924 resultados para software project


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report presents a summary of the research conducted by the research team of the CRC project 2002-005-C, “Decision support tools for concrete infrastructure rehabilitation”. The project scope, objectives, significance and innovation and the research methodology is outlined in the introduction, which is followed by five chapters covering different aspects of the research completed. Major findings of a review of literature conducted covering both use of fibre reinforced polymer composites in rehabilitation of concrete bridge structures and decision support frameworks in civil infrastructure asset management is presented in chapter two. Case study of development of a strengthening scheme for the “Tenthill Creek bridge” is covered in the third chapter, which summarises the capacity assessment, traditional strengthening solution and the innovative solution using FRP composites. The fourth chapter presents the methodology for development of a user guide covering selection of materials, design and application of FRP in strengthening of concrete structures, which were demonstrated using design examples. Fifth chapter presents the methodology developed for evaluating whole of life cycle costing of treatment options for concrete bridge structures. The decision support software tool developed to compare different treatment options based on reliability based whole of life cycle costing will be briefly described in this chapter as well. The report concludes with a summary of findings and recommendations for future research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Objectives The objectives of this project were two-fold: • Assess the ease with which current architectural CAD systems supported the use ofparametric descriptions in defining building shape, engineering system performance and cost at the early stages of building design; • Assess the feasibility of implementing a software decision support system that allowed designers to trade-off the characteristics and configuration of various engineering systems to move towards a “global optimum” rather than considering each system in isolation and expecting humans to weigh up all of the costs and benefits. The first stage of the project consisted of using four different CAD systems to define building shells (envelopes) with different usages. These models were then exported into a shared database using the IFC information exchange specifications. The second stage involved the implementation of small computer programs that were able to estimate relevant system parameters based on performance requirements and the constraints imposed by the other systems. These are presented in a unified user interface that extracts the appropriate building shape parameters from the shared database Note that the term parametric in this context refers to the relationships among and between all elements of the building model - not just geometric associations - which will enable the desired coordination.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Key topics: Since the birth of the Open Source movement in the mid-80's, open source software has become more and more widespread. Amongst others, the Linux operating system, the Apache web server and the Firefox internet explorer have taken substantial market shares to their proprietary competitors. Open source software is governed by particular types of licenses. As proprietary licenses only allow the software's use in exchange for a fee, open source licenses grant users more rights like the free use, free copy, free modification and free distribution of the software, as well as free access to the source code. This new phenomenon has raised many managerial questions: organizational issues related to the system of governance that underlie such open source communities (Raymond, 1999a; Lerner and Tirole, 2002; Lee and Cole 2003; Mockus et al. 2000; Tuomi, 2000; Demil and Lecocq, 2006; O'Mahony and Ferraro, 2007;Fleming and Waguespack, 2007), collaborative innovation issues (Von Hippel, 2003; Von Krogh et al., 2003; Von Hippel and Von Krogh, 2003; Dahlander, 2005; Osterloh, 2007; David, 2008), issues related to the nature as well as the motivations of developers (Lerner and Tirole, 2002; Hertel, 2003; Dahlander and McKelvey, 2005; Jeppesen and Frederiksen, 2006), public policy and innovation issues (Jullien and Zimmermann, 2005; Lee, 2006), technological competitions issues related to standard battles between proprietary and open source software (Bonaccorsi and Rossi, 2003; Bonaccorsi et al. 2004, Economides and Katsamakas, 2005; Chen, 2007), intellectual property rights and licensing issues (Laat 2005; Lerner and Tirole, 2005; Gambardella, 2006; Determann et al., 2007). A major unresolved issue concerns open source business models and revenue capture, given that open source licenses imply no fee for users. On this topic, articles show that a commercial activity based on open source software is possible, as they describe different possible ways of doing business around open source (Raymond, 1999; Dahlander, 2004; Daffara, 2007; Bonaccorsi and Merito, 2007). These studies usually look at open source-based companies. Open source-based companies encompass a wide range of firms with different categories of activities: providers of packaged open source solutions, IT Services&Software Engineering firms and open source software publishers. However, business models implications are different for each of these categories: providers of packaged solutions and IT Services&Software Engineering firms' activities are based on software developed outside their boundaries, whereas commercial software publishers sponsor the development of the open source software. This