957 resultados para Collective Construction
Resumo:
Major construction sites in Australia have an above average presence of ethnic minorities. These groups and the interfaces between them require effective management in order to meet the social imperatives of sustainable design and construction. A survey of 1155 workers and 204 managers on Sydney construction sites respectively, found a significant level of normalisation of negative forms of cross cultural interaction. Yet it was also found that anti-racism programs are not currently a management priority and that they generally lack sophisticated community relations aspects. This paper presents the results of a desk-top study of leading global companies within and outside the construction sector which have won international awards and recognition for their cultural diversity strategies. A key insight is that the companies profiled see diversity as a key resource and as an opportunity rather than a risk which is best harnessed through long-term and on-going commitment of senior management. These leading companies also recognise that cultural diversity strategies operate at three levels - in terms of its relationship with its own workforce; its relationship with its clients and; its relationships with the communities in which it operates - and if properly managed it can be a source of competitive advantage.
Resumo:
The uncertain and dynamic nature of International Construction Joint Venture (ICJV) performance is evolved with many critical factors which lead to make partner relationships more complex in respect of making decisions to maintain a cohesive environment. Addressing to the fact, a generic system dynamics performance model for ICJV is developed by integrating a number variables as to get an overall impact on performance of ICJV and to make effective decisions based on that. In order to formulate and validate the model both structurally and behaviourally, both qualitative and quantitative data are gathered by conducting intensive interviews from two ICJVs in Thailand. After conducting intensive simulations of model, three major problems are identified related to negative value gap, low productivity in construction and high rate of ineffective information sharing of both ICJVs. Several policies are suggested and integrated application of these policies provides a maximum improvement to performance of the ICJV.
Resumo:
Motivation is a major driver of project performance. Despite team member ability to deliver successful project outcomes if they are not positively motivated to pursue joint project goals, then performance will be constrained. One approach to improving the motivation of project organizations is by offering a financial reward for the achievement of set performance standards above a minimum required level. However, little investigation has been undertaken into the features of successful incentive systems as a part of an overall delivery strategy. With input from organizational management literature, and drawing on the literature covering psychological and economic theories of motivation, this paper presents an integrated framework that can be used by project organizations to assess the impact of financial reward systems on motivation in construction projects. The integrated framework offers four motivation indicators which reflect key theoretical concepts across both psychological and economic disciplines. The indicators are: (1) Goal Commitment, (2) Distributive Justice, (3) Procedural Justice, and (4) Reciprocity. The paper also interprets the integrated framework against the results of a successful Australian social infrastructure project case study and identifies key learning’s for project organizations to consider when designing financial reward systems. Case study results suggest that motivation directed towards the achievement of incentive goals is influenced not only by the value placed on the financial reward for commercial benefit, but also driven by the strength of the project initiatives that encourage just and fair dealings, supporting the establishment of trust and positive reciprocal behavior across a project team. The strength of the project relationships was found to be influenced by how attractive the achievement of the goal is to the incentive recipient and how likely they were to push for the achievement of the goal. Interestingly, findings also suggested that contractor motivation is also influenced by the fairness of the performance measurement process and their perception of the trustworthiness and transparency of their client. These findings provide the basis for future research on the impact of financial reward systems on motivation in construction projects. It is anticipated that such research will shed new light on this complex topic and further define how reward systems should be designed to promote project team motivation. Due to the unique nature of construction projects with high levels of task complexity and interdependence, results are expected to vary in comparison to previous studies based on individuals or single-entity organizations.
Resumo:
Social outcomes, in particular intangible social outcomes, are generally difficult to achieve in the construction industry due to the predominantly episodic, fragmented and heavily regulated nature of construction that presupposes a tendency towards mainstream construction processes and design. The Western Australian ‘Percent for Art’ policy is recognized for stimulating social outcomes, by creating richer and more aesthetically pleasing social environments through the incorporation of artwork into public buildings. A case study of four Percent for Art projects highlights the role of the Artwork Selection Committee in incorporating artwork into construction. A total of 20 semi-structured interviews were conducted with committee members and policy officers. Data analysis involved a combination of pattern coding and matrix categorization, and resulted in the identification of the committee’s three key elements of collaborative communication, democratic decision-making and project champions. The findings suggest these key elements foster the interaction, communication and relationships needed to facilitate feedback, enhance relationships, create cross-functional teams and lower project resistance, which are all necessary to overcome constraints to social outcomes in construction. The findings provide greater insight into the mechanisms for achieving social outcomes and a basis for future discussion about the processes for achieving social outcomes in the construction industry.
Resumo:
This paper describes the vulnerability of masonry under shear; first the mechanisms of in-plane and out-of-plane shear performance of masonry are reviewed; both the unreinforced and lightly reinforced masonry wall systems are considered. Factors affecting the response of unreinforced and reinforced masonry to shear are described and the effect of the variability of those factors to the failure mode of masonry shear walls is also discussed. Some critique is provided on the existing design provisions in various masonry standards.
