442 resultados para Tribunales


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Contiene: Libro 116: Libro de la administración de desamparados y sentenciados, Cuenta de la administración de sentenciados y desamparados desde 1 de enero de 1759 hasta último de diciembre 1760 y adelante;comprende los registros de las fechas 04-07-1760 12-12-1817, 158 folios; 32 cm. Libro 117: Libro de desamparados y ajusticiados, que principió en el año 1818 y concluyó en 1835; comprende los registros de las fechas 06-01-1818 30-06-1835, 90 folios + 6 hojas de índice; 31 cm. Libro 118: Libro de ajusticiados y desamparados, que principió el 21 de julio del año 1835; comprende los registros de las fechas 21-07-1835 14-01-1863; incluye dos solicitudes de certificaciones y un auto de tribunal eclesiástico de fecha posterior; 118 folios y luego paginado hasta la página 229; 31 cm. Libro 119: Libro de mortuorios de desamparados y ajusticiados. Principia en septiembre de 1862. Concluye 14 de febrero de 1878; comprende los registros de las fechas 01-09-1862 14-02-1878; incluye dos solicitudes de certificados de autos de tribunales eclesiásticos de fecha posterior (1880-1893); 171 folios + 27 hojas de índice alfabético; 33 cm. Libro 120: Libro de defunciones de la Muy Ilustre Archicofradía de Nuestra Señora de los Desamparados. Año 1879; comprende los registros de las fechas 14-05-1879 18-03-1885. 398 páginas (solamente se ha escrito en las primeras 12 páginas); 32 cm, Con posterioridad al día primero de julio de 1880 se encargó nuevamente del entierro de desemparados la Real Cofradía en uso de un derecho y las paretidas de sepelio, inclusa la de Francisco Verdeguer, se encuentran en los libros correspondientes de aquella... (Valencia, 1 de dicembre de 1893). Libro 121: Libro para anotar los nombres y demás circunstancias de los que se entierran en el cementerio del Carraixet...; comprende los registros de las fechas 02-03-1878 09-07-1888. 100 folios; 33 cm. Libro 122: Registro de sepelios en el Cementerio de Carraixet, Libro para anotar los nombres y demás circunstancias de los que se entierran en el cementerio del Carraixet...; comprende los registros de las fechas 12-07-1888 03-10-1925, 150 folios; 32 cm.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Al fin : Es propiedad, y el autor perseguirá ante los tribunales a quien reimprima este romance sin su consentimiento. (Aprobado por la autoridad eclesiástica)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

