995 resultados para Rand Park Flood Control Project (Cook County, Ill.)


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Central Park Lake Watershed Assessment and Management Plan identified four categories where improvements are needed to remove the 23 acre lake from the impaired waters list. These include the wastewater system, runoff from surrounding lands, in-lake nutrient re-suspension and runoff from hard surfaces within the park. The lake is currently impaired for bacteria, algae and pH. Through outcomes of the Watershed Assessment and Management Plan, this proposal includes for abandonment and reclamation of the single cell wastewater lagoon site, replacement with three conventional septic systems and construction of two wetlands. One of the wetlands is located on the same site as the reclaimed lagoon and the other is located to intercept sediment and trap nutrients transported by tile lines. The prescribed wastewater system improvements are based on assessment by grab samples test by the State Hygienic Lab, development of a Preliminary Engineering Report, soil analysis and communication with IDNR wastewater officials. The two wetland sites were assessed by officials from IDALS and the Jones County SWCD. This project is part of $1.7 million lake restoration effort to reclaim the 47 year old lake. The lake has a positive economic impact of more than $7.6 million annually and supports an average annual visitation of 58,145, according to the Iowa Lakes Valuation Project, conducted by Iowa State University.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This project concept and assessment of impacts includes information on future four-lane construction of U.S. 151 from the existing four-lane section near Cedar Rapids to Dubuque.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The disposal of discarded tires has become a major problem. Different methods of recycling have been researched. Currently, Iowa is researching the use of ground recycled crumb rubber from discarded tires in asphalt rubber cement. Six projects have been completed in Iowa using asphalt rubber cement. This project is located on IA 947 (University Avenue) in Cedar Falls/Waterloo. The project contains one section with asphalt rubber cement used in both the binder and surface courses and one section using asphalt rubber cement in the surface course with a conventional binder. There are two control sections where conventional asphalt pavement was placed.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Tutkielman päätavoitteena oli tutkia miten projektisalkun hallinnalla voidaan tukea organisaation strategista ohjausta ja liiketoimintaa. Tämän lisäksi avaintavoitteina oli kuvata projektisalkun hallinnan nykytilanne kohdeyrityksessä, paljastaa erityisiä kehitystarpeita ja lopulta luoda kohdeyrityksen projektisalkunhallinnalle tavoitetila. Kirjallisuuskatsauksessa pohdittiin projektisalkun hallinnan roolia ja tavoitteita, projektisalkun hallinnassa käyttävää prosessia, sekä menetelmiä ja tekniikoita, joilla salkkua hallitaan. Työn empiirisessä osassa syvennyttiin tutkimaan projektinsalkun hallintaan liittyviä erityispiirteitä kohdeyrityksessä. Tutkimustulosten huolellinen analysointi osoitti, että aikaisempi kirjallisuus ei riittävästi huomioi kokonaisvaltaisen, integroidun lähestymistavan tarvetta ja viestinnän tärkeyttä projektisalkun hallinnassa. Tutkimuksen johtopäätöksinä luotiin uusi integroitu projektisalkun hallintamalli ja määriteltiin kohdeyritykselle projektisalkun hallinnan tavoitetila sekä ne kehitysaskeleet, joita yrityksen tulisi lähitulevaisuudessa ottaa.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The aim of this study is to develop a suitable project control procedure for a target company that can be used in engineering, procurement, and construction or con-struction management contracts. This procedure contains suitable project control software and a model for the use of the software in practice. This study is divided into two main sections. Theoretical part deals with project management, focusing on cost and time dimensions in projects. Empirical part deals with the development of the project control procedure for the target compa-ny. This development takes place in two parts. In the first part, semi-structured interviews are used to find out the company’s employees’ demands and desires for the project control software which will then be used in the developed procedure. These demands and desires are compared to available software in the market and the most suitable one will be chosen. Interview results show that important factors are cost tracking, integration with other software, English language availability, references, helpdesk, and no need for regular updates. The most suitable one is CMPro5 cost control software. The chosen software is used in a pilot project, where its functions and use are analyzed. Project control procedure which will be used in the future is developed based on these procedures. The five steps in developed procedure include employment of a cost engineer, whose task is to maintain the procedure in the target company.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Charles C. Chapman and Ethel Chapman Wickett at a birthday picnic for Charles C. Chapman at Orange County Park, California, July 2, 1937. [Copy an excerpt of CCCF27]

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Charles C. Chapman, Ethel Chapman Wickett and Stanley Chapman at birthday picnic for Charles C. Chapman at Orange County Park, California, July 2, 1937.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Article of agreement between Alexander Cook, contractor of Humberstone and the Provisional Municipal Council of the county of Welland to construct and build the main drain through the marsh lands tract commencing in lot no. 27 in the 4th concession in the township of Humberstone in a southerly direction (6 pages, handwritten). This is signed by John Frazer, Provisional Warden, Dexter Deverardo and Alexander Cook. (2 copies), Dec. 30, 1854.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

County of Welland estimate of work done on the main drain of the marsh lands by Alexander Cook, signed by S.D. Woodruff. Estimate no.7, Jan. and Feb. and Mar., 1856.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

County of Welland estimate of work done on the main drain of the marsh lands by Alexander Cook, signed by S.D. Woodruff. Estimate no.8, April, 1856.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

County of Welland estimate of work done on the main drain of the marsh lands by Alexander Cook, signed by S.D. Woodruff. Estimate no.9, May, 1856.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

County of Welland estimate of work done on the main drain of the marsh lands by Alexander Cook, signed by S.D. Woodruff. Estimate no.10, June, 1856.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

County of Welland estimate of work done on the main drain of the marsh lands by Alexander Cook, signed by S.D. Woodruff. Estimate no.11, July, 1856.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

County of Welland estimate (copy) of work done on the main drain of the marsh lands by Alexander Cook, signed by S.D. Woodruff. Estimate no.12, Aug., 1856.