Reactive power planning under conditional-value-at-risk assessment using chance-constrained optimisation


Autoria(s): López, Julio; Contreras, Javier; Mantovani, Jose R. S.
Contribuinte(s)

Universidade Estadual Paulista (UNESP)

Data(s)

21/10/2015

21/10/2015

19/02/2015

Resumo

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Processo FAPESP: 2010/16728-5

Processo FAPESP: 2012/21570-7

This study presents a risk-assessment approach to the reactive power planning problem. Chance-constrained programming is used to model the random equivalent availability of existing reactive power sources for a given confidence level. Load shedding because of random equivalent availability of those reactive power sources is implemented through conditional-value-at-risk. Tap settings of under-load tap-changing transformers are considered as integer variables. Active and reactive demands are considered as probability distribution functions. The proposed mathematical formulation is a two-stage stochastic, multi-period mixed-integer convex model. The tradeoff between risk mitigation and investment cost minimisation is analysed. The proposed methodology is applied to the CIGRE-32 electric power system, using the optimisation solver CPLEX in AMPL.

Formato

231-240

Identificador

http://ieeexplore.ieee.org/xpl/articleDetails.jsp?arnumber=7047291

Iet Generation Transmission &distribution. Hertford: Inst Engineering Technology-iet, v. 9, n. 3, p. 231-240, 2015.

1751-8687

http://hdl.handle.net/11449/129519

http://dx.doi.org/10.1049/iet-gtd.2014.0224

WOS:000350148600003

Idioma(s)

eng

Publicador

Inst Engineering Technology-iet

Relação

Iet Generation Transmission &distribution

Direitos

closedAccess

Palavras-Chave #Risk management #Load shedding #Power transformers #Minimisation #Investment #Reactive power planning #Conditional-value-at-risk assessment #Chance-constrained optimisation #Chance-constrained programming #Random equivalent availability #Reactive power sources #Confidence level #Under-load tap-changing transformers #Integer variables #Reactive demands #Probability distribution functions #Mathematical formulation #Two-stage stochastic model #Multiperiod mixed-integer convex model #Risk mitigation #Investment cost minimisation #CIGRE-32 electric power system #Optimisation solver CPLEX #AMPL
Tipo

info:eu-repo/semantics/article