857 resultados para Central Valley Project (Calif.)


Relevância:

30.00% 30.00%

Publicador:

Resumo:

It is worthwhile to understand farming strategies of smallholder farmers in sub-Saharan Africa, especially those of farmers who are in transition from traditional to alternative agriculture in terms of adoption of innovative technologies. In a case study of inland valleys in central Nigeria, we investigated the farming strategy of Nupe farmers who have a long-term tradition of wet rice cultivation and indigenous methods of land preparation for soil, water and weed management. In this region, a new method of land preparation has recently been introduced along with a recommendation to use improved seeds and chemical fertilizers. Our findings reveal that Nupe farmers directly sow traditional seeds and apply a marginal amount of fertilizer to paddy plots prepared by labor-saving methods on drought-prone hydromorphic valley fringes and flood-susceptible valley bottoms, whereas they preferentially transplanted improved seedlings and applied a relatively large quantity of fertilizer to paddy fields prepared by a labor-intensive and mechanized method on a valley position where they can access to optimum water condition (less risky against the drought and flood).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

1999 Seismic Hazard In Guatemala 2001 Post-Event Mision 2006 Resis Ii Project Norad 2007 Workshop Seismic Hazard 2010 Book Amenaza Sísmica En América Central 2011 Cooperation Haití, República Dominicana, Puerto Rico

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El objetivo del presente proyecto consiste en analizar la viabilidad de un campo de E&P (Exploración y Producción) de hidrocarburos situado en Gabón en función de diferentes regímenes fiscales con el fin de estudiar el reparto de la renta entre el gobierno y la compañía petrolífera. Tras estudiar los parámetros técnicos del proyecto y confirmar su viabilidad desde un punto de vista puramente técnico, en la segunda parte del estudio se analiza para un mismo campo el impacto que tiene la variación de una serie de parámetros que dependen únicamente del tipo de contrato acordado entre el gobierno y la compañía petrolífera. Existen principalmente dos tipos de contratos que los gobiernos de los países productores aplican a las compañías extranjeras que pretenden operar en ellos. Mediante el estudio realizado se pone de manifiesto que las decisiones estratégicas en proyectos de E&P de hidrocarburos están íntimamente sujetas a condiciones fiscales. La decisión de firmar un tipo de contrato u otro puede ser determinante para la rentabilidad o no de este tipo de proyectos. ABSTRACT The main goal of this project is to analyze the feasibility of a E&P project located in Gabon according to different tax regimes in order to study the profits distribution between the government and the oil company. After studying the technical parameters and confirm its viability from a technical point of view, in the second part of the study were analyzed for the same field the impact of the variation of some parameters that only depends on the type of contract agreed between the government and the oil company. There are mainly two types of contracts that governments of producing countries apply to foreign companies seeking to operate in them. Through the study it appears that strategic decisions in E&P projects are closely hydrocarbon tax policies apply.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El objetivo de este proyecto es realizar la simulación de una central térmica supercrítica de 700 MW con captura de CO₂ para producir electricidad y verterla a la red. El proyecto describe los equipos e instalaciones de la central y define los balances técnicos de la misma, probando que es viable técnicamente la incorporación de una planta de captura de CO₂ a una central térmica, a pesar del bajo rendimiento de la central. Además incluye el estudio económico que indica la viabilidad económica del proyecto, aunque con una rentabilidad baja. Este proyecto mira hacia el futuro debido a la necesidad de reducir las emisiones contaminantes, ya de casi la misma importancia que generar electricidad, y demuestra que es posible generar una energía limpia en centrales de carbón. ABSTRACT The purpose of this project is to carry out the simulation of a 700 MW supercritical coal thermal power plant with CO₂ capture to produce electricity and send it to the grid. The project describes the equipment, the installations and defines technical balances of the power plant. It shows that a CO₂ capture plant in a coal power plant is technically possible, in spite of the low power plant efficiency. In addition, it includes the economic analysis that shows the economic viability of the project, with a low profitability. This project looks into the future due to the need of reducing the pollutant emissions, which are almost as important as the generation of electricity, and demonstrates that a green energy in coal power plants is possible.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The use of Project Based Learning has spread widely over the last decades, not only throughout countries but also among disciplines. One of the most significant characteristics of this methodology is the use of ill-structured problems as central activity during the course, which represents an important difficulty for both teachers and students. This work presents a model, supported by a tool, focused on helping teachers and students in Project Based Learning, overcoming these difficulties. Firstly, teachers are guided in designing the project following the main principles of this methodology. Once the project has been specified at the desired level of depth, the same tool helps students to finish the project specification and organize the implementation. Collaborative work among different users is allowed in both phases. This tool has been satisfactorily tested designing two real projects used in Computer Engineering and Software Engineering degrees.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El presente proyecto trata el diseño del sostenimiento y revestimiento del túnel de aducción de la Central hidroeléctrica Renace III. Se ha diseñado un sostenimiento con el fin de cumplir de forma óptima los requisitos funcionales , estructurales y económicos, garantizando de forma primordial la seguridad y durabilidad de la construcción. A partir del conocimiento geológico-geotécnico del macizo encajante se definen mediante clasificaciones geomecánicas divisiones del terreno en función de su calidad. Para cada una de ellas se ha definido una sección tipo de sostenimiento estableciendo sus respectivas especificaciones. A la justificación del cumplimiento de los requisitos se llega mediante distintos métodos empíricos y de cálculo, operando de la misma forma a la hora de decidir el revestimiento. Por último se ha definido la impermeabilización y el plan de auscultación con el fin de garantizar la seguridad y estanqueidad del túnel. ABSTRACT The aim of this project is to design the support and lining of the adduction tunnel in Renace III Hydroelectric Plant. The support has been defined to optimize functional structural and economical demands guaranteeing the tunnel´s safety and durability. Starting with an exhaustive knowledge of the rock mass, divisions of the quality ground by using geomechanical classifications shall be done. Special support for each division has been defined through several empirical and mathematical methods, using the same process to define the lining. Finally, a waterproofing and an auscultation plan has been designed in order to provide sealing and protection

