974 resultados para Infrastructure planning


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This is the annual report of the State Planning Commission. It tells about the program that the state has finished work on and is still working on. Plus plans for progress of the capital areas and surrounding buildings.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Legislative Council established the Continuity of Government Planning Interim Study Committee in 2006 and authorized the Committee to meet during the 2006 Legislative Interim. The Committee was given the following charge: Examine issues relating to the continued functioning of state government following a disaster, including gubernatorial succession, replacement of constitutional officers and department heads, legislative elections to fill vacancies, and continued funding of state government if the General Assembly is unable to meet and pass a budget.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Major maintenance; health, safety, loss of use; and Americans with Disablities Act deficiencies at the Capitol Complex and statewide for twelve agencies and divisions participating in the Vertical Infrastructure Program in collaboration with the Governor's Vertical Infrastructure Advisory Committee, including the Department of Administrative Services; the Department of Commerce, Alcoholic Beverages Division; the Department of Corrections; the Department of Cultural Affairs; the Department of Education, including Iowa Public Television and Iowa Vocational Rehabilitation Services; the Department of Human Services; Iowa Law Enforcement Academy; the Department of Public Safety; Terrace Hill; Iowa Veterans Home and Iowa Workforce Development. The advisory committee meets on a monthly basis to review the progress of the work and to make recommendations on procedures and priorities. Additional information on major maintenance projects is available in the advisory committee's Eighth Annual Report to the Governor, dated December 15, 2006.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In accordance with the Code of Iowa, Section 8.57, this annual report summarizes the status of all ongoing building related projects for which an appropriation from the Rebuild Iowa Infrastructure Fund, the Vertical Infrastructure Fund or the Tobacco Settlement Trust Fund has been made to the Department of Administrative Services. The report includes projects for which funding reverted in 2006 as well as ongoing projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Administrative Services - Human Resources Enterprise (DAS-HRE) has developed a variety of tools and resources to address those concerns. Loss of institutional knowledge, or knowledge transfer as it is more frequently referred to, is one of the main topics of the Workforce Planning Guide. Potential difficulties finding new workers was one of the major reasons for adding a chapter on recruitment in the Applicant Screening Manual.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Replication Template for Improving Transition Outcomes Henry County Transition Partners Prototype. This concise document will help you build a community team and the infrastructure necessary to implement and plan for sustaining specific initiatives.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background: Interventional catheterization is being increasingly used for relief of residual lesions in congenital heart disease. Exact anatomical imaging is crucial in the planning of an intervention. This can be provided non-invasively and without radiation by contrast-enhanced MR angiography (CEMRA). Aim: To evaluate the accuracy of the measurements of the vessels obtained by CEMRA in comparison to those obtained by conventional X-ray angiography (CXA). Methods: Retrospective blinded measurement of the diameters of aorta and pulmonary arteries on the CEMRA and CXA images, in the same locations. Comparison of the results by Pearson correlation and by calculating the limits of agreement. Results: Twenty-one children with congenital heart disease, mean age 5.6 +- 5.2 years, weight 21.1 +- 18.4 kg, underwent CEMRA and catheterization for assessment or treatment of a residual lesion. The time interval between the CEMRA and the CXA examination was 2.6 +- 2.3 months. A total of 98 measurements, 37 of the aorta and 61 of the pulmonary arteries were performed on the images obtained by each technique. The correlation between CEMRA and CXA measurements was excellent, r = 0.97, p < 0.0001. The mean difference between the two techniques was 0.018 +- 1.1mm; the limits of agreement were -2.14 and +2.18mm. Similar agreement was found for measures of the aorta (r +- 0.97, mean difference 0.20 = 1.08 mm) and of the pulmonary arteries (r +- 0.97, mean difference 0.048 = 0.89 mm). Conclusions: CEMRA provide accurate quantitative anatomical information, which highly agrees with CXA data, and can therefore be used for planning interventional catheterization.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Around 11.5 * 106 m3 of rock detached from the eastern slope of the Santa Cruz valley (San Juan province, Argentina) in the first fortnight of January 2005. The rockslide?debris avalanche blocked the course, resulting in the development of a lake with maximum length of around 3.5 km. The increase in the inflow rate from 47,000?74,000 m3/d between April and October to 304,000 m3/d between late October and the first fortnight of November, accelerated the growing rate of the lake. On 12 November 2005 the dam failed, releasing 24.6 * 106 m3 of water. The resulting outburst flood caused damages mainly on infrastructure, and affected the facilities of a hydropower dam which was under construction 250 km downstream from the source area. In this work we describe causes and consequences of the natural dam formation and failure, and we dynamically model the 2005 rockslide?debris avalanche with DAN3D. Additionally, as a volume ~ 24 * 106 m3of rocks still remain unstable in the slope, we use the results of the back analysis to forecast the formation of a future natural dam. We analyzed two potential scenarios: a partial slope failure of 6.5 * 106 m3 and a worst case where all the unstable volume remaining in the slope fails. The spreading of those potential events shows that a new blockage of the Santa Cruz River is likely to occur. According to their modeled morphometry and the contributing watershed upstream the blockage area, as the one of 2005, the dams would also be unstable. This study shows the importance of back and forward analysis that can be carried out to obtain critical information for land use planning, hazards mitigation, and emergency management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