El presente trabajo se basa en la filosofía de la Construcción sin Pérdidas (“Lean Construction”), analizando la situación de esta filosofía en el sector de la edificación en el contexto internacional y español, respondiendo las siguientes preguntas: 1. ¿Cómo surge el “Lean Construction”? 2. ¿Cuáles son sus actividades, funciones y cometidos? 3. ¿Existe regulación del ¨Lean Construction” en otros países? 4. ¿Existe demanda del ¨Lean Construction” en España? 5. ¿Existe regulación del ¨Lean Construction” en España? 6. ¿Cómo debería ser la regulación ¨Lean Construction” en España? 7. ¿Cuál es la relación del “Lean Construction” con el “Project & Construction Management”? 8. ¿Cómo debería ser la regulación de “Lean Construction” en España considerando su relación con el “Project & Construction Management”? Las preguntas indicadas las hemos respondido detalladamente en el presente trabajo, a continuación se resume las respuestas a dichas preguntas: 1. El “Lean Construction” surge en agosto de 1992, cuando el investigador finlandés Lauri Koskela publicó en la Universidad de Stanford el reporte TECHNICAL REPORT N° 72 titulado “Application of the New Production Philosophy to Construction”. Un año más tarde el Dr. Koskela invitó a un grupo de especialistas en construcción al primer workshop de esta materia en Finlandia, dando origen al International Group for Lean Construction (IGLC) lo que ha permitido extender la filosofía a EEUU, Europa, América, Asia, Oceanía y África. “Lean Construction” es un sistema basado en el enfoque “Lean Production” desarrollado en Japón por Toyota Motors a partir de los años cincuenta, sistema que permitió a sus fábricas producir unidades con mayor eficiencia que las industrias americanas, con menores recursos, en menor tiempo, y con un número menor de errores de fabricación. 2. El sistema “Lean Construction” busca maximizar el valor y disminuir las pérdidas de los proyectos generando una coordinación eficiente entre los involucrados, manejando un proyecto como un sistema de producción, estrechando la colaboración entre los participantes de los proyectos, capacitándoles y empoderándoles, fomentando una cultura de cambio. Su propósito es desarrollar un proceso de construcción en el que no hayan accidentes, ni daños a equipos, instalaciones, entorno y comunidad, que se realice en conformidad con los requerimientos contractuales, sin defectos, en el plazo requerido, respetando los costes presupuestados y con un claro enfoque en la eliminación o reducción de las pérdidas, es decir, las actividades que no generen beneficios. El “Last Planner System”, o “Sistema del Último Planificador”, es un sistema del “Lean Construction” que por su propia naturaleza protege a la planificación y, por ende, ayuda a maximizar el valor y minimizar las pérdidas, optimizando de manera sustancial los sistemas de seguridad y salud. El “Lean Construction” se inició como un concepto enfocado a la ejecución de las obras, posteriormente se aplicó la filosofía a todas las etapas del proyecto. Actualmente considera el desarrollo total de un proyecto, desde que nace la idea hasta la culminación de la obra y puesta en marcha, considerando el ciclo de vida completo del proyecto. Es una filosofía de gestión, metodologías de trabajo y una cultura empresarial orientada a la eficiencia de los procesos y flujos. La filosofía “Lean Construction” se está expandiendo en todo el mundo, además está creciendo en su alcance, influyendo en la gestión contractual de los proyectos. Su primera evolución consistió en la creación del sistema “Lean Project Delivery System”, que es el concepto global de desarrollo de proyectos. Posteriormente, se proponen el “Target Value Design”, que consiste en diseñar de forma colaborativa para alcanzar los costes y el valor requerido, y el “Integrated Project Delivery”, en relación con sistemas de contratos relacionales (colaborativos) integrados, distintos a los contratos convencionales. 3. Se verificó que no existe regulación específica del ¨Lean Construction” en otros países, en otras palabras, no existe el agente con el nombre específico de “Especialista en Lean Construction” o similar, en consecuencia, es un agente adicional en el proyecto de la edificación, cuyas funciones y cometidos se pueden solapar con los del “Project Manager”, “Construction Manager”, “Contract Manager”, “Safety Manager”, entre otros. Sin embargo, se comprobó la existencia de formatos privados de contratos colaborativos de Integrated Project Delivery, los cuales podrían ser tomados como unas primeras referencias para futuras regulaciones. 4. Se verificó que sí existe demanda del ¨Lean Construction” en el desarrollo del presente trabajo, aunque aún su uso es incipiente, cada día existe más interesados en el tema. 5. No existe regulación del ¨Lean Construction” en España. 6. Uno de los objetivos fundamentales de esta tesis es el de regular esta figura cuando actúe en un proyecto, definir y realizar una estructura de Agente de la Edificación, según la Ley de Ordenación de la Edificación (LOE), y de esta manera poder introducirla dentro de la Legislación Española, protegiéndola de eventuales responsabilidades civiles. En España existe jurisprudencia (sentencias de los tribunales de justicia españoles) con jurisdicción civil basada en la LOE para absolver o condenar a agentes de la edificación que son definidos en los tribunales como “gestores constructivos” o similares. Por este motivo, en un futuro los tribunales podrían dictaminar responsabilidades solidarias entre el especialista “Lean Construction” y otros agentes del proyecto, dependiendo de sus actuaciones, y según se implemente el “Lean Project Delivery System”, el “Target Value Design” y el “Integrated Project Delivery”. Por otro lado, es posible que el nivel de actuación del especialista “Lean Construcción” pueda abarcar la gestión del diseño, la gestión de la ejecución material (construcción), la gestión de contratos, o la gestión integral de todo el proyecto de edificación, esto último, en concordancia con la última Norma ISO 21500:2012 o UNE-ISO 21500:2013 Directrices para la dirección y gestión de proyectos. En consecuencia, se debería incorporar adecuadamente a uno o más agentes de la edificación en la LOE de acuerdo a sus funciones y responsabilidades según los niveles de actuación del “Especialista en Lean Construction”. Se propone la creación de los siguientes agentes: Gestor del Diseño, Gestor Constructivo y Gestor de Contratos, cuyas definiciones están desarrolladas en este trabajo. Estas figuras son definidas de manera general, puesto que cualquier “Project Manager” o “DIPE”, gestor BIM (Building Information Modeling), o similar, puede actuar como uno o varios de ellos. También se propone la creación del agente “Gestor de la Construcción sin Pérdidas”, como aquel agente que asume las actuaciones del “gestor de diseño”, “gestor constructivo” y “gestor de contratos” con un enfoque en los principios del Lean Production. 7. En la tesis se demuestra, por medio del uso de la ISO 21500, que ambos sistemas son complementarios, de manera que los proyectos pueden tener ambos enfoques y ser compatibilizados. Un proyecto que use el “Project & Construction Management” puede perfectamente apoyarse en las herramientas y técnicas del “Lean Construction” para asegurar la eliminación o reducción de las pérdidas, es decir, las actividades que no generen valor, diseñando el sistema de producción, el sistema de diseño o el sistema de contratos. 