Relevância:

30.00% 30.00%

Publicador:

Resumo:

En el campo de la fusión nuclear y desarrollándose en paralelo a ITER (International Thermonuclear Experimental Reactor), el proyecto IFMIF (International Fusion Material Irradiation Facility) se enmarca dentro de las actividades complementarias encaminadas a solucionar las barreras tecnológicas que aún plantea la fusión. En concreto IFMIF es una instalación de irradiación cuya misión es caracterizar materiales resistentes a condiciones extremas como las esperadas en los futuros reactores de fusión como DEMO (DEMOnstration power plant). Consiste de dos aceleradores de deuterones que proporcionan un haz de 125 mA y 40 MeV cada uno, que al colisionar con un blanco de litio producen un flujo neutrónico intenso (1017 neutrones/s) con un espectro similar al de los neutrones de fusión [1], [2]. Dicho flujo neutrónico es empleado para irradiar los diferentes materiales candidatos a ser empleados en reactores de fusión, y las muestras son posteriormente examinadas en la llamada instalación de post-irradiación. Como primer paso en tan ambicioso proyecto, una fase de validación y diseño llamada IFMIFEVEDA (Engineering Validation and Engineering Design Activities) se encuentra actualmente en desarrollo. Una de las actividades contempladas en esta fase es la construcción y operación de una acelarador prototipo llamado LIPAc (Linear IFMIF Prototype Accelerator). Se trata de un acelerador de deuterones de alta intensidad idéntico a la parte de baja energía de los aceleradores de IFMIF. Los componentes del LIPAc, que será instalado en Japón, son suministrados por diferentes países europeos. El acelerador proporcionará un haz continuo de deuterones de 9 MeV con una potencia de 1.125 MW que tras ser caracterizado con diversos instrumentos deberá pararse de forma segura. Para ello se requiere un sistema denominado bloque de parada (Beam Dump en inglés) que absorba la energía del haz y la transfiera a un sumidero de calor. España tiene el compromiso de suministrar este componente y CIEMAT (Centro de Investigaciones Energéticas Medioambientales y Tecnológicas) es responsable de dicha tarea. La pieza central del bloque de parada, donde se para el haz de iones, es un cono de cobre con un ángulo de 3.5o, 2.5 m de longitud y 5 mm de espesor. Dicha pieza está refrigerada por agua que fluye en su superficie externa por el canal que se forma entre el cono de cobre y otra pieza concéntrica con éste. Este es el marco en que se desarrolla la presente tesis, cuyo objeto es el diseño del sistema de refrigeración del bloque de parada del LIPAc. El diseño se ha realizado utilizando un modelo simplificado unidimensional. Se han obtenido los parámetros del agua (presión, caudal, pérdida de carga) y la geometría requerida en el canal de refrigeración (anchura, rugosidad) para garantizar la correcta refrigeración del bloque de parada. Se ha comprobado que el diseño permite variaciones del haz respecto a la situación nominal siendo el flujo crítico calorífico al menos 2 veces superior al nominal. Se han realizado asimismo simulaciones fluidodinámicas 3D con ANSYS-CFX en aquellas zonas del canal de refrigeración que lo requieren. El bloque de parada se activará como consecuencia de la interacción del haz de partículas lo que impide cualquier cambio o reparación una vez comenzada la operación del acelerador. Por ello el diseño ha de ser muy robusto y todas las hipótesis utilizadas en la realización de éste deben ser cuidadosamente comprobadas. Gran parte del esfuerzo de la tesis se centra en la estimación del coeficiente de transferencia de calor que es determinante en los resultados obtenidos, y que se emplea además como condición de contorno en los cálculos mecánicos. Para ello por un lado se han buscado correlaciones cuyo rango de aplicabilidad sea adecuado para las condiciones del bloque de parada (canal anular, diferencias de temperatura agua-pared de decenas de grados). En un segundo paso se han comparado los coeficientes de película obtenidos a partir de la correlación seleccionada (Petukhov-Gnielinski) con los que se deducen de simulaciones fluidodinámicas, obteniendo resultados satisfactorios. Por último se ha realizado una validación experimental utilizando un prototipo y un circuito hidráulico que proporciona un flujo de agua con los parámetros requeridos en el bloque de parada. Tras varios intentos y mejoras en el experimento se han obtenido los coeficientes de película para distintos caudales y potencias de calentamiento. Teniendo en cuenta la incertidumbre de las medidas, los valores experimentales concuerdan razonablemente bien (en el rango de 15%) con los deducidos de las correlaciones. Por motivos radiológicos es necesario controlar la calidad del agua de refrigeración y minimizar la