Nonlinear optimization method for short-term hydro scheduling considering head-dependency


Autoria(s): Catalão, João Paulo da Silva; Mariano, S. J. P. S.; Mendes, Víctor Manuel Fernandes; Ferreira, L. A. F. M.
Data(s)

13/03/2012

13/03/2012

01/03/2010

Resumo

This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent reservoirs under competitive environment. We propose a new nonlinear optimization method to consider hydroelectric power generation as a function of water discharge and also of the head. Head-dependency is considered on short-term hydro scheduling in order to obtain more realistic and feasible results. The proposed method has been applied successfully to solve a case study based on one of the main Portuguese cascaded hydro systems, providing a higher profit at a negligible additional computation time in comparison with a linear optimization method that ignores head-dependency.

Identificador

Catalão J P S, Mariano S J P S, Mendes V M F, Ferreira L A F M. Nonlinear optimization method for short-term hydro scheduling considering head-dependency.European Transactions on Electrical Power. 2010; 20 (2): 172-183.

1430-144X

http://hdl.handle.net/10400.21/1275

Idioma(s)

eng

Publicador

John Wiley & Sons LTD

Relação

2;

Direitos

restrictedAccess

Palavras-Chave #Short-term Hydro Scheduling #Nonlinear Optimization #Cascaded Reservoirs #Head-dependency #Hydrothermal Power-Systems #Electricity Market #Neural-Network #Thermal Units #Algorithm #Constraints #Chain #Price #Flow
Tipo

article