987 resultados para Australian publications


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of the project “Value Alignment Process for Project Delivery” is to provide a catalyst and tools for reform in the building and construction industry to transform business-as-usual performance into exceptional performance. The outcomes of this project will be beneficial to not only the construction industry, but to the community as a whole because a more sophisticated industry can deliver more effective use of assets, financing, operating and maintenance of facilities to suit the community’s needs. The research project consists of a study into best practice project delivery and the development of a suite of products, resources and services to guide project teams towards the best approach for a specific project. These resources will be focused on promoting the principles that underlie best practice project delivery, rather than on identifying a particular delivery system. The need for such tools and resources becomes more and more acute as the environment within which the construction industry operates becomes more and more complex, and as business and political imperatives shift to encompass or represent diverse stakeholder interests. To this end, this literature review looks at why it is essential to achieve transformation in the Australian construction industry in the context of its importance to the Australian economy. It seeks to investigate the concepts of ‘alignment’ and value’ as they pertain to construction industry processes and relationships. It comprehensively reviews drivers of project excellence and best practice project delivery principles and looks at how clients approach selection of project delivery systems. It critiques existing project delivery strategies and gives an overview of recent best practice initiatives. The literature review represents a milestone against the Project Agreement and forms a foundation document for this research project

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Off-site Manufacture (OSM) has long been recognised, both in Australia and internationally, as offering numerous benefits to all parties in the construction process. More importantly, it is recognised as a key vehicle for driving improvement within the construction industry. The uptake of OSM in construction is however limited, despite well documented benefits. The research aims to determine the ‘state-of-the-art’ of OSM in Australia. It confirms the benefits and identifies the real and perceived barriers to the widespread adoption of OSM. Further the project identifies opportunities for future investment and research. Although numerous reports have been produced in the UK on the state of OSM adoption within that region, no prominent studies exist for the Australian context. This scoping study is an essential component upon which to build any initiatives that can take advantage of the benefits of OSM in construction. The Construction 2020 report predicted that OSM is set to increase in use over the next 5-15 years, further justifying the need for such a study. The long-term goal of this study is to contribute to the improvement of the Australian construction industry through a realisation of the potential benefits of OSM.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Sydney Opera House Facilities Management Exemplar Project (SOH FM Exemplar Project) aims to develop innovative research on facility management (FM) with the focus on asset maintenance. The project utilises the Sydney Opera House (SOH), one of most unique buildings in Australia, to research and create innovative FM strategies and models that will have a direct beneficial role for the Australian facilities management industry as well as the economy as a whole. The procurement, benchmarking and digitisation are crucial in improving the performance of FM. The procurement develops strategic plan and deployment framework enabling products, services, etc. meet objectives of performance, economic, environment, etc. Benchmarking is a technology used to compare practice and assess performance against the competitors recognised as industry leaders who achieve most successful activities in the field. Digitisation develops digitized FM modelling that facilitates the integration and automation of facility management. The project carries out the research on all the three areas as well as the relationship between them. It aims to develop an integrated approach for the improvement of FM performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

From an initial sample of 747 primary school students, the top 16 percent (n =116) with high self-esteem (HSE) and the bottom 15 percent (n = I1 I) with low selfesteem (LSE) were se/eeted. These two groups were then compared on personal and classroom variables. Significant differences were found for all personal (self-talk, selfconcepts) and classroom (teacher feedback, praise, teacher-student relationship, and classroom environment) variables. Students with HSE scored more highly on all variables. Discriminant Function Analysis (DFA) was then used to determine which variables discriminated between these two groups of students. Learner self-concept, positive and negative self-talk, classroom environment, and effort feedback were the best discriminators of students with high and low self-esteem. Implications for educational psychologists and teachers are discussed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The determination of the most appropriate procurement method for capital works projects is a challenging task for the Department of Housing and Works (DHW) and other Western Australian State Government Agencies because of the array of assessment criteria that are considered and the procurement methods that are available. A number of different procurement systems can be used to deliver capital works projects such a traditional, design and construct and management. Sub-classifications of these systems have proliferated and continue to emerge in response to market demands. The selection of an inappropriate procurement method may lead to undesirable project outcomes. To facilitate DHW in selecting an appropriate procurement method for its capital works projects, a six step procurement method selection process is presented. The characteristics of the most common forms of procurement method used in Australia are presented. Case studies where procurement methods have been used for specific types of capital works in Western Australia are offered to provide a reference point and learning opportunity for procurement method selection.