8. Se debería incorporar adecuadamente al agente de la edificación “Especialista en Lean Construction” o similar y al agente ¨Especialista en Project & Construction Management” o DIPE en la Ley de Ordenación de la Edificación (LOE) de acuerdo a sus funciones y responsabilidades, puesto que la jurisprudencia se ha basado para absolver o condenar en la referida Ley. Uno de los objetivos fundamentales de esta tesis es el de regular la figura del “Especialista en Lean Construction” cuando actúa simultáneamente con el DIPE, y realizar una estructura de Agente de la Edificación según la LOE, y de esta manera protegerlo de eventuales responsabilidades solidarias. Esta investigación comprueba que la propuesta de definición del agente de edificación DIPE, según la LOE, presentada en la tesis doctoral del Doctor Manuel Soler Severino es compatible con las nuevas definiciones propuestas. El agente DIPE puede asumir los roles de los diferentes gestores propuestos en esta tesis si es que se especializa en dichas materias, o, si lo estima pertinente, recomendar sus contrataciones. ABSTRACT This work is based on the Lean Construction philosophy; an analysis is made herein with regard to the situation of this philosophy in the building sector within the international and Spanish context, replying to the following questions: 1. How did the concept of Lean Construction emerge? 2. Which are the activities, functions and objectives of Lean Construction? 3. Are there regulations on Lean Construction in other countries? 4. Is there a demand for Lean Construction in Spain? 5. Are there regulations on Lean Construction in Spain? 6. How should regulations on Lean Construction be developed in Spain? 7. What is the relationship between Lean Construction and the Project & Construction Management? 8. How should regulations on Lean Construction be developed in Spain considering its relationship with the Project & Construction Management? We have answered these questions in detail here and the replies are summarized as follows: 1. The concept of Lean Construction emerged in august of 1992, when Finnish researcher Lauri Koskela published in Stanford University TECHNICAL REPORT N° 72 entitled “Application of the New Production Philosophy to Construction”. A year later, Professor Koskela invited a group of construction specialists to Finland to the first workshop conducted on this matter; thus, the International Group for Lean Construction (IGLC) was established, which has contributed to extending the philosophy to the United States, Europe, the Americas, Asia, Oceania, and Africa. Lean Construction is a system based on the Lean Production approach, which was developed in Japan by Toyota Motors in the 1950s. Thanks to this system, the Toyota plants were able to produce more units, with greater efficiency than the American industry, less resources, in less time, and with fewer manufacturing errors. 2. The Lean Construction system aims at maximizing the value of projects while reducing waste, producing an effective coordination among those involved; it manages projects as a production system, enhancing collaboration between the parties that participate in the projects while building their capacities, empowering them, and promoting a culture of change. Its purpose is to develop a construction process free of accidents, without damages to the equipment, facilities, environment and community, flawless, in accordance with contractual requirements, within the terms established, respecting budgeted costs, and with a clear approach to eliminating or reducing waste, that is, activities that do not generate benefits. The Last Planner System is a Lean Construction system, which by its own nature protects planning and, therefore, helps to maximize the value and minimize waste, optimizing substantially the safety and health systems. Lean Construction started as a concept focused on the execution of works, and subsequently the philosophy was applied to all the stages of the project. At present it considers the project’s total development, since the time ideas are born until the completion and start-up of the work, taking into account the entire life cycle of the project. It is a philosophy of management, work methodologies, and entrepreneurial culture aimed at the effectiveness of processes and flows. The Lean Construction philosophy is extending all over the world and its scope is becoming broader, having greater influence on the contractual management of projects. It evolved initially through the creation of the Lean Project Delivery System, a global project development concept. Later on, the Target Value Design was developed, based on collaborative design to achieve the costs and value required, as well as the Integrated Project Delivery, in connection with integrated relational (collaborative) contract systems, as opposed to conventional contracts. 3. It was verified that no specific regulations on Lean Construction exist in other countries, in other words, there are no agents with the specific name of “Lean Construction Specialist” or other similar names; therefore, it is an additional agent in building projects, which functions and objectives can overlap those of the Project Manager, Construction Manager, Contract Manager, or Safety Manager, among others. However, the existence of private collaborative contracts of Integrated Project Delivery was confirmed, which could be considered as first references for future regulations. 4. There is a demand for Lean Construction in the development of this work; even though it is still emerging, there is a growing interest in this topic. 5. There are no regulations on Lean Construction in Spain. 6. One of the main objectives of this thesis is to regulate this role when acting in a project, and to define and develop a Building Agent structure, according to the Building Standards Law (LOE by its acronym in Spanish), in order to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, which are defined in the courts as “construction managers” or similar. For this reason, courts could establish in the future joint and several liabilities between the Lean Construction Specialist and other agents of the project, depending on their actions and based on the implementation of the Lean Project Delivery System, the Target Value Design, and the Integrated Project Delivery. On the other hand, it is possible that the level of action of the Lean Construction Specialist may comprise design management, construction management and contract management, or the integral management of the entire building project in accordance with the last ISO 21500:2012 or UNE-ISO 21500:2013, guidelines for the management of projects. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the Lean Construction Specialist. The creation of the following agents is proposed: Design Manager, Construction Manager, and Contract Manager, which definitions are developed in this work. These agents are defined in general, since any Project Manager or DIPE, Building Information Modeling (BIM) Manager or similar, may act as one or as many of them. The creation of the Lean Construction Manager is also proposed, as the agent that takes on the role of the Design Manager, Construction Manager and Contract Manager with a focus on the Lean Production principles. 7. In the thesis it is demonstrated that through the implementation of the ISO 21500, both systems are supplementary, so projects may have both approaches and be compatible. A project that applies the Project & Construction Management may perfectly have the support of the tools, techniques and practices of Lean Construction to ensure the elimination or reduction of losses, that is, those activities that do not generate value, thus designing the production system, the design system, or the contract system. 8. The Lean Construction Specialist or similar and the Specialist in Project & Construction Management should be incorporated appropriately into the LOE according to their functions and responsibilities, since jurisprudence has been based on such Law to acquit or convict. One of the main objectives of this thesis is the regulate the role of the Lean Construction Specialist when acting simultaneously with the DIPE, and to develop a structure of the building agent, according to the LOE, and in this way protect such agent from joint and several liabilities. This research proves that the proposal to define the DIPE building agent, according to the LOE, and presented in the doctoral dissertation of Manuel Soler Severino, Ph.D. is compatible with the new definitions proposed. The DIPE agent may assume the roles of the different managers proposed in this thesis if he specializes in those topics or, if deemed pertinent, recommends that they be engaged.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

