945 resultados para Integrated operation and maintenance
Resumo:
Part 4: Transition Towards Product-Service Systems
Resumo:
Protective relaying comprehends several procedures and techniques focused on maintaining the power system working safely during and after undesired and abnormal network conditions, mostly caused by faulty events. Overcurrent relay is one of the oldest protective relays, its operation principle is straightforward: when the measured current is greater than a specified magnitude the protection trips; less variables are required from the system in comparison with other protections, causing the overcurrent relay to be the simplest and also the most difficult protection to coordinate; its simplicity is reflected in low implementation, operation, and maintenance cost. The counterpart consists in the increased tripping times offered by this kind of relays mostly before faults located far from their location; this problem can be particularly accentuated when standardized inverse-time curves are used or when only maximum faults are considered to carry out relay coordination. These limitations have caused overcurrent relay to be slowly relegated and replaced by more sophisticated protection principles, it is still widely applied in subtransmission, distribution, and industrial systems. In this work, the use of non standardized inverse-time curves, the model and implementation of optimization algorithms capable to carry out the coordination process, the use of different levels of short circuit currents, and the inclusion of distance relays to replace insensitive overcurrent ones are proposed methodologies focused on the overcurrent relay performance improvement. These techniques may transform the typical overcurrent relay into a more sophisticated one without changing its fundamental principles and advantages. Consequently a more secure and still economical alternative can be obtained, increasing its implementation area
Resumo:
Efficient and reliable techniques for power delivery and utilization are needed to account for the increased penetration of renewable energy sources in electric power systems. Such methods are also required for current and future demands of plug-in electric vehicles and high-power electronic loads. Distributed control and optimal power network architectures will lead to viable solutions to the energy management issue with high level of reliability and security. This dissertation is aimed at developing and verifying new techniques for distributed control by deploying DC microgrids, involving distributed renewable generation and energy storage, through the operating AC power system. To achieve the findings of this dissertation, an energy system architecture was developed involving AC and DC networks, both with distributed generations and demands. The various components of the DC microgrid were designed and built including DC-DC converters, voltage source inverters (VSI) and AC-DC rectifiers featuring novel designs developed by the candidate. New control techniques were developed and implemented to maximize the operating range of the power conditioning units used for integrating renewable energy into the DC bus. The control and operation of the DC microgrids in the hybrid AC/DC system involve intelligent energy management. Real-time energy management algorithms were developed and experimentally verified. These algorithms are based on intelligent decision-making elements along with an optimization process. This was aimed at enhancing the overall performance of the power system and mitigating the effect of heavy non-linear loads with variable intensity and duration. The developed algorithms were also used for managing the charging/discharging process of plug-in electric vehicle emulators. The protection of the proposed hybrid AC/DC power system was studied. Fault analysis and protection scheme and coordination, in addition to ideas on how to retrofit currently available protection concepts and devices for AC systems in a DC network, were presented. A study was also conducted on the effect of changing the distribution architecture and distributing the storage assets on the various zones of the network on the system’s dynamic security and stability. A practical shipboard power system was studied as an example of a hybrid AC/DC power system involving pulsed loads. Generally, the proposed hybrid AC/DC power system, besides most of the ideas, controls and algorithms presented in this dissertation, were experimentally verified at the Smart Grid Testbed, Energy Systems Research Laboratory. All the developments in this dissertation were experimentally verified at the Smart Grid Testbed.
