932 resultados para País Vasco Historia 1936-1939 (Guerra civil) Refugiados
Resumo:
The International Brigades are typically viewed as a fighting force whose impetus came from the Comintern, and thus from within the walls of the Kremlin. If the assumption is essentially correct, the broader relation between Stalin’s USSR and the IB has received little attention. This chapter constitutes an empirically-based study of the Soviet role not only in the formation of the IB, but of the Red Army’s collaboration with IB units, and Moscow’s role in the climax and denouement of the brigadistas’ Spanish experience. This study’s principal conclusion is twofold: First, that the creation and sustenance of the IB was part of Stalin’s goal of linking the Loyalist cause with that of the Soviet Union and international communism, a component of a larger geo-strategic gamble which sought to create united opposition to the fascist menace, one which might eventually bring Moscow and the West into a closer alliance. The second conclusion is that the IB, like the broader projection of Soviet power and influence into the Spanish theater, was an overly ambitious operational failure whose abortive retreat is indicative of the basic weakness of the Stalinist regime in the years prior to the Second World War.
Resumo:
Tese de Doutoramento em Antropologia especialidade em Poder, Resistência e Movimentos Sociais
Resumo:
Dissertação apresentada para cumprimento dos requisitos necessários à obtenção do grau de Mestre em Ciência Política e Relações Internacionais, na área de especialização de Relações Internacionais
Resumo:
Sir Adam Beck ( a London, Ontario manufacturer, Mayor and Conservative member of the provincial legislature) was a champion of municipal and provincial power ownership. Beck become the “Power Minister” and chairman of the Hydro-Electric Power Commission of Ontario which was the world’s first publicly owned utility. In 1925 the first unit of the Hydro Electric Power Commission’s Queenston Chippawa hydro-electric development on the Niagara River went into service. The station was renamed in 1950 as “Sir Adam Beck #1”. This marked the 25th anniversary of Beck’s death. This is one of 2 generating stations in Niagara Falls. There is also Adam Beck Plant #2. The Niagara generating stations supply one quarter of all power used in New York State and Ontario.Ontario Hydro has two water tunnels which traverse the entire City of Niagara Falls from the Village of Chippawa in the South to the Sir Adam Beck Hydro Electric Generating Stations in the North. Also they are in the process of building the third tunnel. In addition, Ontario Hydro has a 13.6 km open canal which traverses the entire City of Niagara Falls. Source: http://www.hydroone.com/OurCompany/Pages/OurHistory.aspx
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL
Resumo:
UANL