corrosión del cobre. Tras un estudio bibliográfico se identificaron los parámetros del agua más adecuados (conductividad, pH y concentración de oxígeno disuelto). Como parte de la tesis se ha realizado asimismo un estudio de la corrosión del circuito de refrigeración del bloque de parada con el doble fin de determinar si puede poner en riesgo la integridad del componente, y de obtener una estimación de la velocidad de corrosión para dimensionar el sistema de purificación del agua. Se ha utilizado el código TRACT (TRansport and ACTivation code) adaptándalo al caso del bloque de parada, para lo cual se trabajó con el responsable (Panos Karditsas) del código en Culham (UKAEA). Los resultados confirman que la corrosión del cobre en las condiciones seleccionadas no supone un problema. La Tesis se encuentra estructurada de la siguiente manera: En el primer capítulo se realiza una introducción de los proyectos IFMIF y LIPAc dentro de los cuales se enmarca esta Tesis. Además se describe el bloque de parada, siendo el diseño del sistema de rerigeración de éste el principal objetivo de la Tesis. En el segundo y tercer capítulo se realiza un resumen de la base teórica así como de las diferentes herramientas empleadas en el diseño del sistema de refrigeración. El capítulo cuarto presenta los resultados del relativos al sistema de refrigeración. Tanto los obtenidos del estudio unidimensional, como los obtenidos de las simulaciones fluidodinámicas 3D mediante el empleo del código ANSYS-CFX. En el quinto capítulo se presentan los resultados referentes al análisis de corrosión del circuito de refrigeración del bloque de parada. El capítulo seis se centra en la descripción del montaje experimental para la obtención de los valores de pérdida de carga y coeficiente de transferencia del calor. Asimismo se presentan los resultados obtenidos en dichos experimentos. Finalmente encontramos un capítulo de apéndices en el que se describen una serie de experimentos llevados a cabo como pasos intermedios en la obtención del resultado experimental del coeficiente de película. También se presenta el código informático empleado para el análisis unidimensional del sistema de refrigeración del bloque de parada llamado CHICA (Cooling and Heating Interaction and Corrosion Analysis). ABSTRACT In the nuclear fusion field running in parallel to ITER (International Thermonuclear Experimental Reactor) as one of the complementary activities headed towards solving the technological barriers, IFMIF (International Fusion Material Irradiation Facility) project aims to provide an irradiation facility to qualify advanced materials resistant to extreme conditions like the ones expected in future fusion reactors like DEMO (DEMOnstration Power Plant). IFMIF consists of two constant wave deuteron accelerators delivering a 125 mA and 40 MeV beam each that will collide on a lithium target producing an intense neutron fluence (1017 neutrons/s) with a similar spectra to that of fusion neutrons [1], [2]. This neutron flux is employed to irradiate the different material candidates to be employed in the future fusion reactors, and the samples examined after irradiation at the so called post-irradiative facilities. As a first step in such an ambitious project, an engineering validation and engineering design activity phase called IFMIF-EVEDA (Engineering Validation and Engineering Design Activities) is presently going on. One of the activities consists on the construction and operation of an accelerator prototype named LIPAc (Linear IFMIF Prototype Accelerator). It is a high intensity deuteron accelerator identical to the low energy part of the IFMIF accelerators. The LIPAc components, which will be installed in Japan, are delivered by different european countries. The accelerator supplies a 9 MeV constant wave beam of deuterons with a power of 1.125 MW, which after being characterized by different instruments has to be stopped safely. For such task a beam dump to absorb the beam energy and take it to a heat sink is needed. Spain has the compromise of delivering such device and CIEMAT (Centro de Investigaciones Energéticas Medioambientales y Tecnológicas) is responsible for such task. The central piece of the beam dump, where the ion beam is stopped, is a copper cone with an angle of 3.5o, 2.5 m long and 5 mm width. This part is cooled by water flowing on its external surface through the channel formed between the copper cone and a concentric piece with the latter. The thesis is developed in this realm, and its objective is designing the LIPAc beam dump cooling system. The design has been performed employing a simplified one dimensional model. The water parameters (pressure, flow, pressure loss) and the required annular channel geometry (width, rugoisty) have been obtained