Resumo:
Many studies into construction procurement methods reveal evidence of a need to change the culture and attitude in the construction industry, transition from traditional adversarial relationships to cooperative and collaborative relationships. At the same time there is also increasing concern and discussion on alternative procurement methods, involving a movement away from traditional procurement systems. Relational contracting approaches, such as partnering and relationship management, are business strategies that align the objectives of clients, commercial participants and stakeholders. It provides a collaborative environment and a framework for all participants to adapt their behaviour to project objectives and allows for engagement of those subcontractors and suppliers down the supply chain. The efficacy of relationship management in the client and contractor groups is proven and well documented. However, the industry has a history of slow implementation of relational contracting down the supply chain. Furthermore, there exists little research on relationship management conducted in the supply chain context. This research aims to explore the association between relational contracting structures and processes and supply chain sustainability in the civil engineering construction industry. It endeavours to shed light on the practices and prerequisites for relationship management implementation success and for supply sustainability to develop. The research methodology is a triangulated approach based on Cheung.s (2006) earlier research where questionnaire survey, interviews and case studies were conducted. This new research includes a face-to-face questionnaire survey that was carried out with 100 professionals from 27 contracting organisations in Queensland from June 2008 to January 2009. A follow-up survey sub-questionnaire, further examining project participants. perspectives was sent to another group of professionals (as identified in the main questionnaire survey). Statistical analysis including multiple regression, correlation, principal component factor analysis and analysis of variance were used to identify the underlying dimensions and test the relationships among variables. Interviews and case studies were conducted to assist in providing a deeper understanding as well as explaining findings of the quantitative study. The qualitative approaches also gave the opportunity to critique and validate the research findings. This research presents the implementation of relationship management from the contractor.s perspective. Findings show that the adaption of relational contracting approach in the supply chain is found to be limited; contractors still prefer to keep the suppliers and subcontractors at arm.s length. This research shows that the degree of match and mismatch between organisational structuring and organisational process has an impact on staff.s commitment level and performance effectiveness. Key issues affecting performance effectiveness and relationship effectiveness include total influence between parties, access to information, personal acquaintance, communication process, risk identification, timely problem solving and commercial framework. Findings also indicate that alliance and Early Contractor Involvement (ECI) projects achieve higher performance effectiveness at both short-term and long-term levels compared to projects with either no or partial relationship management adopted.
Resumo:
This paper discusses the level of effectiveness of quality principles and quality management system implementation and the relationship with performance of ISO9000 certified Indonesian contractors. It also discusses the statistical relationship between quality management systems (QMSs) and key performance indicators (KPIs) amongst a large sample of Indonesian construction companies. Data collected is from questionnaire surveys involving Quality Managers, Managers, and Project and Site Engineers representing 77 different companies. Results indicate that even though some contractors have not yet effectively implemented an effective QMS, most of the KPIs of respondent companies are still at the level of high performance. The statistical results show that the relationship between variables of ISO9000 QMS principles and contractors’ KPIs is significant. These results suggest that an increment in the implementation level of QMS principles can increase KPIs, however that much effort is still required for Indonesian contractors to fully effectively implement QMS principles and thus substantially improve performance against KPIs.
Resumo:
Using a thematic story telling approach which draws on ethnographic method, a grounded theory of protest movement continuity is presented. The grounded theory draws from theories and activist stories relating to the facilitative role of movement networks, social contagion theory and the cultural experience of activism. It highlights the contagious influence of protest networks in maintaining protest continuity over time and how this leads to common perceptions of development risk and opportunity within communities. It also reveals how communities use collective values and identity, social capital, emotional dynamics and symbolic artifacts to maintain protest continuity.
Resumo:
This paper presents a Six Sigma case study analysis involving three service organizations of Singapore. The organizations are a local hospital, a construction and related engineering service, and a consultancy service. These organizations embarked on their Six Sigma journey around 2003-2004. Though the hospital was slightly ahead than the other two in beginning Six Sigma. These organizations have since achieved significant service improvements through implementation of Six Sigma to their different divisions. Through a series of structured interviews with Six Sigma project champions, team leaders, and members; project reports; public archives; and observations; this study explores the Six Sigma journey of these organizations. The results portray a list of success factors which led to the Six Sigma initiatives, the process of Six Sigma implementation through proper identification of critical-to-quality characteristics, tools and techniques, and the performance indicators which display the improvements due to Six Sigma.