Resumo:
Two key solutions to reduce the greenhouse gas emissions and increase the overall energy efficiency are to maximize the utilization of renewable energy resources (RERs) to generate energy for load consumption and to shift to low or zero emission plug-in electric vehicles (PEVs) for transportation. The present U.S. aging and overburdened power grid infrastructure is under a tremendous pressure to handle the issues involved in penetration of RERS and PEVs. The future power grid should be designed with for the effective utilization of distributed RERs and distributed generations to intelligently respond to varying customer demand including PEVs with high level of security, stability and reliability. This dissertation develops and verifies such a hybrid AC-DC power system. The system will operate in a distributed manner incorporating multiple components in both AC and DC styles and work in both grid-connected and islanding modes. ^ The verification was performed on a laboratory-based hybrid AC-DC power system testbed as hardware/software platform. In this system, RERs emulators together with their maximum power point tracking technology and power electronics converters were designed to test different energy harvesting algorithms. The Energy storage devices including lithium-ion batteries and ultra-capacitors were used to optimize the performance of the hybrid power system. A lithium-ion battery smart energy management system with thermal and state of charge self-balancing was proposed to protect the energy storage system. A grid connected DC PEVs parking garage emulator, with five lithium-ion batteries was also designed with the smart charging functions that can emulate the future vehicle-to-grid (V2G), vehicle-to-vehicle (V2V) and vehicle-to-house (V2H) services. This includes grid voltage and frequency regulations, spinning reserves, micro grid islanding detection and energy resource support. ^ The results show successful integration of the developed techniques for control and energy management of future hybrid AC-DC power systems with high penetration of RERs and PEVs.^
Resumo:
n decentralised rural electrification through solar home systems, private companies and promoting institutions are faced with the problem of deploying maintenance structures to operate and guarantee the service of the solar systems for long periods (ten years or more). The problems linked to decentralisation, such as the dispersion of dwellings, difficult access and maintenance needs, makes it an arduous task. This paper proposes an innovative design tool created ad hoc for photovoltaic rural electrification based on a real photovoltaic rural electrification program in Morocco as a special case study. The tool is developed from a mathematical model comprising a set of decision variables (location, transport, etc.) that must meet certain constraints and whose optimisation criterion is the minimum cost of the operation and maintenance activity assuming an established quality of service. The main output of the model is the overall cost of the maintenance structure. The best location for the local maintenance headquarters and warehouses in a given region is established, as are the number of maintenance technicians and vehicles required.
Resumo:
The application of sand filters in localized irrigation systems is recommended in the presence of organic and algae contamination. The proper design and maintenance of these equipments are essential to assure an effective water quality control, in order to reduce the emitters clogging, to keep its water application uniformity, and to prevent increasing in the system operation costs. Despite the existence of some references about design, operation and maintenance of these filters, they are dispersed, with not enough details to guarantee the optimization of its hydraulics structure design and the proper selection of porous media to be used. Therefore, the objective of this work was to report a current literature review, relating practical information with scientific knowledge. The content of this review would help to induce and intensify the research on this subject and to contribute so the operational functions for the equipment are reached. It is also expected to assist the improvement of the filtration and flushing processes in the agricultural irrigation and the development of original design procedures and the rational use of these devices.
Resumo:
The development of renewable energy sources and Distributed Generation (DG) of electricity is of main importance in the way towards a sustainable development. However, the management, in large scale, of these technologies is complicated because of the intermittency of primary resources (wind, sunshine, etc.) and small scale of some plants. The aggregation of DG plants gives place to a new concept: the Virtual Power Producer (VPP). VPPs can reinforce the importance of these generation technologies making them valuable in electricity markets. VPPs can ensure a secure, environmentally friendly generation and optimal management of heat, electricity and cold as well as optimal operation and maintenance of electrical equipment, including the sale of electricity in the energy market. For attaining these goals, there are important issues to deal with, such as reserve management strategies, strategies for bids formulation, the producers’ remuneration, and the producers’ characterization for coalition formation. This chapter presents the most important concepts related with renewable-based generation integration in electricity markets, using VPP paradigm. The presented case studies make use of two main computer applications:ViProd and MASCEM. ViProd simulates VPP operation, including the management of plants in operation. MASCEM is a multi-agent based electricity market simulator that supports the inclusion of VPPs in the players set.
Resumo:
Dissertação de Mestrado, Engenharia e Gestão de Sistemas de Água, 4 de Março de 2016, Universidade dos Açores.