guaranteeing the correct cooling of the beam dump. It has been checked that the cooling design allows variations of the the beam with respect to the nominal position, being the CHF (Critical Heat Flux) at least twice times higher than the nominal deposited heat flux. 3D fluid dynamic simulations employing ANSYS-CFX code in the beam dump cooling channel sections which require a more thorough study have also been performed. The beam dump will activateasaconsequenceofthe deuteron beam interaction, making impossible any change or maintenance task once the accelerator operation has started. Hence the design has to be very robust and all the hypotheses employed in the design mustbecarefully checked. Most of the work in the thesis is concentrated in estimating the heat transfer coefficient which is decisive in the obtained results, and is also employed as boundary condition in the mechanical analysis. For such task, correlations which applicability range is the adequate for the beam dump conditions (annular channel, water-surface temperature differences of tens of degrees) have been compiled. In a second step the heat transfer coefficients obtained from the selected correlation (Petukhov- Gnielinski) have been compared with the ones deduced from the 3D fluid dynamic simulations, obtaining satisfactory results. Finally an experimental validation has been performed employing a prototype and a hydraulic circuit that supplies a flow with the requested parameters in the beam dump. After several tries and improvements in the experiment, the heat transfer coefficients for different flows and heating powers have been obtained. Considering the uncertainty in the measurements the experimental values agree reasonably well (in the order of 15%) with the ones obtained from the correlations. Due to radiological reasons the quality of the cooling water must be controlled, hence minimizing the copper corrosion. After performing a bibligraphic study the most adequate water parameters were identified (conductivity, pH and dissolved oxygen concentration). As part of this thesis a corrosion study of the beam dump cooling circuit has been performed with the double aim of determining if corrosion can pose a risk for the copper beam dump , and obtaining an estimation of the corrosion velocitytodimension the water purification system. TRACT code(TRansport and ACTivation) has been employed for such study adapting the code for the beam dump case. For such study a collaboration with the code responsible (Panos Karditsas) at Culham (UKAEA) was established. The work developed in this thesis has supposed the publication of three articles in JCR journals (”Journal of Nuclear Materials” y ”Fusion Engineering and Design”), as well as presentations in more than four conferences and relevant meetings.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El proyecto que se presenta a continuación recoge la adaptación de una Central Térmica de carbón al cumplimiento de la DIRECTIVA 2010/75/UE DEL PARLAMENTO EUROPEO Y DEL CONSEJO de 24 de noviembre de 2010 sobre las emisiones industriales. La Central sobre la que se realiza el proyecto tiene un grupo térmico de carbón suscritico refrigerado por agua, con una potencia a plena carga de 350 MWe y de 190 MWe a mínimo técnico. Genera 1 090 t/h de vapor a 540 °C y 168 kg/cm2 funcionando a plena carga. Actualmente las emisiones de NOx son de 650 mg/m3, (condiciones normales, seco, 6 % O2). El objeto del proyecto es reducir estas emisiones a un valor máximo de 200 mg/m3 en las mismas condiciones. El proyecto analiza detalladamente las condiciones actuales de operación de la instalación en cuanto a combustible utilizado, horas de funcionamiento, condiciones climáticas y producción. Se analiza así mismo, todas las técnicas disponibles en mercado para la reducción del NOx, diferenciando entre medidas primarias (actúan sobre los efectos de formación) y secundarias (limpieza de gases). Las medidas primarias ya están implementadas en la central, por tanto, el proyecto plantea la reducción con medidas secundarias. De las medidas secundarias analizadas se ha seleccionado la instalación de un Reactor de Reducción Selectiva Catalítica (Reactor SCR). Tras un análisis de los diferentes reactores y catalizadores disponibles se ha seleccionado un reactor de configuración High-dust, una disposición de catalizador en 3 capas más 1, cuyos componentes están basados en óxidos metálicos (TiO2, V2O5, WO3) y estructura laminar. Se ha buscado la instalación del reactor para operar a una temperatura inferior a 450 °C. Como agente reductor se ha seleccionado NH3 a una dilución del 24,5 %. El proyecto recoge también el diseño de todo el sistema de almacenamiento, evaporación, dilución e inyección de amoniaco. El resultado del proyecto garantiza