974 resultados para Building plan


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fire safety has become an important part in structural design due to the ever increasing loss of properties and lives during fires. Conventionally the fire rating of load bearing wall systems made of Light gauge Steel Frames (LSF) is determined using fire tests based on the standard time-temperature curve given in ISO 834 (ISO, 1999). The standard time-temperature curve given in ISO 834 (ISO, 1999) originated from the application of wood burning furnaces in the early 1900s. However, modern commercial and residential buildings make use of thermoplastic materials, which mean considerably high fuel loads. Hence a detailed fire research study into the performance of LSF walls was undertaken using the developed real fire curves based on Eurocode parametric curves (ECS, 2002) and Barnett’s BFD curves (Barnett, 2002) using both full scale fire tests and numerical studies. It included LSF walls without any insulation, and the recently developed externally insulated composite panel system. This paper presents the details of the numerical studies and the results. It also includes brief details of the development of real building fire curves and experimental studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Abstract. Fire resistance has become an important part in structural design due to the ever increasing loss of properties and lives every year. Conventionally the fire rating of load bearing Light gauge Steel Frame (LSF) walls is determined using standard fire tests based on the time-temperature curve given in ISO 834 [1]. Full scale fire testing based on this standard time-temperature curve originated from the application of wood burning furnaces in the early 1900s and it is questionable whether it truly represents the fuel loads in modern buildings. Hence a detailed fire research study into the performance of LSF walls was undertaken using real design fires based on Eurocode parametric curves [2] and Barnett’s ‘BFD’ curves [3]. This paper presents the development of these real fire curves and the results of full scale experimental study into the structural and fire behaviour of load bearing LSF stud wall systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Teaching Teachers for the Future (TTF) project is a unique nationally significant project funded by the Australian Government through the Department of Employment, Education and Workplace Relations (DEEWR, Au$8.8 million) and the Information and Communication Technology Innovation Fund (ICTIF). This 2011-2012 project has ambitiously attempted to build the ICT education (ICTE) capacity of the next generation of Australian teachers through its focus on pre-service teachers, teacher educators and the new Australian Curriculum. This paper will provide an overview of the project including a description of its genesis in a changing educational and political landscape, its structure and operations, its grounding in contemporary theory, the research opportunities it has engendered and its tangible outcomes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The year 2010 was the wettest year on record for Queensland, Australia and the wettest year since 1974 for Southeast Queensland. The extremely heavy rain in early January 2011 fell on the catchments of heavily saturated Brisbane and Stanley Rivers systems resulting in significant runoff which rapidly produced a widespread and devastating flood event. The area of inundation was equivalent to the total land area of France and Germany combined. Over 200,000 people were affected leaving 35 people dead and 9 missing. The damage bill was estimated at over $1B and cost to the economy at over $10B with over 30,000 homes and 6,000 business flooded and 86 towns and regional centres affected. The need to disburse disaster funding in a prompt manner to the affected population was paramount to facilitate individuals getting their lives back to some normality. However, the payout of insurance claims has proved to be a major area of community anger. The ongoing impasse in payment of insurance compensation is attributed to the nature and number of claims, confusing definition of flooding and the lack or accuracy of information needed to determine individually the properties affected and legitimacy of claims. Information was not readily available at the micro-level including, extent and type of inundation, flood heights at property level and cause of damage. Events during the aftermath highlighted widespread community misconceptions concerning the technical factors associated with the flood event and the impact of such on access to legitimate compensation and assistance. Individual and community wide concerns and frustration, anger and depression, have arisen resulting from delays in the timely settlement of insurance claims. Lessons learnt during the aftermath are presented in the context of their importance as a basis for inculcating communities impacted by the flood event with resilience for the future.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sustainability issues in built environment have attracted an increasingly level of attention from both the general public and the industry. As a result, a number of green building assessment tools have been developed such as the Leadership in Energy and Environmental Design (LEED) and the BRE Environmental Assessment Method (BREEAM), etc. This paper critically reviewed the assessment tools developed in Australian context, i.e. the Green Star rating tools developed by the Green Building Council of Australia. A particular focus is given to the recent developments of these assessment tools. The results showed that the office buildings take the biggest share of Green Star rated buildings. Similarly, sustainable building assessments seem to be more performance oriented which focuses on the operation stage of buildings. In addition, stakeholder engagement during the decision making process is encouraged. These findings provide useful references to the development of next generation of sustainable building assessment tools.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