Resumo:
A indústria da construção, nomeadamente no sector da edificação, baseia-se essencialmente em métodos de construção tradicional. Esta indústria é caracterizada pelo consumo excessivo de matérias-primas, de recursos energéticos não renováveis e pela elevada produção de resíduos. Esta realidade é de todo incompatível com os desígnios do desenvolvimento sustentável, nos quais se procura a conveniência harmoniosa entre as dimensões ambiental, social e económica. O desafio da sustentabilidade, colocado à actividade da construção, tem motivado abordagens distintas, não só por parte das várias especialidades da engenharia, como também da arquitectura. É nesta perspectiva, que o presente modelo pretende ser um contributo para uma abordagem inovadora, introduzindo linhas de intervenção e de orientação, para apoiar e estimular o desenvolvimento de soluções sustentáveis em edifícios habitacionais, em qualquer fase do ciclo de evolução de um projecto e das várias especialidades do mesmo. Assim, no sentido de optimizar os recursos envolvidos no projecto são expostas estratégias de intervenção, com os seguintes objectivos: optimização do potencial do local, preservação da identidade regional e cultural, minimização do consumo de energia, utilização de materiais e produtos de baixo impacto ambiental, redução do consumo de água, redução da produção de emissões, resíduos e outros poluentes, adequada qualidade do ambiente interior e optimização das fases de operação e manutenção. A ferramenta apresentada surge como um instrumento facilitador para a equipa de projectistas, e que se esta adaptada para o desenvolvimento de projectos de edifícios de habitação, dada a génese dos métodos utilizados. As soluções de sustentabilidade apresentadas neste manual emanam dos sistemas de certificação LíderA, LEED, BREEAM e SBToolpt. O modelo encontra-se estruturado, no que às fases de projecto diz respeito, de acordo com os requisitos expressos na Portaria 701-H/2008 de 29 de Julho, tendo sido igualmente seguido o descrito para os respectivos intervenientes.
Resumo:
Wind energy is considered a hope in future as a clean and sustainable energy, as can be seen by the growing number of wind farms installed all over the world. With the huge proliferation of wind farms, as an alternative to the traditional fossil power generation, the economic issues dictate the necessity of monitoring systems to optimize the availability and profits. The relatively high cost of operation and maintenance associated to wind power is a major issue. Wind turbines are most of the time located in remote areas or offshore and these factors increase the referred operation and maintenance costs. Good maintenance strategies are needed to increase the health management of wind turbines. The objective of this paper is to show the application of neural networks to analyze all the wind turbine information to identify possible future failures, based on previous information of the turbine.
Resumo:
O crescente aumento da consciencialização da importância da fase de operação e manutenção, bem como a amplificação que a metodologia Building Information Modelling (BIM) tem obtido nos últimos anos, sugere uma necessidade de alterar a atual abordagem da gestão das instalações de forma a dotá-la das mais recentes inovações tecnológicas como seja a utilização do BIM. Os Building Information Models apresentam as características ideais para a integração da gestão das instalações, não só pela visualização do edifício, mas sobretudo pela potencialidade que a base de dados oferece, com informação referente a cada um dos componentes presentes e suas relações. O âmbito deste trabalho envolve assim a integração da gestão das instalações com o modelo BIM criado, representativo do edifício em estudo. Este trabalho começa com as definições do âmbito e dos objetivos que são propostos no Capítulo 1. No Capítulo 2, é elaborada uma pesquisa sobre o estado da arte atual de cada uma das metodologias BIM e FM, de forma a tomar conhecimento dos seus conceitos