una concentración en los gases de salida por la chimenea inferior 180 mg/m3(n) de NOx. La reducción del NOx a los límites establecidos, tienen un coste por MWh neto generado para la central, trabajando 60 % a plena carga y 40 % a mínimo técnico y una amortización de 10 años, de 4,10 €/MWh. ABSTRACT The following project shows the compliance adjustment of a coal-fired power station to the 2010/75/EU Directive of the European Parliament and Council 24th November 2010 on industrial emissions. The project is based on a power station with a subcritical thermal coal unit, cooled with water, with a maximum power of 350 MWe and a technical minimum of 190 MWe. It produces 1 090 t/h of steam at 540 ° C and 168 kg/cm2 operating under full load. Currently, NOx emissions are 650 mg / m3 (normal conditions, dry, 6% O2). The project aims to reduce these emissions to a maximum value of 200 mg / m3 under the same conditions. The project analyses in detail the current operating conditions of the system in terms of fuel used, hours of operation, climatic conditions and production. In addition, it also analyses every available technique of NOx reduction on the market, distinguishing between primary (acting on the effects of formation) and secondary measures (gas cleaning). Primary measures are already implemented in the plant, thus proposing reduction with secondary measures. Among the secondary measures analyzed, it has been selected to install a Selective Catalytic Reduction Reactor (SCR Reactor). Having researched the different reactors and catalysts available, for the reactor has been selected High-dust configuration, an arrangement of catalyst in 3 layers plus 1, whose components are based on metal oxides (TiO2, V2O5, WO3) and laminar structure. The reactor has been sought facility to operate at a temperature below 450 ° C. NH3 diluted to 24,5 % has been selected as reducing agent. The project also includes the design of the entire storage system, evaporation, dilution and ammonia injection. The results of the project ensure a gas concentration in the lower chimney exit below 180 mg / m3(n) NOx. The reduction of NOx to the established limits has a cost per net MWh generated in the plant, working at 60% of full load and at 40% of technical minimum, with an amortization of 10 years, 4,10 € / MWh.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El proyecto tiene como objeto analizar desde el punto de vista técnico-económico las posibilidades para mejorar el factor de potencia en los consumos auxiliares de la Central térmica Litoral, perteneciente a Endesa Generación. Debido a un cambio normativo, las tarifas de acceso a las redes de transporte y distribución de energía eléctrica aplicarán ahora también a los consumos propios de las empresas productoras de electricidad dentro del ámbito de aplicación de las tarifas de acceso. Como la energía reactiva se facturará en función del factor de potencia se propone para su compensación la instalación de bancos de condensadores para mejorar el mismo y disminuir la penalización. Para el dimensionamiento de los bancos se han utilizado los consumos horarios de los años 2012 y 2013 de tres fronteras: grupos 1 y 2 de 400 kV y los transformadores auxiliares de arranque (OTAAs) de 6 kV , teniendo en cuenta las peculiaridades de una Central de Generación, ya que sólo serán objeto de estudio (a efecto de penalizaciones) las horas en las que el grupo está parado o arrancando. El resultado final muestra la diferencia en cuanto a los periodos de amortización de una instalación con generación y sin generación, siendo esta última más rentable económicamente. ABSTRACT The goal of this project is to analyse the possibilities to better the power factor in the auxiliary consumption of the Thermal Plant Litoral from an economic and technical viewpoint. Due to a normative changes, the access price rates for the transportation and distribution of electrical energy, will also apply now to the electricity productive companies own consumption within the scope of the access rate. Since reactive power is invoiced based on the potency factor, we propose the installation of capacitor banks to improve the aforementioned power factor as compensation so as to reduce sanctions. We have used the time profiles from 2012 and 2013 to dimension the banks, using 3 borders: Group 1 and 2 (400 kV) and the auxiliary starter transformers (OTAA's) of 6kV, taking into account the special characteristics of a Generation Plant , since we will only study the hours that the group was shut down or powering up (since these are what the penalties cover). The final result shows the difference in regards to repayment periods for both generating and nongenerating installation, being the aforesaid the most economically worthwile of the two