El objetivo de la presente tesis doctoral consiste en realizar un análisis descriptivo de las principales características definitorias de los menores implicados en actos delictivos, analizando variables sociodemográficas, delictivas y clínicas, para determinar el grado en que dichas variables están relacionadas con la reincidencia delictiva general (compuesta por reincidencia y reiteración, no reincidencia y reiteración, reincidencia y no reiteración y no reincidencia y no reiteración), la reincidencia delictiva (caracterizada por reincidencia y reiteración, no reincidencia y reiteración y reincidencia y no reiteración), no reincidencia y la reincidencia violenta. A modo aclaratorio, se define la reincidencia como la presencia de uno o más delitos por lo que un menor está cumpliendo medida en la actualidad, así como medidas judiciales pendientes por hechos delictivos que han ocurrido o bien de forma simultánea o posteriormente al inicio de la medida judicial que cumple al momento de la evaluación. Por otro lado, la reiteración se refiere al historial delictivo previo del menor, estableciéndose en función de la comisión pasada de uno o más delitos por los que el menor ya ha cumplido alguna medida judicial. Además, con la presente tesis doctoral se presenta un modelo de riesgo en función del valor predictivo de cada una de las variables contempladas en el ocio de riesgo del menor, para establecer las líneas de intervención de un Programa de Ocio y Tiempo Libre que se ajuste a la realidad de los menores infractores. Para ello, en primer lugar, en el presente estudio se ha contextualizado el marco legal, realizándose un recorrido histórico desde el primer Código Penal de 1922, los Códigos Penales de 1948 y 1970, así como la Ley Orgánica de Poder Judicial de 1985 por la que los Tribunales Tutelares pasaron a ser Juzgados de Menores, hasta que fue aprobada la Ley Orgánica Reguladora de la competencia y el Procedimiento de los Juzgados de menores en 1992. Así, se analizan las sucesivas reformas de dicha Ley Orgánica, llegando a la conocida L.O.R.P.M. de 5/2000, siendo su principio fundamental actuar por el superior interés del menor, derivándose de un modelo mixto, de naturaleza formalmente penal, pero materialmente sancionadora educativa, volviendo a ser reformada por la Ley Orgánica 8/2006, que implicó el endurecimiento del tratamiento penal de menores...

