974 resultados para Software requirements specifications


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para obtenção do grau de Mestre em Engenharia Civil na Área de Especialização de Vias de Comunicação e Transportes

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The aim of the TeleRisk Project on labour relations and professional risks within the context of teleworking in Portugal – supported by IDICT – Institute for Development and Inspection of Working Conditions (Ministry of Labour), is to study the practices and forms of teleworking in the manufacturing sectors in Portugal. The project chose also the software industry as a reference sector, even though it does not intend to exclude from the study any other sector of activity or the so-called “hybrid” forms of work. However, the latter must have some of the characteristics of telework. The project thus takes into account the so-called “traditional” sectors of activity, namely textile and machinery and metal engineering (machinery and equipment), not usually associated to this type of work. However, telework could include, in the so-called “traditional” sectors, other variations that are not found in technologically based sectors. One of the evaluation methods for the dynamics associated to telework consisted in carrying out surveys by means of questionnaires, aimed at employers in the sectors analysed. This paper presents some of the results of those surveys. It is important to mention that, being a preliminary analysis, it means that it does not pretend to have exhausted all the issues in the survey, but has meant that it shows the bigger tendencies, in terms of teleworking practices, of the Portuguese industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Flexible forms of work like project work are gaining importance in industry and services. Looking at the research on project work, the vast majority of present literature is on project management, but increasingly, problems concerning the quality of work and the efficiency of project teams become visible. The question now is how project work can be structured in order to simultaneously provide efficient and flexible work and healthy working conditions ensuring the development of human resources for a long time. Selected results of publicly funded research into project work will be presented based on case studies in 7 software development /IT consulting project teams (N=34). A set of different methods was applied: interviews with management/project managers, group interviews on work constraints, a monthly diary about well-being and critical incidences in the course of the project, and a final evaluation questionnaire on project outcomes focusing on economic and health aspects. Findings reveal that different types of projects exist with varying degree of team members’ autonomy and influence on work structuring. An effect of self-regulation on mental strain could not be found. The results emphasize, that contradicting requirements and insufficient organizational resources with respect to the work requirements lead to an increased work intensity or work obstruction. These contradicting requirements are identified as main drivers for generating stress. Finally, employees with high values on stress for more than 2 months have significantly higher exhaustion rates than those with only one month peaks. Structuring project work and taking into account the dynamics of project work, there is a need for an active role of the project team in contract negotiation or the detailed definition of work – this is not only a question of individual autonomy but of negotiation the range of option for work structuring. Therefore, along with the sequential definition of the (software) product, the working conditions need to be re-defined.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Consider a multihop network comprising Ethernet switches. The traffic is described with flows and each flow is characterized by its source node, its destination node, its route and parameters in the generalized multiframe model. Output queues on Ethernet switches are scheduled by static-priority scheduling and tasks executing on the processor in an Ethernet switch are scheduled by stride scheduling. We present schedulability analysis for this setting.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação de Mestrado em Engenharia Informática