Relevância:

30.00% 30.00%

Publicador:

Resumo:

El objetivo de este proyecto se centra en la definición, diseño y cálculo de las principales instalaciones eléctricas de la isla de generación, típicas de una central de ciclo combinado en configuración mono-eje. Se procederá a la definición de la arquitectura del sistema de distribución eléctrica de la planta definiendo los equipos eléctricos necesarios para la alimentación y protección de los servicios auxiliares de la isla de potencia y estableciendo una filosofía basada en la optimización del dimensionamiento de los distintos componentes del sistema. El diseño de los componentes eléctricos de la planta se hará en base a los más estrictos estándares internacionales con los que se garantiza el cumplimiento de las condiciones de seguridad, tanto de las personas como la de los propios equipos, fiabilidad y funcionalidad. El siguiente paso consistirá en adaptar los equipos definidos a los existentes en el mercado y así, evitar los sobrecostes que conlleva la adquisición de equipos no estandarizados en el mercado. Abstract The main objective of the project is the definition, analysis and sizing of the main components of the electrical system of a combined cycle power plant. This includes generation, auxiliary services and emergency systems. The design is intended to meet the International Electrotechnical Commission´s standards. These will ensure the adequate and safe operation, taking into account all operation conditions of the plant and the mechanical calculation of the thermal balance by the sizing of main mechanical equipment. An acceptable level of safety and health of workers and equipment is a mandatory requirement. The final results obtained are equipment that are able to achieve the highest level of protection for workers, assets and environment.