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Este trabajo de investigación tiene como objetivo principal el de analizar cómo y con qué elementos se integró un sistema político regional después de la primera gran revolución del siglo XX, de la Revolución mexicana, la que sucedió seis años antes que la Revolución rusa. Se muestra un análisis sobre el campo de la política, se hace desde la perspectiva del ejercicio de la política y del poder; son situados los actores individuales y colectivos que emergieron y constituyeron una nueva clase política regional, la que tuvo el reto de constituir un nuevo sistema político nacional que se complementaba con un nuevo régimen político nacional, el posrevolucionario. En este escenario, es importante revisar cómo se impulsó la organización y desarrollo de las elecciones y qué instituciones fueron establecidas durante el período, en las cuales se asentó el sistema político en el estado federado de Zacatecas. Consideramos los impactos inmediatos, los posibles estancamientos y la evolución en los individuos y las acciones políticas. El estudio es sobre Zacatecas, una de las regiones federativas que desde el siglo XIX es parte de los Estados Unidos Mexicanos. Su territorio está delimitado por la legislación interna y por la emitida por el Congreso nacional. En tal área existen instituciones que ejercen autoridad sobre la zona que señala la legislación. Los individuos a los que se prestó atención son los que fungieron como gobernador, diputados al Congreso local y magistrados de los tribunales estatales. Son examinados los sujetos que laboraron en las instituciones que tenían autoridad en el territorio estatal. Estas precisiones espaciales son las que confirman que se atiende una región que interactúa en un Estado nacional...

