870 resultados para Power system security
Resumo:
The evolution of wireless sensor network technology has enabled us to develop advanced systems for real time monitoring. In the present scenario wireless sensor networks are increasingly being used for precision agriculture. The advantages of using wireless sensor networks in agriculture are distributed data collection and monitoring, monitor and control of climate, irrigation and nutrient supply. Hence decreasing the cost of production and increasing the efficiency of production. This paper describes the security issues related to wireless sensor networks and suggests some techniques for achieving system security. This paper also discusses a protocol that can be adopted for increasing the security of the transmitted data
Resumo:
Unit Commitment Problem (UCP) in power system refers to the problem of determining the on/ off status of generating units that minimize the operating cost during a given time horizon. Since various system and generation constraints are to be satisfied while finding the optimum schedule, UCP turns to be a constrained optimization problem in power system scheduling. Numerical solutions developed are limited for small systems and heuristic methodologies find difficulty in handling stochastic cost functions associated with practical systems. This paper models Unit Commitment as a multi stage decision making task and an efficient Reinforcement Learning solution is formulated considering minimum up time /down time constraints. The correctness and efficiency of the developed solutions are verified for standard test systems
Resumo:
Die wachsende Weltbevölkerung bedingt einen höheren Energiebedarf, dies jedoch unter der Beachtung der nachhaltigen Entwicklung. Die derzeitige zentrale Versorgung mit elektrischer Energie wird durch wenige Erzeugungsanlagen auf der Basis von fossilen Primärenergieträgern und Kernenergie bestimmt, die die räumlich verteilten Verbraucher zuverlässig und wirtschaftlich über ein strukturiertes Versorgungssystem beliefert. In den Elektrizitätsversorgungsnetzen sind keine nennenswerten Speicherkapazitäten vorhanden, deshalb muss die von den Verbrauchern angeforderte Energie resp. Leistung jederzeit von den Kraftwerken gedeckt werden. Bedingt durch die Liberalisierung der Energiemärkte und die geforderte Verringerung der Energieabhängigkeit Luxemburgs, unterliegt die Versorgung einem Wandel hin zu mehr Energieeffizienz und erhöhter Nutzung der dargebotsabhängigen Energiequellen. Die Speicherung der aus der Windkraft erzeugten elektrischen Energie, wird in den Hochleistungs-Bleiakkumulatoren, errichtet im ländlichen Raum in der Nähe der Windkraftwerke, eingespeichert. Die zeitversetzte Einspeisung dieser gespeicherten elektrischen Energie in Form von veredelter elektrischer Leistung während den Lastspitzen in das 20 kV-Versorgungsnetz der CEGEDEL stellt die Innovation in der luxemburgischen Elektrizitätsversorgung dar. Die Betrachtungen beschränken sich somit auf die regionale, relativ kleinräumige Einbindung der Windkraft in die elektrische Energieversorgung des Großherzogtums Luxemburg. Die Integration der Windkraft im Regionalbereich wird in den Vordergrund der Untersuchung gerückt. Überregionale Ausgleichseffekte durch Hochspannungsleitungen der 230/400 kV-Systeme werden außer Acht gelassen. Durch die verbrauchernahe Bereitstellung von elektrischer Spitzenleistung vermindern sich ebenfalls die Übertragungskosten aus den entfernten Spitzenlastkraftwerken, der Ausbau von Kraftwerkskapazitäten kann in die Zukunft verschoben werden. Die Emission von Treibhausgasen in thermischen Kraftwerken wird zum Teil reduziert. Die Berechnungen der Wirtschaftlichkeit von Hybridanlagen, zusammengesetzt aus den Windkraftwerken und den Hochleistungs-Bleiakkumulatoren bringen weitere Informationen zum Einsatz dieser dezentralen Speichern, als Partner der nachhaltigen Energieversorgung im ländlichen Raum. Die untersuchte Einspeisung von erneuerbarer Spitzenleistung lässt sich auch in die Entwicklungsländer übertragen, welche nicht über zentrale Kraftwerkskapazitäten und Verteilungsnetze verfügen.
