992 resultados para Group Replacement Scheduling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The study’s main purpose was the assessment of the environmental fungal contamination, the exploration of possible associations between related environmental variables and the study of the relationship between fungal contamination of air and surfaces. A descriptive study was developed based upon air and surfaces monitoring for fungal contamination in ten indoor gymnasiums with a swimming pool located in Lisbon’s urban area. Fifty 200 litres air samples and 120 surface swabs were collected. Surfaces samples were collected before and after cleaning and disinfection and temperature and relative humidity values were registered during the collection period. Twenty five different species of fungi were identified in the air samples, being the three most commonly isolated genera the following: Cladosporium (36.6%), Penicillium (19.0%) and Aspergillus (10.2%). Thirty-seven different species of fungi were identified in the surface samples. Fusarium sp. was the most frequent genera before (19.1%) and after (17.2%) cleaning and disinfection. There was a significant association between the numbers of visitors and the fungal contamination determined in the surface samples (p<0.05). There was no significant association (p>0.05) between the contamination encountered in the air samples and the one registered in the surface samples and between the fungal contamination and the temperature or relative humidity measured on location. The data obtained enabled the assessment of the establishment’s fungal contamination and led the authors to conclude, consequently, that physical activity, which generally promotes health, can in fact be challenged by this factor.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Since the number and proportion of old people increases worldwide, health professionals and systems should be made aware and prepared to deal with their problems. Cognitive deficit and symptoms of depression are commom among the elderly, and may occur in relation to various risk factors such as health conditions and psychosocial variables. In order to study cognitive deficit and the presence of signs and symptoms of depression, 62 elderly community subjects enrolled at a Community Health Unit in Porto Alegre, southern Brazil, were interviewed. They were evaluated by means of the Mini Mental State Exam, the Montgomery-Asberg Depression rating scale, and a questionnaire on health conditions, living arrangements and social variables. Higher levels of symptoms of depression were observed among subjects exposed to major risk factors for cerebrovascular diseases (diabetes and coronary disease), while impaired cognitive performance was seen among individuals who could not count on the presence of a confidant (social network variable). The results suggest that the early identification of major risk groups among old people can help to prevent institutionalization and keep individuals in the community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent reservoirs under competitive environment. We propose a new nonlinear optimization method to consider hydroelectric power generation as a function of water discharge and also of the head. Head-dependency is considered on short-term hydro scheduling in order to obtain more realistic and feasible results. The proposed method has been applied successfully to solve a case study based on one of the main Portuguese cascaded hydro systems, providing a higher profit at a negligible additional computation time in comparison with a linear optimization method that ignores head-dependency.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper is on the problem of short-term hydro, scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Based on our recent discovery of closed form formulae of efficient Mean Variance retentions in variable quota-share proportional reinsurance under group correlation, we analyzed the influence of different combination of correlation and safety loading levels on the efficient frontier, both in a single period stylized problem and in a multiperiod one.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Screening programs, particularly the inclusion of specific orthoptic tests to detect visual abnormalities, varies among countries. This study aims to: 1) describes expert perception of issues related with children visual screening; 2) identify specific orthoptic tests to detect visual abnormalities in children visual screening.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

PURPOSE: To analyze and compare the Ground Reaction Forces (GRF), during the stance phase of walking in pregnant women in the 3rd trimester of pregnancy, and non pregnant women. METHODS: 20 women, 10 pregnant and 10 non pregnant, voluntarily took part in this study. GRF were measured (1000 Hz) using a force platform (BERTEC 4060-15), an amplifier (BERTEC AM 6300) and an analogical-digital converter of 16 Bits (Biopac). RESULTS: The study showed that there were significant differences among the two groups concerning absolute values of time of the stance phase. In what concerns to the normalized values the most significant differences were verified in the maximums values of vertical force (Fz3, Fz1) and in the impulse of the antero-posterior force (Fy2), taxes of growth of the vertical force, and in the period of time for the antero-posterior force (Fy) be null. CONCLUSIONS: It is easier for the pregnant to continue forward movement (push-off phase). O smaller growth rates in what concerns to the maximum of the vertical force (Fz1) for the pregnant, can be associated with a slower speed of gait, as an adaptation strategy to maintain the balance, to compensate the alterations in the position of her center of gravity due to the load increase. The data related to the antero-posterior component of the force (Fy), shows that there is a significant difference between the pregnant woman’s left foot and right foot, which accuses a different functional behavior in each one of the feet, during the propulsion phase (TS).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper proposes a wind power forecasting methodology based on two methods: direct wind power forecasting and wind speed forecasting in the first phase followed by wind power forecasting using turbines characteristics and the aforementioned wind speed forecast. The proposed forecasting methodology aims to support the operation in the scope of the intraday resources scheduling model, namely with a time horizon of 5 minutes. This intraday model supports distribution network operators in the short-term scheduling problem, in the smart grid context. A case study using a real database of 12 months recorded from a Portuguese wind power farm was used. The results show that the straightforward methodology can be applied in the intraday model with high wind speed and wind power accuracy. The wind power forecast direct method shows better performance than wind power forecast using turbine characteristics and wind speed forecast obtained in first phase.