930 resultados para topological complexity
Resumo:
Both stimulus and response conflict can disrupt behavior by slowing response times and decreasing accuracy. Although several neural activations have been associated with conflict processing, it is unclear how specific any of these are to the type of stimulus conflict or the amount of response conflict. Here, we recorded electrical brain activity, while manipulating the type of stimulus conflict in the task (spatial [Flanker] versus semantic [Stroop]) and the amount of response conflict (two versus four response choices). Behaviorally, responses were slower to incongruent versus congruent stimuli across all task and response types, along with overall slowing for higher response-mapping complexity. The earliest incongruency-related neural effect was a short-duration frontally-distributed negativity at ~200 ms that was only present in the Flanker spatial-conflict task. At longer latencies, the classic fronto-central incongruency-related negativity 'N(inc)' was observed for all conditions, but was larger and ~100 ms longer in duration with more response options. Further, the onset of the motor-related lateralized readiness potential (LRP) was earlier for the two vs. four response sets, indicating that smaller response sets enabled faster motor-response preparation. The late positive complex (LPC) was present in all conditions except the two-response Stroop task, suggesting this late conflict-related activity is not specifically related to task type or response-mapping complexity. Importantly, across tasks and conditions, the LRP onset at or before the conflict-related N(inc), indicating that motor preparation is a rapid, automatic process that interacts with the conflict-detection processes after it has begun. Together, these data highlight how different conflict-related processes operate in parallel and depend on both the cognitive demands of the task and the number of response options.
Resumo:
We survey recent results on the computational complexity of mixed shop scheduling problems. In a mixed shop, some jobs have fixed machine orders (as in the job shop), while the operations of the other jobs may be processed in arbitrary order (as in the open shop). The main attention is devoted to establishing the boundary between polynomially solvable and NP-hard problems. When the number of operations per job is unlimited, we focus on problems with a fixed number of jobs.
Resumo:
Potential explanatory variables often co-vary in studies of species richness. Where topography varies within a survey it is difficult to separate area and habitat-diversity effects. Topographically complex surfaces may contain more species due to increased habitat diversity or as a result of increased area per se. Fractal geometry can be used to adjust species richness estimates to control for increases in area on complex surfaces. Application of fractal techniques to a survey of rocky shores demonstrated an unambiguous area-independent effect of topography on species richness in the Isle of Man. In contrast, variation in species richness in south-west England reflected surface availability alone. Multivariate tests and variation in limpet abundances also demonstrated regional variation in the area-independent effects of topography. Community composition did not vary with increasing surface complexity in south-west England. These results suggest large-scale gradients in the effects of heterogeneity on community processes or demography.
Resumo:
Purpose The aim of this paper is to explore the issues involved in developing and applying performance management approaches within a large UK public sector department using a multiple stakeholder perspective and an accompanying theoretical framework. Design/methodology/approach An initial short questionnaire was used to determine perceptions about the implementation and effectiveness of the new performance management system across the organisation. In total, 700 questionnaires were distributed. Running concurrently with an ethnographic approach, and informed by the questionnaire responses, was a series of semi-structured interviews and focus groups. Findings Staff at all levels had an understanding of the new system and perceived it as being beneficial. However, there were concerns that the approach was not continuously managed throughout the year and was in danger of becoming an annual event, rather than an ongoing process. Furthermore, the change process seemed to have advanced without corresponding changes to appraisal and reward and recognition systems. Thus, the business objectives were not aligned with motivating factors within the organisation. Research limitations/implications Additional research to test the validity and usefulness of the theoretical model, as discussed in this paper, would be beneficial. Practical implications The strategic integration of the stakeholder performance measures and scorecards was found to be essential to producing an overall stakeholder-driven strategy within the case study organisation. Originality/value This paper discusses in detail the approach adopted and the progress made by one large UK public sector organisation, as it attempts to develop better relationships with all of its stakeholders and hence improve its performance. This paper provides a concerted attempt to link theory with practice.
Interpreting spatial complexity of decay features on a sandstone wall: St. Matthew’s Church, Belfast