House file 2782 (2007 Infrastructure Appropriations Act) requires state agencies that receive appropriations from specific funds to report that information. The Iowa Department of Transportation received funds from the Rebuild Iowa Infrastructure Fund, the State Recreational Trails Fund, the Health Restricted Capitals, and the Rail Revolving Loan and Grant Program in FY 2007. These are the status reports for those funds and the status of the FY2006 funds received from the State Recreational Trails Fund, the Rebuild Iowa Infrastructure Fund and the Tobacco Settlement Trust Fund.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Special investigation of the Area XV Regional Planning Commission located in Ottumwa, Iowa for the period July 1, 2000 through June 30, 2006

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Today you will be biking over the Iowa and Cedar rivers, two major rivers hit by the Iowa flood of 2008. Three miles northeast of North Liberty you’ll cross the Iowa River. The river crested on June 15, 2008 at a record 31.53 ft., three feet higher than the previous record during the flood of 1993. The flooding river caused extensive damage to the University of Iowa (see cover photo of Iowa Memorial Union taken by Univ. Relations, Univ. of Iowa), Coralville, and numerous smaller towns. The flooding of the Cedar River, which RAGBRAI will cross at Sutliff, caused even greater damage. At Cedar Rapids, the 2008 flood crest of 31.12 ft. was over 11 ft. higher than the previous record set in 1851! This massive amount of water inundated downtown Cedar Rapids, Palo, and Columbus Junction and caused massive damage to buildings and infrastructure. When crossing the Cedar River at Sutliff, be sure to look to your right to see the remains of the Historic Sutliff Bridge, one of the many casualties of the Iowa flood of 2008.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report summaries the work of the committee over the last year and its vision for the future. The committee is followed with interest the work of the Department of Corrections and the Department of Veterans Affairs in evaluating the needs of their facilities and recommends similar evaluations of facilities around the state by other agencies. The committee members are ready to offer advice on the needs of the state's again infrastructure and steps that could be taken to evaluate vacant and underutilized buildings and reduce operational and maintenance costs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Desde a última década do séc. XX, o turismo em Cabo Verde tem sido um dos sectores que mais cresce, atraindo maior investimento directo estrangeiro. Contudo, este crescimento gerou também maior pressão sobre os recursos existentes, com impactes negativos a vários níveis. Tem-se reflectido e discutido a sustentabilidade do turismo em território nacional, com objectivos claros de valorização do destino turístico cabo-verdiano, através da conservação e melhoria do ambiente natural, social e cultural. A aposta das autoridades cabo-verdianas no incremento do turismo para o séc. XXI levou a eleição do ecoturismo como a actividade de futuro, com o objectivo de melhorar a competitividade da oferta turística, ser uma alternativa no sector. Uma actividade que pode ser implementada em qualquer ilha, desde que bem aproveitada a vasta oferta de produtos existentes, envolva e forme a população da importância da conservação da biodiversidade e contribua para a erradicação da pobreza ao gerar recursos económicos para as comunidades locais. Deste modo, se requer pensar que arquitectura para o planeamento e realização de infra- estruturas físicas para o adequado desenvolvimento do ecoturismo em Cabo Verde. Os actores directos como os arquitectos, engenheiros civis e planeadores têm uma enorme responsabilidade ao desenhar e executar obras para o turismo, sobre tudo em ecossistemas de grande fragilidade como os que caracterizam as áreas naturais. Sendo um assunto relativamente recente no país, ainda não se criaram normas, regras, directivas claras para o desenvolvimento deste tipo de infra-estruturas turísticas. Em muitos casos, são os próprios desenhadores e construtores, bem como aos seus clientes, quando demonstram alguma sensibilidade na conservação e preservação de áreas de significação ecológica, estabelecem os seus próprios critérios de desenho e códigos éticos que garantam o mínimo de impacte ambiental e uma interacção harmoniosa e sustentável entre a obra física e os espaços circundantes. O presente trabalho tem como objectivo discutir e analisar qual a importância do ecoturismo no panorama arquitectónico cabo-verdiano e se este turismo sustentável será apenas uma ideia teórica, um modelo ideal de actividade ou passível de ser aplicável, de se observar na prática.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Rebuild Iowa Infrastructure and Transportation Task Force is acutely aware of the critical role infrastructure plays in Iowa’s communities, the lives of the residents, and the economic well-being of the state. With encouragement to the Rebuild Iowa Advisory Commission (RIAC) for its consideration of great need for infrastructure and transportation repairs, the Task Force provides its assessment and recommendations. As the RIAC fulfills its obligations to guide the recovery and reconstruction in Iowa, infrastructure and transportation must be recognized for its impact on all Iowans. The tornadoes, storms, and floods were devastating to infrastructure and transportation systems across the state. The damage did not distinguish between privately-owned and public assets. The significance of the damage emerges further with the magnitude of the damage estimates. Infrastructure includes components that some might initially overlook, such as communication systems, landfills, and water treatment. The miles of damaged roads and bridges are more evident to many Iowans. Given the reliance on infrastructure systems, many repairs are already underway, though gaps have emerged in the funding for repairs to certain infrastructure systems.