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Informática

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Unstabilized rammed earth is a recyclable, economical, and eco-friendly building material, used in the past and still applied today. Traditionally, its use was based on a long empirical knowledge of the local materials. Because this knowledge was mostly lost or is no longer sufficient, in many countries normative documents have been produced to allow the assessment of rammed earth soils. With the aim of contributing for a refining of these normative requirements, this article presents a research work that included: (i) collection of Unstabilized rammed earth samples from six constructions in Portugal; (ii) a literature survey of normative and complementary documents to identify the most mentioned key-properties, the test procedures and the corresponding threshold limits; and (iii) a discussion of the test procedures and of the thresholds limits in the light of the experimental results. The analyzed properties are the particle size distribution, maximum particle size, plasticity, compaction, linear shrinkage, organic content, and salt content. The work highlights the advantages of taking into account the characteristics of existing constructions as a basis for the establishment and further refining of consistent threshold values. In particular, it shows that it is essential to adjust the requirements to the specificities of local materials.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The IEEE 802.15.4 Medium Access Control (MAC) protocol is an enabling technology for time sensitive wireless sensor networks thanks to its Guaranteed-Time Slot (GTS) mechanism in the beacon-enabled mode. However, the protocol only supports explicit GTS allocation, i.e. a node allocates a number of time slots in each superframe for exclusive use. The limitation of this explicit GTS allocation is that GTS resources may quickly disappear, since a maximum of seven GTSs can be allocated in each superframe, preventing other nodes to benefit from guaranteed service. Moreover, the GTSs may be only partially used, resulting in wasted bandwidth. To overcome these limitations, this paper proposes i-GAME, an implicit GTS Allocation Mechanism in beacon-enabled IEEE 802.15.4 networks. The allocation is based on implicit GTS allocation requests, taking into account the traffic specifications and the delay requirements of the flows. The i-GAME approach enables the use of a GTS by multiple nodes, while all their (delay, bandwidth) requirements are still satisfied. For that purpose, we propose an admission control algorithm that enables to decide whether to accept a new GTS allocation request or not, based not only on the remaining time slots, but also on the traffic specifications of the flows, their delay requirements and the available bandwidth resources. We show that our proposal improves the bandwidth utilization compared to the explicit allocation used in the IEEE 802.15.4 protocol standard. We also present some practical considerations for the implementation of i-GAME, ensuring backward compatibility with the IEEE 801.5.4 standard with only minor add-ons.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Time-sensitive Wireless Sensor Network (WSN) applications require finite delay bounds in critical situations. This paper provides a methodology for the modeling and the worst-case dimensioning of cluster-tree WSNs. We provide a fine model of the worst-case cluster-tree topology characterized by its depth, the maximum number of child routers and the maximum number of child nodes for each parent router. Using Network Calculus, we derive “plug-and-play” expressions for the endto- end delay bounds, buffering and bandwidth requirements as a function of the WSN cluster-tree characteristics and traffic specifications. The cluster-tree topology has been adopted by many cluster-based solutions for WSNs. We demonstrate how to apply our general results for dimensioning IEEE 802.15.4/Zigbee cluster-tree WSNs. We believe that this paper shows the fundamental performance limits of cluster-tree wireless sensor networks by the provision of a simple and effective methodology for the design of such WSNs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada para a obtenção do Grau de Doutor em Informática pela Universidade Nova de Lisboa, Faculdade de Ciências e Tecnologia

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação de Mestrado em Engenharia Informática

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia do Ambiente, Perfil de Engenharia Sanitária

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Trabalho realizado sob orientação do Prof. António Brandão Moniz para a disciplina “Factores Sociais da Inovação” do Mestrado Engenharia Informática realizado na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The purpose of this paper is to discuss the linear solution of equality constrained problems by using the Frontal solution method without explicit assembling. Design/methodology/approach - Re-written frontal solution method with a priori pivot and front sequence. OpenMP parallelization, nearly linear (in elimination and substitution) up to 40 threads. Constraints enforced at the local assembling stage. Findings - When compared with both standard sparse solvers and classical frontal implementations, memory requirements and code size are significantly reduced. Research limitations/implications - Large, non-linear problems with constraints typically make use of the Newton method with Lagrange multipliers. In the context of the solution of problems with large number of constraints, the matrix transformation methods (MTM) are often more cost-effective. The paper presents a complete solution, with topological ordering, for this problem. Practical implications - A complete software package in Fortran 2003 is described. Examples of clique-based problems are shown with large systems solved in core. Social implications - More realistic non-linear problems can be solved with this Frontal code at the core of the Newton method. Originality/value - Use of topological ordering of constraints. A-priori pivot and front sequences. No need for symbolic assembling. Constraints treated at the core of the Frontal solver. Use of OpenMP in the main Frontal loop, now quantified. Availability of Software.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação apresentada na Faculdade de Ciências e Tecnologia da Universidade Nova de Lisboa para obtenção do grau de Mestre em Engenharia Informática