Resumo:
El tema del narcotráfico ha sido ampliamente tratado, así como el caso de las drogas en Colombia, pero la afectación de dicho problema no ha sido analizada desde la República Dominicana y mucho menos desde la relación bilateral entre esta y Colombia. Aunque el tema es de gran relevancia en la agenda internacional, así como en la agenda interna de cada uno de estos Estados, no es el tema principal en la relación bilateral, donde los asuntos comerciales tienen mayor importancia, aún cuando hay ciertos mecanismos que buscan eliminar el tráfico ilegal de estupefacientes. En esta investigación, se busca dar un diagnóstico de las relaciones bilaterales y de aquellos instrumentos existentes, específicamente aquellos implementados desde la acogida internacional del término responsabilidad compartida en el año 1998 hasta el año 2010, para determinar la efectividad de los mismos y de aquellos factores que no son precisamente resultantes de las relaciones bilaterales pero que sí afectan de una u otra manera el tráfico de drogas ilegales entre estos dos países. Así, se buscará encontrar las debilidades, en los instrumentos bilaterales entre Colombia y República Dominicana y hacer recomendaciones para hacerlos más efectivos.
Resumo:
Amenazas como Siria, Irán y el PKK fueron relevantes al momento de forjar una alianza entre Turquía e Israel a mediados de los noventa. Con la firma de varios acuerdos en el ámbito militar se fortaleció la relación bilateral en materia de seguridad. Sin embargo, la llegada de un nuevo gobierno a Turquía en 2002 generó un cambio en materia de política exterior, especialmente con Israel. La monografía sustentada bajo los postulados de la Teoría del Balance de las Amenazas concluye que la ruptura de la alianza se dio por el cambio en la política exterior de seguridad turca, el bloqueo a Gaza por parte de Israel en 2008 y el ataque a la Flotilla de Gaza en 2010, conduciendo a una transformación en los acuerdos militares pactados para la seguridad y estabilidad de ambos países en la región de Medio Oriente.
Resumo:
Los procesos de formación de profesionales de salud idóneos en el mundo, complementan su conocimiento entre dos componentes fundamentales, un componente teórico y el otro componente práctico. La formación que recibe en las aulas y la realización de las prácticas académicas a las cuales pueda acceder, le permite al estudiante trasformar el conocimiento académico adquirido en conocimiento cercano a la realidad y con fundamento profesional, razón por la cual las Instituciones Educativas tienen la responsabilidad de formar profesionales que sean capaces de desempeñarse en componentes sociales, administrativos y prácticos. Dentro de las ventajas que aporta la realización de las prácticas en la formación de los profesionales en salud se reconocen: la posibilidad de tener una visión de la responsabilidad del trabajo a la cual se van a ver enfrentados, desarrollar habilidades de interrelaciones sociales, incrementar su nivel de madurez, desarrollar e implementar estrategias de supervisión y así lograr el reconocimiento personal del nivel de confianza en su desempeño. Sin embargo también se puede convertir en un aspecto negativo si la práctica no se desarrolla de manera adecuada y si no logra tener una integración exitosa con el conocimiento teórico. Para el caso de la formación de talento humano en salud, el espacio utilizado para la realización de estas prácticas son las Instituciones Prestadoras de Servicios de Salud, deben ser lugares que les faciliten a los estudiantes encontrar una relación integral entre la formación teórica y su aplicación a la práctica profesional, de esta manera el estudiante podrá incrementar su preparación específica. Las prácticas académicas tienen interés en la formación de profesionales y representan un período donde el estudiante se convierte en sujeto entre la Institución Educativa y la Institución Prestadora. Es un espacio de inducción que le permite al estudiante realizar una evaluación de sí mismo y a la vez puede evaluar el entorno donde se va a desarrollar en su colectivo profesional. El objetivo de esta investigación es desarrollar una herramienta técnica que le permita a la Dirección facilitar la supervisión, el monitoreo y la evaluación de convenios de Docencia-Servicio en las Instituciones Prestadoras de Servicios de Salud, garantizando el respeto a los derechos de los usuarios, la calidad de los servicios prestados, la seguridad del paciente y la humanización de la atención, aspectos que no pueden ser afectados negativamente por el desarrollo de las prácticas académicas. Todas las actividades asistenciales que sean desarrolladas por estudiantes en la realización de su práctica profesional, deben ser realizadas bajo una estricta supervisión de docentes y de personal especializado responsable de la prestación del servicio, dando cumplimiento con el Sistema de Garantía de la Calidad del Sistema de Seguridad en Salud en Colombia.