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The use of distributed energy resources, based on natural intermittent power sources, like wind generation, in power systems imposes the development of new adequate operation management and control methodologies. A short-term Energy Resource Management (ERM) methodology performed in two phases is proposed in this paper. The first one addresses the day-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. The ERM scheduling is a complex optimization problem due to the high quantity of variables and constraints. In this paper the main goal is to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixedinteger non-linear programming approach. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units and 1000 electric vehicles has been implemented in a simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Smart Grids (SGs) appeared as the new paradigm for power system management and operation, being designed to integrate large amounts of distributed energy resources. This new paradigm requires a more efficient Energy Resource Management (ERM) and, simultaneously, makes this a more complex problem, due to the intensive use of distributed energy resources (DER), such as distributed generation, active consumers with demand response contracts, and storage units. This paper presents a methodology to address the energy resource scheduling, considering an intensive use of distributed generation and demand response contracts. A case study of a 30 kV real distribution network, including a substation with 6 feeders and 937 buses, is used to demonstrate the effectiveness of the proposed methodology. This network is managed by six virtual power players (VPP) with capability to manage the DER and the distribution network.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The reactive power management is an important task in future power systems. The control of reactive power allows the increase of distributed energy resources penetration as well as the optimal operation of distribution networks. Currently, the control of reactive power is only controlled in large power units and in high and very high voltage substations. In this paper a reactive power control in smart grids paradigm is proposed, considering the management of distributed energy resources and of the distribution network by an aggregator namely Virtual Power Player (VPP).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Effective legislation and standards for the coordination procedures between consumers, producers and the system operator supports the advances in the technologies that lead to smart distribution systems. In short-term (ST) maintenance scheduling procedure, the energy producers in a distribution system access to the long-term (LT) outage plan that is released by the distribution system operator (DSO). The impact of this additional information on the decision-making procedure of producers in ST maintenance scheduling is studied in this paper. The final ST maintenance plan requires the approval of the DSO that has the responsibility to secure the network reliability and quality, and other players have to follow the finalized schedule. Maintenance scheduling in the producers’ layer and the coordination procedure between them and the DSO is modelled in this paper. The proposed method is applied to a 33-bus distribution system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The introduction of new distributed energy resources, based on natural intermittent power sources, in power systems imposes the development of new adequate operation management and control methods. This paper proposes a short-term Energy Resource Management (ERM) methodology performed in two phases. The first one addresses the hour-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. Both phases consider the day-ahead resource scheduling solution. The ERM scheduling is formulated as an optimization problem that aims to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixed-integer non-linear programming approach and by a heuristic approach based on genetic algorithms. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units has been implemented in a PSCADbased simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper addresses the problem of energy resources management using modern metaheuristics approaches, namely Particle Swarm Optimization (PSO), New Particle Swarm Optimization (NPSO) and Evolutionary Particle Swarm Optimization (EPSO). The addressed problem in this research paper is intended for aggregators’ use operating in a smart grid context, dealing with Distributed Generation (DG), and gridable vehicles intelligently managed on a multi-period basis according to its users’ profiles and requirements. The aggregator can also purchase additional energy from external suppliers. The paper includes a case study considering a 30 kV distribution network with one substation, 180 buses and 90 load points. The distribution network in the case study considers intense penetration of DG, including 116 units from several technologies, and one external supplier. A scenario of 6000 EVs for the given network is simulated during 24 periods, corresponding to one day. The results of the application of the PSO approaches to this case study are discussed deep in the paper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Metaheuristics performance is highly dependent of the respective parameters which need to be tuned. Parameter tuning may allow a larger flexibility and robustness but requires a careful initialization. The process of defining which parameters setting should be used is not obvious. The values for parameters depend mainly on the problem, the instance to be solved, the search time available to spend in solving the problem, and the required quality of solution. This paper presents a learning module proposal for an autonomous parameterization of Metaheuristics, integrated on a Multi-Agent System for the resolution of Dynamic Scheduling problems. The proposed learning module is inspired on Autonomic Computing Self-Optimization concept, defining that systems must continuously and proactively improve their performance. For the learning implementation it is used Case-based Reasoning, which uses previous similar data to solve new cases. In the use of Case-based Reasoning it is assumed that similar cases have similar solutions. After a literature review on topics used, both AutoDynAgents system and Self-Optimization module are described. Finally, a computational study is presented where the proposed module is evaluated, obtained results are compared with previous ones, some conclusions are reached, and some future work is referred. It is expected that this proposal can be a great contribution for the self-parameterization of Metaheuristics and for the resolution of scheduling problems on dynamic environments.