Resumo:
Emerging from the challenge to reduce energy consumption in buildings is a need for research and development into the more effective use of simulation as a decision-support tool. Despite significant research, persistent limitations in process and software inhibit the integration of energy simulation in early architectural design. This paper presents a green star case study to highlight the obstacles commonly encountered with current integration strategies. It then examines simulation-based design in the aerospace industry, which has overcome similar limitations. Finally, it proposes a design system based on this contrasting approach, coupling parametric modelling and energy simulation software for rapid and iterative performance assessment of early design options.
Resumo:
On obstacle-cluttered construction sites where heavy equipment is in use, safety issues are of major concern. The main objective of this paper is to develop a framework with algorithms for obstacle avoidance and path planning based on real-time three-dimensional job site models to improve safety during equipment operation. These algorithms have the potential to prevent collisions between heavy equipment vehicles and other on-site objects. In this study, algorithms were developed for image data acquisition, real-time 3D spatial modeling, obstacle avoidance, and shortest path finding and were all integrated to construct a comprehensive collision-free path. Preliminary research results show that the proposed approach is feasible and has the potential to be used as an active safety feature for heavy equipment.
Resumo:
Many current HCI, social networking, ubiquitous computing, and context aware designs, in order for the design to function, have access to, or collect, significant personal information about the user. This raises concerns about privacy and security, in both the research community and main-stream media. From a practical perspective, in the social world, secrecy and security form an ongoing accomplishment rather than something that is set up and left alone. We explore how design can support privacy as practical action, and investigate the notion of collective information-practice of privacy and security concerns of participants of a mobile, social software for ride sharing. This paper contributes an understanding of HCI security and privacy tensions, discovered while “designing in use” using a Reflective, Agile, Iterative Design (RAID) method.
Resumo:
The Queensland Building Services Authority (QBSA) regulates the construction industry in Queensland, Australia, with licensing requirements creating differential financial reporting obligations, depending on firm size. Economic theories of regulation and behaviour provide a framework for investigating effects of the financial constraints and financial reporting requirements imposed by QBSA licensing. Data are analysed for all small and medium construction entities operating in Queensland between 2001 and 2006. Findings suggesting that construction licensees are categorizing themselves as smaller to avoid the more onerous and costly financial reporting of higher licensee categories are consistent with US findings from the 2002 Sarbanes-Oxley (SOX) regulation which created incentives for small firms to stay small to avoid the costs of compliance with more onerous financial reporting requirements. Such behaviour can have the undesirable economic consequences of adversely affecting employment, investment, wealth creation and financial stability. Insights and implications from the analysed QBSA processes are important for future policy reform and design, and useful to be considered where similar regulatory approaches are planned.
Resumo:
Building Information Modeling (BIM) is a modern approach to the design, documentation, delivery, and life cycle management of buildings through the use of project information databases coupled with object-based parametric modeling. BIM has the potential to revolutionize the Architecture, Engineering and Construction (AEC) industry in terms of the positive impact it may have on information flows, working relationships between project participants from different disciplines and the resulting benefits it may achieve through improvements to conventional methods. This chapter reviews the development of BIM, the extent to which BIM has been implemented in Australia, and the factors which have affected the up-take of BIM. More specifically, the objectives of this chapter are to investigate the adoption of BIM in the Australian AEC industry and factors that contribute towards the uptake (or non uptake) of BIM. These objectives are met by a review of the related literature in the first instance, followed by the presentation of the results of a 2007 postal questionnaire survey and telephone interviews of a random sample of professionals in the Australian AEC industry. The responses suggest that less than 25 percent of the sample had been involved in BIM – rather less than might be expected from reading the literature. Also, of those who have been involved with BIM, there has been very little interdisciplinary collaboration. The main barriers impeding the implementation of BIM widely across the Australian AEC industry are also identified. These were found to be primarily a lack of BIM expertise, lack of awareness and resistance to change. The benefits experienced as a result of using BIM are also discussed. These include improved design consistency, better coordination, cost savings, higher quality work, greater productivity and increased speed of delivery. In terms of conclusion, some suggestions are made concerning the underlying practical reasons for the slow up-take of BIM and the successes for those early adopters. Prospects for future improvement are discussed and proposals are also made for a large scale worldwide comparative study covering industry-wide participants
Resumo:
The editor, Gerard de Valence, points out in the preface, this book is neither a textbook nor a guide to what is done by construction managers and construction economists – read quantity surveyors and the like. Rather, de Valence notes it comprises a collection of chapters each of which focus on matters at the industry level and, in doing so, illustrates that a substantially improved understanding of the building and construction industry can be gained beyond the economics of delivering projects. Before giving some thought to how far each of the chapters achieve this, it’s worth reflecting on the virtues of developing construction economics as its own discipline or sub-discipline in general economics and the bold manner by which de Valence is proposing we do this. That is, de Valence proposes partitioning industry and project economics - as explained in the preface and in Chapter 1. de Valence’s view that “the time seems right” for these developments is also worthy of some consideration.