Relevância:

10.00% 10.00%

Publicador:

Resumo:

La Inquisición española siempre ha sido un tema atractivo y polémico como pocos en la Historia de España. La bibliografía existente sobre ella es ingente, al igual que variados son los enfoques con los que investigadores y curiosos se han acercado a ella. Son muchos los temas sobre su historia abordados por los historiadores, tendiendo en ciertos casos a la repetición y la sobresaturación en algunos de ellos. Las víctimas, la tortura, el procedimiento..., son conceptos recurrentes, mientras que otros, también fundamentales para el conocimiento de la institución, han permanecido ignorados sin que se sepa muy bien la razón. Varias de estas cuestiones tienen que ver con el funcionamiento interno de los tribunales de distrito y, más en concreto, con su gestión administrativa. La presente tesis, que se adscribe a una nueva corriente de investigación, la Diplomática inquisitorial, tratará de paliar, en la medida de lo posible, ese vacío historiográfico. El primer objetivo será, por tanto, dar a conocer los principales documentos escriturados en los tribunales de distrito del Santo Oficio durante el desarrollo de sus funciones, lo que se traducirá en un amplio espectro temático. El siguiente gran objetivo no será otro que el de tratar de profundizar en la figura de los secretarios de estos tribunales. Para ello se expondrán sus categorías, funciones, formas de acceder al oficio, remuneraciones, etc. Se intentará trazar un perfil lo más completo posible de ellos en tanto que responsables de buena parte de la gestión administrativa del tribunal. Habiendo estudiado la documentación y a quienes la confeccionaban, será necesario también analizar la importancia de los archivos inquisitoriales en la mencionada gestión, de manera que se indagará acerca de su historia, funciones, organización...

Relevância:

10.00% 10.00%

Publicador:

Resumo:

El presente trabajo trata de poner de manifiesto el riesgo, para jueces y tribunales, de valorar de forma acrí-tica los informes periciales psicológicos referidos a la valoración del daño psíquico en supuestos de abuso sexual infantil (ASI). Desde la revisión bibliográfica realizada se han detectado serias limitaciones para detectar ASI en la utilización de indicadores clínicos que han surgido del contexto sanitario y asistencial. Se cuestiona el m delo teórico subyacente y la rigurosidad de los estudios sobre las consecuencias psicológicas asociadas al ASI. Igualmente, son debatidos algunos métodos de exploración clínica, extrapolados al contexto forense, y desaconsejados debido a su baja fiabilidad y validez. Se concluye señalando lo inadecuado de trasladar modelos y procedimientos del contexto clínico-asistencial al pericial, y la necesidad de exigir requisitos técnicos a los informes forenses.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Existen conductas empresariales de muy diversa naturaleza que pueden dar lugar a la transgresión del derecho de huelga. En estos casos se hace necesario reparar los daños que tales conductas provocan, tanto en el plano individual (trabajador) como en el plano colectivo (sindicatos u órganos de representación unitaria), teniendo en cuenta que la indemnización que derive de ello debe cumplir una función ejemplarizante, además de la propiamente reparadora. En el presente estudio, siguiendo los criterios que han ido sentando nuestros Tribunales, se identifican distintas conductas empresariales susceptibles de conculcar el derecho de huelga, a la par que se analizan todas y cada una de las partidas que debieran estar presentes a la hora de calcular el monto indemnizatorio, así como los criterios de valoración a tener en cuenta en estos casos.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Has supplement: Sección de Jurisprudencia, contiene ejecutorias notables de tribunales federales ó locales, y de casación pronunciadas por la Primera sala del Tribunal Superior de Justicia del Distrito Federal.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Tít. de los vols. 7, 8 y 9: Supplément a l'essai sur l'histoire générale des tribunaux des peuples tant anciens que modernes...

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Portada con grabado calcográfico.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mode of access: Internet.