principais. Foi feito também um levantamento no campo do BIM-FM de forma a apurar as atuais soluções tecnológicas existentes, a forma como é feita a sua troca de informação e também alguns casos em que esta metodologia foi aplicada. Com base na informação recolhida sobre as metodologias e também nos casos práticos estudados, é realizado no Capítulo 3, capítulo central deste trabalho, a aplicação prática. A realização desta aplicação é dividida por 3 fases principais. Numa primeira fase é especificada e recolhida a informação necessária de ser obtida para a realização do modelo e a posterior aplicação do FM. A escolha da informação a recolher é feita ponderando todos os fatores existentes, mas de forma a cumprir os requisitos pedidos. Numa segunda fase, assente na compilação de informação recolhida anteriormente, realiza-se o modelo do edifício. A modelação, de forma a seguir o método de trabalho BIM é realizada por especialidades, sendo numa primeira fase realizada a especialidade de arquitetura e posteriormente, utilizando esse modelo como base, é feita a modelação das especialidades de águas, águas residuais, AVAC e eletricidade. Esta escolha foi também estimulada pela organização do software utilizado para a modelação, por módulos. Na última fase da aplicação do caso prático a informação inserida na fase de modelação do edifício é exportada para o software de FM, neste caso em específico, o IBM Maximo. Para a exportação destes dados foi utilizado o formato Construction Operations Building Information Exchange (COBie), de forma a garantir a integridade e conformidade da informação transferida. No Capítulo 4 deste trabalho são abordadas as especificidades relativas à informação existente, à modelação e à troca de dados entre o software de modelação e o software utilizado na gestão do edifício. São também sugeridos alguns temas para futuros desenvolvimentos com o intuito de ampliação dos campos de FM com o uso do modelo. O BIM-FM é um tema emergente na atualidade do BIM, sendo a sua utilização encarada como uma mais-valia ao processo BIM. A compilação da informação durante a fase de projeto e execução, aliada à existência do modelo torna a implementação do FM com o modelo BIM como uma sequência natural.
Resumo:
Ao longo dos últimos anos tem-se assistido a um forte desenvolvimento e crescimento do número de parques eólicos instalados no mundo, o que leva a que seja necessário o incremento de ferramentas que permitam aperfeiçoar os sistemas de monitorização e controlo atualmente existentes. Por outro lado, não se deve deixar de ter em conta os custos elevados de operação e manutenção dos sistemas eólicos bem como o facto de os aerogeradores estarem localizadas em locais remotos ou offshore, o que faz aumentar os custos associados à sua exploração. A dissertação nasce da intenção clara do mercado em apostar na supervisão e previsão de avarias graves, de forma a minimizar os encargos subjacentes. Este trabalho de dissertação visa a utilização de redes neuronais para criar uma ferramenta informática de previsão de avarias em caixas de engrenagens em aerogeradores. As redes neuronais são ferramentas informáticas ideais para trabalhar com muita informação, sendo que a sua aplicação depende da qualidade e quantidade dos dados. Para tal irá ser efetuado um estudo em um parque eólico, no qual se analisará as principais avarias detetadas bem como as grandezas que deverão integrar a construção desta rede neuronal. Assim sendo, a informação relativa às diversas máquinas existentes num parque, é de enorme importância para a definição e otimização da rede neuronal a construir. Os resultados obtidos neste trabalho com a aplicação de redes neuronais para a previsão de avarias em caixas de engrenagens do parque eólico de estudo, provam que é possível realizar uma deteção da avaria bem como uma constatação de que a reparação possa ter sido bem efetuada ou mal sucedida, podendo assim ser ajustados os programas de manutenção a efetuar e uma verificação das ações de reparação para sua validação.