paper focuses on open source software publishers' business models as this issue is even more crucial for this category of firms which take the risk of investing in the development of the software. Literature at last identifies and depicts only two generic types of business models for open source software publishers: the business models of ''bundling'' (Pal and Madanmohan, 2002; Dahlander 2004) and the dual licensing business models (Välimäki, 2003; Comino and Manenti, 2007). Nevertheless, these business models are not applicable in all circumstances. Methodology: The objectives of this paper are: (1) to explore in which contexts the two generic business models described in literature can be implemented successfully and (2) to depict an additional business model for open source software publishers which can be used in a different context. To do so, this paper draws upon an explorative case study of IdealX, a French open source security software publisher. This case study consists in a series of 3 interviews conducted between February 2005 and April 2006 with the co-founder and the business manager. It aims at depicting the process of IdealX's search for the appropriate business model between its creation in 2000 and 2006. This software publisher has tried both generic types of open source software publishers' business models before designing its own. Consequently, through IdealX's trials and errors, I investigate the conditions under which such generic business models can be effective. Moreover, this study describes the business model finally designed and adopted by IdealX: an additional open source software publisher's business model based on the principle of ''mutualisation'', which is applicable in a different context. Results and implications: Finally, this article contributes to ongoing empirical work within entrepreneurship and strategic management on open source software publishers' business models: it provides the characteristics of three generic business models (the business model of bundling, the dual licensing business model and the business model of mutualisation) as well as conditions under which they can be successfully implemented (regarding the type of product developed and the competencies of the firm). This paper also goes further into the traditional concept of business model used by scholars in the open source related literature. In this article, a business model is not only considered as a way of generating incomes (''revenue model'' (Amit and Zott, 2001)), but rather as the necessary conjunction of value creation and value capture, according to the recent literature about business models (Amit and Zott, 2001; Chresbrough and Rosenblum, 2002; Teece, 2007). Consequently, this paper analyses the business models from these two components' point of view.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There are many studies that reveal the nature of design thinking and the nature of conceptual design as distinct from detailed or embodiment design. The results can assist in our understanding of how the process of design can be supported and how new technologies can be introduced into the workplace. Existing studies provide limited information about the nature of collaborative design as it takes place on the ground and in the actual working context. How to provide appropriate and effective of support for collaborative design information sharing across companies, countries and heterogeneous computer systems is a key issue. As data are passed between designers and the computer systems they employ, many exchanges are made. These exchanges may be used to establish measures of the benefits that new support systems can bring. Collaboration support tools represent a fast growing section of the commercial software market place and a reasonable range of products are available. Many of them offer significant application to design for the support of distributed meetings by the provision of video and audio communications and the sharing of information, including collaborative sketching. The tools that specifically support 3D models and other very design specific features are less common and many of those are in prototype stages of development. A key question is to find viable ways of combining design information visualisation support with the collaboration support technologies that can be seen today. When collaborating, different views will need to be accessible at different times to all the collaborators. The architects may want to explain some ideas on their model, the structural engineers on their model and so on. However, there are issues of ownership when the structural engineer wants to manipulate the architect’s model and vice versa. The modes of working, synchronous or asynchronous may have a bearing as in a synchronous session there is control of what is happening.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Current software tools for documenting and developing models of buildings focus on supporting a single user who is a specialist in the specific software used within their own discipline. Extensions to these tools for use by teams maintain the single discipline view and focus on version and file management. There is a perceived need in industry to have tools that specifically support collaboration among individuals from multiple disciplines with both a graphical representation of the design and a persistent data model. This project involves the development of a prototype of such a software tool. We have identified multi-user 3D virtual worlds as an appropriate software base for the development of a collaborative design tool. These worlds are inherently multi-user and therefore directly support collaboration through a sense of awareness of others in the virtual world, their location within the world, and provide various channels for direct and indirect communication. Such software platforms also provide a 3D building and modelling environment that can be adapted to the needs of the building and construction industry. DesignWorld is a prototype system for collaborative design developed by augmenting the Second Life (SL) commercial software platform1 with a collection web-based tools for communication and design. Agents manage communication between the 3D virtual world and the web-based tools. In addition, agents maintain a persistent external model of designs in the 3D world which can be augmented with data such as relationships, disciplines and versions not usually associated with 3D virtual worlds but required in design scenarios.