ensure the due performance of a partys contractual obligations. This book is based on material written for a research project funded by the Reading Construction Forum. Financial Protection in the UK Building Industry looks at the legal and economic background to the problem of providing financial protection to clients to guard against poor performance and or the insolvency of contractors, consultants and sub-contractors. The inclusion of practical guidance notes and summaries makes this a valuable guide for the construction professional as well as for the researcher. * provides in-depth analysis of financial protection measures * explores the ways in which financial protection can increase efficiency in the industry * financial protection in construction is beset with problems - this book points toward practical solutions

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Este trabalho analisa a sistemática de contratações inerentes à atividade de construção civil, inserida num ambiente de liberdade de contratação e levando em consideração a criação de modelos atípicos e, portanto, híbridos. Para tal, faz-se necessária uma gama de subsídios: aplicação de argumentos econômicos; capacidade de operacionalizar objetivamente as demandas oriundas de tais modalidades de contratos, que sempre visa maximizar seus resultados; necessidade de velocidade e economia de tempo nas construções. Há de se destacar que os referidos modelos de contrato são híbridos, sim, mas nem por isso ilícitos, posto que, no direito brasileiro, vigora o princípio de liberdade de contratar, desde que tais contratações estejam assentadas em princípios básicos estabelecidos por lei, quais sejam: objeto lícito, agentes capazes e atendimento à forma prescrita ou não defesa em lei. Esse ambiente de liberdade de contratação propiciou a criação de modelos atípicos e moventes de contratos de construção, que variam e se mesclam entre si sob os mais diversos aspectos, com destaque para: alocação de riscos; forma de remuneração e aplicação de penalidades, o que impacta diretamente na forma, conteúdo e valor do orçamento a ser apresentado. Desse modo, é imperioso que as rédeas desses diversos modelos de contratação estejam direcionadas pelo racional econômico, não só em grandes obras de infraestrutura, mas também em outros empreendimentos, fazendo emergir uma cultura de participação entre os contratantes, de forma a propiciar obras mais rápidas e com um menor custo, que seria de fundamental importância para o desenvolvimento do país.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

As empresas estatais são freqüentemente consideradas como componentes cruciais da economia de um país. Eles são responsáveis pela criação de vários postos de trabalho e proveem serviços essenciais que exigem um grande investimento de capital. Porém, em países com instituições fracas, onde a responsabilidade dos políticos é limitada e a gestão dos recursos financeiros das empresas estatais sofre pouco controle, os funcionários são muitas vezes tentados pela corrupção. Enormes quantidades de fundos públicos são facilmente desviados, e dinheiro que deveria ter sido investido nas despesas de capital, no pagamento de dívida da empresa ou no aumento do retorno para os acionistas, é usado para aumentar a riqueza privada de indivíduos ou para financiar ilegalmente partidos políticos. O desempenho da empresa sofre com essas alienações visto que parte dos lucros da empresa não são reinvestidos na empresa e dado que incentivos dos gestores estão desalinhados com os interesses dos acionistas. Petrobras, a maior empresa da América Latina em termos de ativos e receitas anuais, sofreu em 2014 e 2015 um escândalo de corrupção imenso, cujo impacto económico foi considerável, levando ao enfraquecimento da confiança de muitos investidores no Brasil após o evento. O escândalo expôs um extenso esquema de corrupção através do qual os contratantes foram conspirando para aumentar os preços de contratos de construção, com a aprovação da administração da Petrobras que pediu em troca ganhos pessoais ou fundos para o Partido dos Trabalhadores (PT). A exposição do escândalo na imprensa brasileira teve um grande impacto sobre a credibilidade da Petrobras: as contas da empresa estavam escondendo imensas irregularidades dado que a empresa tinha pago demais para os contratos de construção que não foram precificados no valor do mercado. Ao longo deste estudo, usamos o exemplo da Petrobras para ilustrar como a corrupção dentro empresas estatais prejudica o desempenho da empresa e como ela afeta as várias partes interessadas da empresa.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Title from cover.