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Cooperative Research Centre for Construction Innovation (CRC CI) is a national research, development and implementation centre focused on the needs of the property, design, construction and facility management sectors. Established in 2001 and headquartered at Queensland University of Technology as an unincorporated joint venture under the Australian Government's Cooperative Research Program, the CRC CI is developing key technologies, tools and management systems to improve the effectiveness of the construction industry. The CRC CI is a seven year project funded by a Commonwealth grant and industry, research and other government support. More than 150 researchers and an alliance of 19 leading partner organisations are involved in and support the activities of the CRC CI

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Cooperative Research Centre (CRC) for Construction Innovation research project 2001-008-C: ‘Project Team Integration: Communication, Coordination and Decision Support’, is supported by a number of Australian industry, government and university based project partners including: Queensland University of Technology (QUT); Commonwealth Scientific Industrial Research Organisation (CSIRO), University of Newcastle; Queensland Department of Public Works (QDPW); and the Queensland Department of Main Roads (QDMR). Supporting the various research aims and objectives of the 2001-008-C (Part B) QUT / Industry Partner agreements, and as a major deliverable for the project, this report is not intended as a comprehensive statement of Architectural, Engineering and Contractor (AEC) industry best practice recommendations. Rather it should read as a set of research and industry recommended guidelines, based on extensive literature reviews and two years worth of investigative activities examining both public and private industry uptake of innovative information and communication technology (ICT) solutions, whilst highlighting the overall need for culture change.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction industry is categorised as being an information-intensive industry and described as one of the most important industries in any developed country, facing a period of rapid and unparalleled change (Industry Science Resources 1999) (Love P.E.D., Tucker S.N. et al. 1996). Project communications are becoming increasingly complex, with a growing need and fundamental drive to collaborate electronically at project level and beyond (Olesen K. and Myers M.D. 1999; Thorpe T. and Mead S. 2001; CITE 2003). Yet, the industry is also identified as having a considerable lack of knowledge and awareness about innovative information and communication technology (ICT) and web-based communication processes, systems and solutions which may prove beneficial in the procurement, delivery and life cycle of projects (NSW Government 1998; Kajewski S. and Weippert A. 2000). The Internet has debatably revolutionised the way in which information is stored, exchanged and viewed, opening new avenues for business, which only a decade ago were deemed almost inconceivable (DCITA 1998; IIB 2002). In an attempt to put these ‘new avenues of business’ into perspective, this report provides an overall ‘snapshot’ of current public and private construction industry sector opportunities and practices in the implementation and application of web-based ICT tools, systems and processes (e-Uptake). Research found that even with a reserved uptake, the construction industry and its participating organisations are making concerted efforts (fortunately with positive results) in taking up innovative forms of doing business via the internet, including e-Tendering (making it possible to manage the entire tender letting process electronically and online) (Anumba C.J. and Ruikar K. 2002; ITCBP 2003). Furthermore, Government (often a key client within the construction industry),and with its increased tendency to transact its business electronically, undoubtedly has an effect on how various private industry consultants, contractors, suppliers, etc. do business (Murray M. 2003) – by offering a wide range of (current and anticipated) e-facilities / services, including e-Tendering (Ecommerce 2002). Overall, doing business electronically is found to have a profound impact on the way today’s construction businesses operate - streamlining existing processes, with the growth in innovative tools, such as e-Tender, offering the construction industry new responsibilities and opportunities for all parties involved (ITCBP 2003). It is therefore important that these opportunities should be accessible to as many construction industry businesses as possible (The Construction Confederation 2001). Historically, there is a considerable exchange of information between various parties during a tendering process, where accuracy and efficiency of documentation is critical. Traditionally this process is either paper-based (involving large volumes of supporting tender documentation), or via a number of stand-alone, non-compatible computer systems, usually costly to both the client and contractor. As such, having a standard electronic exchange format that allows all parties involved in an electronic tender process to access one system only via the Internet, saves both time and money, eliminates transcription errors and increases speed of bid analysis (The Construction Confederation 2001). Supporting this research project’s aims and objectives, researchers set to determine today’s construction industry ‘current state-of-play’ in relation to e-Tendering opportunities. The report also provides brief introductions to several Australian and International e-Tender systems identified during this investigation. e-Tendering, in its simplest form, is described as the electronic publishing, communicating, accessing, receiving and submitting of all tender related information and documentation via the internet, thereby replacing the traditional paper-based tender processes, and achieving a more efficient and effective business process for all parties involved (NT Governement 2000; NT Government 