Resumo:
Wind generation’s contribution to meeting extreme peaks in electricity demand is a key concern for the integration of wind power. In Great Britain (GB), robustly assessing this contribution directly from power system data (i.e. metered wind-supply and electricity demand) is difficult as extreme peaks occur infrequently (by definition) and measurement records are both short and inhomogeneous. Atmospheric circulation-typing combined with meteorological reanalysis data is proposed as a means to address some of these difficulties, motivated by a case study of the extreme peak demand events in January 2010. A preliminary investigation of the physical and statistical properties of these circulation types suggests that they can be used to identify the conditions that are most likely to be associated with extreme peak demand events. Three broad cases are highlighted as requiring further investigation. The high-over-Britain anticyclone is found to be generally associated with very low winds but relatively moderate temperatures (and therefore moderate peak demands, somewhat in contrast to the classic low-wind cold snap that is sometimes apparent in the literature). In contrast, both longitudinally extended blocking over Scotland/Scandinavia and latitudinally extended troughs over western Europe appear to be more closely linked to the very cold GB temperatures (usually associated with extreme peak demands). In both of these latter situations, wind resource averaged across GB appears to be more moderate.
Resumo:
Almost all the electricity currently produced in the UK is generated as part of a centralised power system designed around large fossil fuel or nuclear power stations. This power system is robust and reliable but the efficiency of power generation is low, resulting in large quantities of waste heat. The principal aim of this paper is to investigate an alternative concept: the energy production by small scale generators in close proximity to the energy users, integrated into microgrids. Microgrids—de-centralised electricity generation combined with on-site production of heat—bear the promise of substantial environmental benefits, brought about by a higher energy efficiency and by facilitating the integration of renewable sources such as photovoltaic arrays or wind turbines. By virtue of good match between generation and load, microgrids have a low impact on the electricity network, despite a potentially significant level of generation by intermittent energy sources. The paper discusses the technical and economic issues associated with this novel concept, giving an overview of the generator technologies, the current regulatory framework in the UK, and the barriers that have to be overcome if microgrids are to make a major contribution to the UK energy supply. The focus of this study is a microgrid of domestic users powered by small Combined Heat and Power generators and photovoltaics. Focusing on the energy balance between the generation and load, it is found that the optimum combination of the generators in the microgrid- consisting of around 1.4 kWp PV array per household and 45% household ownership of micro-CHP generators- will maintain energy balance on a yearly basis if supplemented by energy storage of 2.7 kWh per household. We find that there is no fundamental technological reason why microgrids cannot contribute an appreciable part of the UK energy demand. Indeed, an estimate of cost indicates that the microgrids considered in this study would supply electricity at a cost comparable with the present electricity supply if the current support mechanisms for photovoltaics were maintained. Combining photovoltaics and micro-CHP and a small battery requirement gives a microgrid that is independent of the national electricity network. In the short term, this has particular benefits for remote communities but more wide-ranging possibilities open up in the medium to long term. Microgrids could meet the need to replace current generation nuclear and coal fired power stations, greatly reducing the demand on the transmission and distribution network.
Resumo:
he perspective European Supergrid would consist of an integrated power system network, where electricity demands from one country could be met by generation from another country. This paper makes use of a bi-linear fixed-effects model to analyse the determinants for trading electricity across borders among 34 countries connected by the European Supergrid. The key question that this paper aims to address is the extent to which the privatisation of European electricity markets has brought about higher cross-border trade of electricity. The analysis makes use of distance, price ratios, gate closure times, size of peaks and aggregate demand as standard determinants. Controlling for other standard determinants, it is concluded that privatisation in most cases led to higher power exchange and that the benefits are more significant where privatisation measures have been in place for a longer period.