Resumo:
A crescente expansão urbana e o incremento das exigências ambientais e financeiras promovem a implementação de abordagens sustentáveis para a gestão das infraestruturas sanitárias. Assim, o recurso a instrumentos de monitorização e à modelação matemática surge como o caminho para a racionalização do investimento e a otimização dos sistemas existentes. Neste contexto, a modelação dinâmica de sistemas de drenagem urbana assume relevância para o controlo e redução dos caudais em excesso e das descargas de poluentes nos meios recetores, resultantes de um incremento significativo de afluências pluviais indevidas, de problemas de sub-dimensionamento ou falta de operação e manutenção. O objetivo da presente dissertação consiste na modelação, calibração e diagnóstico do sistema intercetor de Lordelo utilizando o software Storm Water Management Model, através dos dados recolhidos a partir do projeto de Reabilitação dos intercetores de Lordelo, elaborado pela Noraqua. A modelação considera a avaliação das afluências de tempo seco e as afluências pluviais pelo software Sanitary Sewer Overflow Analysis and Planning Toolbox. Com efeito, a simulação dinâmica, permitiu um conhecimento mais detalhado do sistema, avaliando a capacidade hidráulica e localizando os pontos propícios a inundações. Assim, foi possível testar soluções de beneficiação do sistema, englobando a problemática das afluências pluviais indevidas calibradas. Apesar das dificuldades sentidas face à qualidade dos dados existentes, verificou-se que o SSOAP e o SWMM são ferramentas úteis na deteção, diagnóstico e redução dos caudais em excesso e que o procedimento utilizado pode ser aplicado a sistemas semelhantes, como forma de definir a melhor solução técnica e económica ao nível do planeamento, operação e reabilitação do sistema.
Resumo:
Report for the scientific sojourn carried out at the Model-based Systems and Qualitative Reasoning Group (Technical University of Munich), from September until December 2005. Constructed wetlands (CWs), or modified natural wetlands, are used all over the world as wastewater treatment systems for small communities because they can provide high treatment efficiency with low energy consumption and low construction, operation and maintenance costs. Their treatment process is very complex because it includes physical, chemical and biological mechanisms like microorganism oxidation, microorganism reduction, filtration, sedimentation and chemical precipitation. Besides, these processes can be influenced by different factors. In order to guarantee the performance of CWs, an operation and maintenance program must be defined for each Wastewater Treatment Plant (WWTP). The main objective of this project is to provide a computer support to the definition of the most appropriate operation and maintenance protocols to guarantee the correct performance of CWs. To reach them, the definition of models which represent the knowledge about CW has been proposed: components involved in the sanitation process, relation among these units and processes to remove pollutants. Horizontal Subsurface Flow CWs are chosen as a case study and the filtration process is selected as first modelling-process application. However, the goal is to represent the process knowledge in such a way that it can be reused for other types of WWTP.
Resumo:
Introduction: As part of the roadside development along the Interstate Highway System, the Iowa State Highway Commission has constructed eight pair of rest area facilities. Furthermore, two pair are presently under construction with an additional two pair proposed for letting in 1967. An additional nine and one-half pairs of rest areas are in the planning phase, a grand total of 45 rest Brea buildings. The facilities existing were planned and designed in a relatively short period of time. The rest area facilities are unusual in terms of water use, water demand rates, and the fact that there are no applicable guidelines from previous installations. Such facilities are a pioneering effort to furnish a service -which the travelling public desires and will use. The acceptance and current use of the existing facilities shows that the rest areas do provide a service the public will use and appreciate. The Iowa State Highway Commission is to be congratulated for this· pioneering effort. However there are problems, as should be expected when design of a new type of facility has no past operating experience to use as a guide. Another factor which enters is that a rest area facility is quite different and rather unrelated to engineering in the highway field of practice. Basically, the problems encountered can be resolved into several areas, namely 1) maintenance problems in equipment due to 2) insufficient capacity of several other elements of the water systems, and 3) no provisions for water quality control. This study and report is supposed to essentially cover the review of the rest areas, either existing and under construction or letting. However, the approach used has been somewhat different. Several basic economically feasible water system schemes have been developed which are· adaptable to the different well capacities and different water qualities encountered. These basic designs are used as a guide in recommending modifications to the existing rest area water systems, anticipating that the basic designs will be used for future facilities. The magnitude of the problems involved is shown by the fact that the projected water use and demand variations of each rest area building is equivalent to the water supply for a community of about 100 people. The problems of proper operation and maintenance of an eventual thirty to forty-five such facilities are gigantic. For successful operation the rest area water systems must have a high degree of standardization and interchangeability of all elements of the water systems, even if it means a limited degree of over-design in some rest area facilities.