958 resultados para Electric power factor measurement
Resumo:
Pós-graduação em Engenharia Elétrica - FEIS
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
This paper shows how the detailed examination of active and nonactive power components may produce new information for modern smart meters. For this purpose, a prototype of electronic power meter has been implemented and applied to the evaluation of the Conservative Power Theory (CPT). Considering five sorts of loads, under four different operating conditions, the experimental results indicate that the CPT is able to provide a good methodology for load characterization, which could possibly benefits consumers and power utilities in several different ways. The results also show that depending on the situation, the analysis of nonactive power terms may be more important than the observation of traditional power quality indices, such as total harmonic distortion, unbalance factors or the fundamental positive sequence power factor.
Resumo:
Hybrid system micro-generation integration of PV-wind power is presented by a form of energy in which problems resulting from variability in the intensity of wind and solar intensity are possible mitigation either by complementation between one source to another or the largest stability configured by the generate the system. Based on this context, this work aims to assessing the performance of a hybrid system PV-wind power energy small of a rural property for their electrification. The study has been developed at the Rural Laboratory Powering from Engineering Department of UNESP. In order to present this research, a hybrid system has been installed PV-wind power, composed of one 400Wp windmill and a 300 Wp PV-system. The results obtained allowed us to evaluate the solar and wind energy supplied ranked among 285 and 360 kWh electric power generated by the PV-wind power hybrid system stood between 25,5 and 31 kWh. At is to say achieving yield of approximately than 10% during one year observation period, i.e., it was concluded that the performance of the hybrid system depended essentially the energy received and generated by the PV-system and that there was complementation between generating wind power and PV-systems with regard to time of day and the annual seasons by confirming the technical feasibility of this kind system of micro-generation in small rural properties.
Resumo:
This paper presents the development and the main results for an interleaved boost rectifier operating as a special input power stage for a trolleybus type vehicle, allowing its feeding by alternate current (AC) or direct current (DC) distribution power systems. When feeding with two wires (single phase) alternate current distribution system, the converter accomplish active power factor correction, providing a relatively sinusoidal current with low total harmonic distortion (THD) and fully complying with IEC 61000-3-4 standards. In addition, a management control system promotes the required automatic operation changes for the proposed rectifier when the vehicle is changing from the DC distribution power system to the AC distribution power system and vice-versa, keeping its original electrical DC system characteristics for the adjustable speed driver sub-system. The main experimental results for a prototype rated at 150kW are presented, considering its application for a trolleybus with DC adjustable speed driver, demonstrating the proposed converter benefits and the possibility of AC feeding system for trolleybus type vehicle.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)
Resumo:
Pós-graduação em Agronomia (Energia na Agricultura) - FCA
Resumo:
Pós-graduação em Agronomia (Energia na Agricultura) - FCA
Resumo:
The lack of data records of electric power consumption of smallphotovoltaic home systems, independently of the method used for sizing them, drives to consider the demand as a constant. However, the existing data reveal the variability of the consumption due to the influences of some social, cultural and psychosocial aspects of the human groups. This paper presents records of consumption data obtainedfrom several solar home systems (SHSs) in Brazil and Peru, and it discusses about the Gamma distribution function that can express to a great extent the behaviour of the demand. By this analysis it was verified that `a lot of people consume little and few people consume a lot`. In that sense, a few recommendations for sizing procedures that can be useful in the implantation of extensive programmes of rural electrification by SHSs are presented. Copyright (c) 2007 John Wiley & Sons, Ltd.
Resumo:
A new approach called the Modified Barrier Lagrangian Function (MBLF) to solve the Optimal Reactive Power Flow problem is presented. In this approach, the inequality constraints are treated by the Modified Barrier Function (MBF) method, which has a finite convergence property: i.e. the optimal solution in the MBF method can actually be in the bound of the feasible set. Hence, the inequality constraints can be precisely equal to zero. Another property of the MBF method is that the barrier parameter does not need to be driven to zero to attain the solution. Therefore, the conditioning of the involved Hessian matrix is greatly enhanced. In order to show this, a comparative analysis of the numeric conditioning of the Hessian matrix of the MBLF approach, by the decomposition in singular values, is carried out. The feasibility of the proposed approach is also demonstrated with comparative tests to Interior Point Method (IPM) using various IEEE test systems and two networks derived from Brazilian generation/transmission system. The results show that the MBLF method is computationally more attractive than the IPM in terms of speed, number of iterations and numerical conditioning. (C) 2011 Elsevier B.V. All rights reserved.
Resumo:
In this paper, a new algebraic-graph method for identification of islanding in power system grids is proposed. The proposed method identifies all the possible cases of islanding, due to the loss of a equipment, by means of a factorization of the bus-branch incidence matrix. The main features of this new method include: (i) simple implementation, (ii) high speed, (iii) real-time adaptability, (iv) identification of all islanding cases and (v) identification of the buses that compose each island in case of island formation. The method was successfully tested on large-scale systems such as the reduced south Brazilian system (45 buses/72 branches) and the south-southeast Brazilian system (810 buses/1340 branches). (C) 2011 Elsevier Ltd. All rights reserved.
Resumo:
The aim of solving the Optimal Power Flow problem is to determine the optimal state of an electric power transmission system, that is, the voltage magnitude and phase angles and the tap ratios of the transformers that optimize the performance of a given system, while satisfying its physical and operating constraints. The Optimal Power Flow problem is modeled as a large-scale mixed-discrete nonlinear programming problem. This paper proposes a method for handling the discrete variables of the Optimal Power Flow problem. A penalty function is presented. Due to the inclusion of the penalty function into the objective function, a sequence of nonlinear programming problems with only continuous variables is obtained and the solutions of these problems converge to a solution of the mixed problem. The obtained nonlinear programming problems are solved by a Primal-Dual Logarithmic-Barrier Method. Numerical tests using the IEEE 14, 30, 118 and 300-Bus test systems indicate that the method is efficient. (C) 2012 Elsevier B.V. All rights reserved.
Resumo:
The main objective of this work is to present an efficient method for phasor estimation based on a compact Genetic Algorithm (cGA) implemented in Field Programmable Gate Array (FPGA). To validate the proposed method, an Electrical Power System (EPS) simulated by the Alternative Transients Program (ATP) provides data to be used by the cGA. This data is as close as possible to the actual data provided by the EPS. Real life situations such as islanding, sudden load increase and permanent faults were considered. The implementation aims to take advantage of the inherent parallelism in Genetic Algorithms in a compact and optimized way, making them an attractive option for practical applications in real-time estimations concerning Phasor Measurement Units (PMUs).