2000; NSW Department of Commerce 2003; NSW Government 2003). Although most of the e-Tender websites investigated at the time, maintain their tendering processes and capabilities are ‘electronic’, research shows these ‘eTendering’ systems vary from being reasonably advanced to more ‘basic’ electronic tender notification and archiving services for various industry sectors. Research also indicates an e-Tender system should have a number of basic features and capabilities, including: • All tender documentation to be distributed via a secure web-based tender system – thereby avoiding the need for collating paperwork and couriers. • The client/purchaser should be able to upload a notice and/or invitation to tender onto the system. • Notification is sent out electronically (usually via email) for suppliers to download the information and return their responses electronically (online). • During the tender period, updates and queries are exchanged through the same e-Tender system. • The client/purchaser should only be able to access the tenders after the deadline has passed. • All tender related information is held in a central database, which should be easily searchable and fully audited, with all activities recorded. • It is essential that tender documents are not read or submitted by unauthorised parties. • Users of the e-Tender system are to be properly identified and registered via controlled access. In simple terms, security has to be as good as if not better than a manual tender process. Data is to be encrypted and users authenticated by means such as digital signatures, electronic certificates or smartcards. • All parties must be assured that no 'undetected' alterations can be made to any tender. • The tenderer should be able to amend the bid right up to the deadline – whilst the client/purchaser cannot obtain access until the submission deadline has passed. • The e-Tender system may also include features such as a database of service providers with spreadsheet-based pricing schedules, which can make it easier for a potential tenderer to electronically prepare and analyse a tender. Research indicates the efficiency of an e-Tender process is well supported internationally, with a significant number, yet similar, e-Tender benefits identified during this investigation. Both construction industry and Government participants generally agree that the implementation of an automated e-Tendering process or system enhances the overall quality, timeliness and cost-effectiveness of a tender process, and provides a more streamlined method of receiving, managing, and submitting tender documents than the traditional paper-based process. On the other hand, whilst there are undoubtedly many more barriers challenging the successful implementation and adoption of an e-Tendering system or process, researchers have also identified a range of challenges and perceptions that seem to hinder the uptake of this innovative approach to tendering electronically. A central concern seems to be that of security - when industry organisations have to use the Internet for electronic information transfer. As a result, when it comes to e-Tendering, industry participants insist these innovative tendering systems are developed to ensure the utmost security and integrity. Finally, if Australian organisations continue to explore the competitive ‘dynamics’ of the construction industry, without realising the current and future, trends and benefits of adopting innovative processes, such as e-Tendering, it will limit their globalising opportunities to expand into overseas markets and allow the continuation of international firms successfully entering local markets. As such, researchers believe increased knowledge, awareness and successful implementation of innovative systems and processes raises great expectations regarding their contribution towards ‘stimulating’ the globalisation of electronic procurement activities, and improving overall business and project performances throughout the construction industry sectors and overall marketplace (NSW Government 2002; Harty C. 2003; Murray M. 2003; Pietroforte R. 2003). Achieving the successful integration of an innovative e-Tender solution with an existing / traditional process can be a complex, and if not done correctly, could lead to failure (Bourn J. 2002).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document provides the findings of a national review of investment decision-making practices in road asset management. Efforts were concentrated on identifying the strategic objectives of agencies in road asset management, establishing and understanding criteria different organisations adopted and ascertaining the exact methodologies used by different sate road authorities. The investment objectives of Australian road authorities are based on triple-bottom line considerations (social, environmental, economic and political). In some cases, comparing with some social considerations, such as regional economic development, equity, and access to pubic service etc., Benefit-Cost Ratio has limited influence on the decision-making. Australian road authorities have developed various decision support tools. Although Multi-Criteria Analysis has been preliminarily used in case by case study, pavement management systems, which are primarily based on Benefit Cost Analysis, are still the main decision support tool. This situation is not compatible with the triple-bottom line objectives. There is need to fill the gap between decision support tools and decision-making itself. Different decision criteria should be adopted based on the contents of the work. Additional decision criteria, which are able to address social, environmental and political impacts, are needed to develop or identify. Environmental issue plays a more and more important role in decision-making. However, the criteria and respective weights in decision-making process are yet to be clearly identified. Social and political impacts resulted from road infrastructure investment can be identified through Community Perceptions Survey. With accumulative data, prediction models, which are similar as pavement performance models, can be established. Using these models, the decision-makers are able to foresee the social and political consequences of investment alternatives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report is the culmination