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project is an extension of a previous CRC project (220-059-B) which developed a program for life prediction of gutters in Queensland schools. A number of sources of information on service life of metallic building components were formed into databases linked to a Case-Based Reasoning Engine which extracted relevant cases from each source. In the initial software, no attempt was made to choose between the results offered or construct a case for retention in the casebase. In this phase of the project, alternative data mining techniques will be explored and evaluated. A process for selecting a unique service life prediction for each query will also be investigated. This report summarises the initial evaluation of several data mining techniques.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the previous phase of this project, 2002-059-B Case-Based Reasoning in Construction and Infrastructure Projects, demonstration software was developed using a case-base reasoning engine to access a number of sources of information on lifetime of metallic building components. One source of information was data from the Queensland Department of Public Housing relating to maintenance operations over a number of years. Maintenance information is seen as being a particularly useful source of data about service life of building components as it relates to actual performance of materials in the working environment. If a building is constructed in 1984 and the maintenance records indicate that the guttering was replaced in 2006, then the service life of the gutters was 22 years in that environment. This phase of the project aims to look more deeply at the Department of Housing data, as an example of maintenance records, and formulate methods for using this data to inform the knowledge of service lifetimes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Practice placement education has been recognised as an integral and critical component of the training of occupational therapy students. Although there is an extensive body of literature on clinical education and traditional practice placement education models, there has been limited research on alternative placements.-------- This paper reviews the literature on various practice placement education models and presents a contemporary view on how it is currently delivered. The literature is examined with a particular focus on the increasing range of practice placement education opportunities, such as project and role-emerging placements. The drivers for non-traditional practice placement education include shortages of traditional placement options, health reform and changing work practices, potential for role development and influence on practice choice. The benefits and challenges of non-traditional practice placement education are discussed, including supervision issues, student evaluation, professional and personal development and the opportunity to practise clinical skills.--------- Further research is recommended to investigate occupational therapy graduates' perceptions of role-emerging and project placements in order to identify the benefits or otherwise of these placements and to contribute to the limited body of knowledge of emerging education opportunities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The paper presents an interim summary of research and case studies being undertaken in the Sydney Opera House FM Exemplar Project covering procurement, benchmarking and building information models. The final outcomes of the FM Exemplar Project will be presented through various forums open to all FM practitioners and published in Australia and elsewhere through relevant journals. Sydney Opera House is an Australian icon, attracting some 4.5 million visitors per year who admire its built form and enjoy an evening of theatre. The building is the attraction, part of the experience. Therefore, facilities management is critical to the success of the Sydney Opera House enterprise and an ideal subject for the study of facilities management. Significantly the three research themes are heavily intertwined – effective risk sharing in procurement requires historic information and benchmarks for future performance, benchmarking gathers vast quantities of data that can only be exploited if properly related to one another and a building information model provides the means to manage such data. The case studies are emerging as real-life examples of how one organisation is addressing FM issues common to many, and will provide useful lessons for practitioners pursing similar strategies in their own organisations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Facility managers have to acquire, integrate, edit and update diverse facility information ranging from building elements & fabric data, operational costs, contract types, room allocation, logistics, maintenance, etc. With the advent of standardized Building Information Models (BIM) such as the Industry Foundation