Resumo:
Wind generation's contribution to supporting peak electricity demand is one of the key questions in wind integration studies. Differently from conventional units, the available outputs of different wind farms cannot be approximated as being statistically independent, and hence near-zero wind output is possible across an entire power system. This paper will review the risk model structures currently used to assess wind's capacity value, along with discussion of the resulting data requirements. A central theme is the benefits from performing statistical estimation of the joint distribution for demand and available wind capacity, focusing attention on uncertainties due to limited histories of wind and demand data; examination of Great Britain data from the last 25 years shows that the data requirements are greater than generally thought. A discussion is therefore presented into how analysis of the types of weather system which have historically driven extreme electricity demands can help to deliver robust insights into wind's contribution to supporting demand, even in the face of such data limitations. The role of the form of the probability distribution for available conventional capacity in driving wind capacity credit results is also discussed.
Resumo:
We consider the two-level network design problem with intermediate facilities. This problem consists of designing a minimum cost network respecting some requirements, usually described in terms of the network topology or in terms of a desired flow of commodities between source and destination vertices. Each selected link must receive one of two types of edge facilities and the connection of different edge facilities requires a costly and capacitated vertex facility. We propose a hybrid decomposition approach which heuristically obtains tentative solutions for the vertex facilities number and location and use these solutions to limit the computational burden of a branch-and-cut algorithm. We test our method on instances of the power system secondary distribution network design problem. The results show that the method is efficient both in terms of solution quality and computational times. (C) 2010 Elsevier Ltd. All rights reserved.
Resumo:
This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.This report describes the outcome of the first visit to Tanzania, within the project "Mini-grids supplied by renewable energy - improving technical and social feasibility". The trip included visits to three different organizations; Ihushi Development Center (IDC) near Mwanza, TIDESO near Bukoba, and Mavuno Project in Karagwe. At IDC, a brief evaluation of the current power system was done and measuring equipment for long term measurements were installed. At all three locations investigations regarding the current and future electricity demand were conducted and connections to people relevant to the study were established. The report is including as well some technical specifications as some observations regarding organization and management of the technical systems. The trip was including only short visits and therefore only brief introductions to the different organizations, based on observations done by the author. The report is hence describing the author’s understanding of the technical system and social structures after only short visits to each of the organizations, and may differ from observations done at another point in time, over a different time period, or by some other person.
Resumo:
A presente dissertação tem como objetivo estudar e aprimorar métodos de projetos de controladores para sistemas de potência, sendo que esse trabalho trata da estabilidade dinâmica de sistemas de potência e, portanto, do projeto de controladores amortecedores de oscilações eletromecânicas para esses sistemas. A escolha dos métodos aqui estudados foi orientada pelos requisitos que um estabilizador de sistemas de potência (ESP) deve ter, que são robustez, descentralização e coordenação. Sendo que alguns deles tiveram suas características aprimoradas para atender a esses requisitos. A abordagem dos métodos estudados foi restringida à análise no domínio tempo, pois a abordagem temporal facilita a modelagem das incertezas paramétricas, para atender ao requisito da robustez, e também permite a formulação do controle descentralizado de maneira simples. Além disso, a abordagem temporal permite a formulação do problema de projeto utilizando desigualdades matriciais lineares (LMI’s), as quais possuem como vantagem o fato do conjunto solução ser sempre convexo e a existência de algoritmos eficientes para o cálculo de sua solução. De fato, existem diversos pacotes computacionais desenvolvidos no mercado para o cálculo da solução de um problema de inequações matriciais lineares. Por esse motivo, os métodos de projeto para controladores de saída buscam sempre colocar o problema na forma de LMI’s, tendo em vista que ela garante a obtenção de solução, caso essa solução exista.