of a two-stage research project to inform the Australian property and construction industry generally, in addition to providing the Australian Building Codes Board (ABCB) with information to allow it to determine whether or not sustainability requirements are necessary in the Future Building Code of Australia (BCA21). The Australian Building Codes Board is a joint initiative of all levels of government in Australia. The Board’s mission is to provide for efficiency and cost effectiveness in meeting community expectations for health, safety and amenity in the design, construction and use of buildings through the creation of nationally consistent building codes, standards, regulatory requirements and regulatory systems. The Stage 1 (literature review) and Stage 2 (workshops) reports are intended to be read in conjunction with one another. These reports and the Database are provided as appendices. The Conclusions of this, the final report, are the result of the overall program of work.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A worldwide interest is being generated in the use of fibre reinforced polymer composites (FRP) in rehabilitation of reinforced concrete structures. As a replacement for the traditional steel plates or external post-tensioning in strengthening applications, various types of FRP plates, with their high strength to weight ratio and good resistance to corrosion, represent a class of ideal material in external retrofitting. Within the last ten years, many design guidelines have been published to provide guidance for the selection, design and installation of FRP systems for external strengthening of concrete structures. Use of these guidelines requires understanding of a number of issues pertaining to different properties and structural failure modes specific to these materials. A research initiative funded by the CRC for Construction Innovation was undertaken (primarily at RMIT) to develop a decision support tool and a user friendly guide for use of fibre reinforced polymer composites in rehabilitation of concrete structures. The user guidelines presented in this report were developed after industry consultation and a comprehensive review of the state of the art technology. The scope of the guide was mainly developed based on outcomes of two workshops with Queensland Department of Main Roads (QDMR). The document covers material properties, recommended construction requirements, design philosophy, flexural, shear and torsional strengthening of beams and strengthening of columns. In developing this document, the guidelines published on FIB Bulletin 14 (2002), Task group 9.3, International Federation of Structural Concrete (FIB) and American Concrete Institute Committee 440 report (2002) were consulted in conjunction with provisions of the Austroads Bridge design code (1992) and Australian Concrete Structures code AS3600 (2002). In conclusion, the user guide presents design examples covering typical strengthening scenarios.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project aims to assess the extent of economic sustainability of working in international markets by Australian construction design-related firms. This investigation also identified barriers and success factors firms experience, which ultimately increases or reduces their exposure to financial risk. This study explored new research territory by developing a detailed understanding of the way three successful firms have maintained their longevity in various international markets. The firms are not considered to be large firms by international standards. The manner in which the firms achieve long term sustainability, deal with problems and barriers in international markets and develop successful strategies rely upon being adaptable to different markets and changes within markets. A model was developed based upon a critical analysis of the literature. An adaptive performance framework for sustainability was developed which had three key areas; internationalisation process, market knowledge and design management. The sustainable business model is underpinned by the management of non-economic factors, which include social, cultural and intellectual capital. The ultimate aim of any firm and the ultimate indicator of success is financial capital. Firms typically develop their own highly sophisticated financial measures themselves however have only an implicit understanding of other softer and less tangible factors that impact upon sustainability. Adaptive performance is the firm’s continual adaptivity of business practices to respond to and thereby achieve client satisfaction by a combination of self, market and project needs assessment.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project aims to assess the extent of economic sustainability of working in international markets by Australian construction design-related firms. This investigation also identified barriers and success factors firms experience, which ultimately increases or reduces their exposure to financial risk. This study explored new research territory by developing a detailed understanding of the way three successful firms have maintained their longevity in various international markets. The firms are not considered to be large firms by international standards. The manner in which the firms achieve long term sustainability, deal with problems and barriers in international markets and develop successful strategies rely upon being adaptable to different markets and changes within markets. A model was developed based upon a critical analysis of the literature. An adaptive performance framework for sustainability was developed which had three key areas; internationalisation process, market knowledge and design management. The sustainable business model is underpinned by the management of non-economic factors, which include social, cultural and intellectual capital. The ultimate aim of any firm and the ultimate indicator of success is financial capital. Firms typically develop their own highly sophisticated financial measures themselves however have only an implicit understanding of other softer and less tangible factors that impact upon sustainability. Adaptive performance is the firm’s continual adaptivity of business practices to respond to and thereby achieve client satisfaction by a combination of self, market and project needs assessment.