Classes (IFC) new opportunities are available for Facility Managers to manage their FM data. The usage of IFC supports data interoperability between different software systems including the use of operational data for facility management systems. Besides the re-use of building data, the Building Information Model can be used as an information framework for storing and retrieving FM related data. Currently several BIM driven FM systems are available including IFC compliant ones. These systems have the potential to not only manage primary data more effectively but also to offer practical systems for detailed monitoring, and analysis of facility performance that can underpin innovative and more cost effective management of complex facilities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Automated Estimator and LCADesign are two early examples of nD modelling software which both rely on the extraction of quantities from CAD models to support their further processing. The issues of building information modelling (BIM), quantity takeoff for different purposes and automating quantity takeoff are discussed by comparing the aims and use of the two programs. The technical features of the two programs are also described. The technical issues around the use of 3D models is described together with implementation issues and comments about the implementation of the IFC specifications. Some user issues that emerged through the development process are described, with a summary of the generic research tasks which are necessary to fully support the use of BIM and nD modelling.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper describes the process adopted in developing an integrated decision support framework for planning of office building refurbishment projects, with specific emphasize on optimising rentable floor space, structural strengthening, residual life and sustainability. Expert opinion on the issues to be considered in a tool is being captured through the DELPHI process, which is currently ongoing. The methodology for development of the integrated tool will be validated through decisions taken during a case study project: refurbishment of CH1 building of Melbourne City Council, which will be followed through to completion by the research team. Current status of the CH1 planning will be presented in the context of the research project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Worldwide, the current pattern of urban development is unsustainable and metropolitan planning and development strategies deliver poor environmental outcomes in relation to energy production. As a result, an increasing number of governments and private sector development companies are initiating projects that aim to deliver enhanced environmental outcomes rather than a ‘business as usual’ approach. This paper will summarise the findings from a study that explored the link between building orientation and energy efficiencies in sub-tropical and tropical climates. The study used a new thermal modelling software tool developed by CSIRO that responds more accurately to residential heating and cooling energy performance in those climate zones. This software tool responds to industry criticisms regarding cold climate modelling systems that do not make sufficient allowance for natural ventilation. The study examined a range of low, medium and high-density dwelling types and investigated the impact of orientation, insulation, ventilation and shading devices on energy efficiencies. This paper will examine the findings from the medium and high-density case study developments as these are relevant to residential developments in many South East Asian countries, such as Singapore, Hong Kong and Malaysia. Finally, the paper will explore the potential benefits that medium and high-density residential developments have in the development of ‘solar cities’ and ‘solar suburbs’.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The importance of designing sustainable buildings is gaining greater acceptance worldwide. Evidence of this is how regulators are incorporating sustainable design principles into building regulations and requirements. The aim being to increase the number of sustainable buildings and move from a traditional voluntary compliance to one that is mandatory. However, developing regulations that actually achieve these aims can be a difficult exercise. Several countries in South East Asia, such as Singapore and Malaysia, have performance based building regulations that are supplemented by prescriptive measures for achieving the desired performance. Australia too has similar building regulations and has had energy efficiency regulations within the Building Code of Australia for over a decade. This paper explores some of the difficulties and problems that Australian regulators have experienced with the performance-based method and the prescriptive or “deemed-to-comply” method and measures that have been taken to try and overcome these problems. These experiences act as a useful guide to all regulators considering the incorporation of sustainable design measures into their countries building regulations. The paper also speculates on future environmental requirements being incorporated into regulations, including the possibility of non-residential buildings being required to meet minimum energy efficiency requirements, and the possible systems that would need to be in place before such requirements were included. Finally, the paper looks at a possible way forward using direct assessment from electronic designs and introduces several software tools that are currently being developed that move towards achieving this goal. Keywords: Sustainable buildings, Performance-based, Regulations, Energy efficiency, Assessment tools.