"The text is unique in the way it balances a "user" and "preparer" perspective and integrates real financial information to illustrate business decision choices and how decisions are made using accounting information. The pedagogical approach presented in the text has been tried and tested over many years, and provides a constructive framework for students to learn fundamental accounting concepts and processes. Through the use of real company information and financial statements students will quickly appreciate the use of accounting information. The textbook clearly outlines to students how to account for typical business transactions and prepare financial statements - such as a balance sheet, income statement, and statement of cash flows - that communicate the financing, operating, and investing activities of a business. Whether a student is required to study one accounting subject, as part of a wider business degree, or undertake a major study of accounting the text builds a strong conceptual understanding of accounting and will develop skills that can be applied to an accounting and business environment. The integral role of financial statements for decision making is also emphasised in this text and is reinforced throughout by the Decision Toolkit in each chapter. Students are provided with an extensive set of tools necessary to make business decisions based on financial information." -- publisher website

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper considers the conditions that are necessary at system and local levels for teacher assessment to be valid, reliable and rigorous. With sustainable assessment cultures as a goal, the paper examines how education systems can support local level efforts for quality learning and dependable teacher assessment. This is achieved through discussion of relevant research and consideration of a case study involving an evaluation of a cross-sectoral approach to promoting confidence in school-based assessment in Queensland, Australia. Building on the reported case study, essential characteristics for developing sustainable assessment cultures are presented, including: leadership in learning; alignment of curriculum, pedagogy and assessment; the design of quality assessment tasks and accompanying standards, and evidence-based judgement and moderation. Taken together, these elements constitute a new framework for building assessment capabilities and promoting quality assurance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Texas Department of Transportation (TxDOT) is concerned about the widening gap between pavement preservation needs and available funding. Thus, the TxDOT Austin District Pavement Engineer (DPE) has investigated methods to strategically allocate available pavement funding to potential projects that improve the overall performance of the District and Texas highway systems. The primary objective of the study presented in this paper is to develop a network-level project screening and ranking method that supports the Austin District 4-year pavement management plan development. The study developed candidate project selection and ranking algorithms that evaluated pavement conditions of each project candidate using data contained in the Pavement Management Information system (PMIS) database and incorporated insights from Austin District pavement experts; and implemented the developed method and supporting algorithm. This process previously required weeks to complete, but now requires about 10 minutes including data preparation and running the analysis algorithm, which enables the Austin DPE to devote more time and resources to conducting field visits, performing project-level evaluation and testing candidate projects. The case study results showed that the proposed method assisted the DPE in evaluating and prioritizing projects and allocating funds to the right projects at the right time.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Physical access control systems play a central role in the protection of critical infrastructures, where both the provision of timely access and preserving the security of sensitive areas are paramount. In this paper we discuss the shortcomings of existing approaches to the administration of physical access control in complex environments. At the heart of the problem is the current dependency on human administrators to reason about the implications of the provision or the revocation of staff access to an area within these facilities. We demonstrate how utilising Building Information Models (BIMs) and the capabilities they provide, including 3D representation of a facility and path-finding can reduce possible intentional or accidental errors made by security administrators.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Daring human nature has already led to the construction of high-rise buildings in naturally challenging geological regions and in worse environments of the world. However; literature review divulges that there is a lag in research of certain generic principles and rules for the prediction of lateral movement in multistorey construction. The present competitive trend orders the best possible used of available construction material and resources. Hence; the mixed used of reinforced concrete with structural steel is gaining prevalence day by day. This paper investigates the effects of Seismic load on composite multistorey building provided with core wall and trusses through FEM modelling. The results showed that increased rigidity corresponds to lower period of vibration and hence higher seismic forces. Since Seismic action is a function of mass and response acceleration, therefore; mass increment generate higher earthquake load and thus cause higher impact base shear and overturning movement. Whereas; wind force depends on building exposed, larger the plan dimension greater is the wind impact. Nonetheless; outriggers trusses noticeably contribute, in improving the serviceability of structure subjected to wind and earthquake forces.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes a capacity building process undertaken within the HIV/AIDS prevention project of the Adventist Development and Relief Agency (ADRA) in the Solomon Islands. ADRA HIV/AIDS has recently reoriented its project structure, moving beyond its awareness raising approach to incorporate health promotion frameworks, theories, strategies and assumptions. These have been used to inform project practice in project planning, delivery and evaluation. This paper shares what has worked and not worked in the capacity building process, including a project evaluation of the initial HIV/AIDS awareness raising project and the application of a number of capacity building strategies, including utilising a volunteer Australian Youth Ambassador for Development (AYAD) funded by the Australian Agency for International Development (AusAID). Existing and new projects are outlined. The underlying theme is that any capacity building exercise must include structural support (e.g. management, national frameworks) to ensure the incorporation of new initiatives and approaches. With time this enables ownership by counterparts and external partnerships to develop. The presence of an AYAD volunteer has been an effective strategy to achieve this. Reflections from the evaluators, the AYAD volunteer and the HIV/AIDS team are included.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Existing macro level research on the new venture creation process recognises the entrepreneur as a central agent in the process yet generally avoids, at each stage of the process, an examination of the micro level psychological behaviour of the individual entrepreneur. By integrating two theoretical approaches to entrepreneurship research, the psychology of the entrepreneur and the entrepreneurship process, this paper examines, using content analysis, the language used by new venture founders in documents directly linked to their capital raising activity. The study examined the language of 108 offer documents (information memorandum’s) which were divided between 54 new ventures that were successful in raising capital and 54 new ventures that either did not proceed further or were not successful in raising capital through the Australian Small Scale Offerings Board. Specifically, we were interested in examining the level of optimism evident in these narratives given that entrepreneurs have been previously described in the literature as being excessively optimistic.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper outlines a feasible scheme to extract deck trend when a rotary-wing unmanned aerial vehicle (RUAV)approaches an oscillating deck. An extended Kalman filter (EKF) is de- veloped to fuse measurements from multiple sensors for effective estimation of the unknown deck heave motion. Also, a recursive Prony Analysis (PA) procedure is proposed to implement online curve-fitting of the estimated heave mo- tion. The proposed PA constructs an appropriate model with parameters identified using the forgetting factor recursive least square (FFRLS)method. The deck trend is then extracted by separating dominant modes. Performance of the proposed procedure is evaluated using real ship motion data, and simulation results justify the suitability of the proposed method into safe landing of RUAVs operating in a maritime environment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With significant population growth experienced in South East Queensland over the past two decades and a high rate of growth expected to continue in coming decades, the Queensland Government is promoting urban consolidation planning policies to manage growth sustainably. Multi-residential buildings will play an important role in facilitating the increased densities which urban consolidation policies imply. However, a major flood event in January 2011 has brought to light the vulnerability of certain types of multi-residential typologies to power outages. The crisis conditions exposed how contemporary building design and construction practices, coupled with regulatory and planning issues, appear to have compromised the resilience and habitability of multi-storey residential buildings. In the greater urban area of Brisbane, Queensland, the debilitating dependence that certain types of apartment buildings have on mains electricity was highlighted by residents’ experiences of the Brisbane River flood disaster, before, during and after the event. This research examined high density residential buildings in West End, Brisbane, an inner city suburb which was severely affected by the flood and is earmarked for significant urban densification under the Brisbane City Plan. Medium-to-high-density residential buildings in the suburb were mapped in flooded and non-flooded locations and a database containing information about the buildings was created. Parameters included date of construction, number of storeys, systems of access and circulation, and potential for access to natural light and ventilation for habitable areas. A series of semi-structured interviews were conducted with residents involved in the owners’ management committees of several buildings to verify information the mapping could not provide. The interviews identified a number of critical systems failures due to power outage which had a significant impact on residents’ wellbeing, comfort and safety. Building services such as lifts, running water, fire alarms, security systems and air-conditioning ceased to operate when power was disconnected to neighbourhoods and buildings in anticipation of rising flood waters. Lack of access to buildings and dwellings, lack of safety, lack of building security, and lack of thermal comfort affected many residents whether or not their buildings were actually subjected to inundation, with some buildings rendered uninhabitable for a prolonged period. The extent of the impact on residents was dramatically influenced by the scale and type of building inhabited, with those dwelling in buildings under a 25m height limit, with a single lift, found to be most affected. The energy-dependency and strong trend of increasing power demands of high-rise buildings is well-documented. Extended electricity outages such as the one brought about by the 2011 flood in Queensland are likely to happen more frequently than the 50-year average of the flood event itself. Electricity blackouts can result from a number of man-made or natural causes, including shortages caused by demand exceeding supply. This paper highlights the vulnerability of energy-dependent buildings to power outages and investigates options for energy security for occupants of multi-storey buildings and makes recommendations to increase resilience and general liveability in multi-residential buildings in the subtropics through design modifications.