965 resultados para Colby College Museum of Art


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Compiled by P. Zilcken.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Thesis (Master's)--University of Washington, 2016-06

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this research and thesis was to develop a program and project in the context of the Historic Art Deco District in Miami Beach. This project intended to analyze the chronological history of the urban development of the Art Deco District, its geographical, political and socio-cultural conditions as well as the evolution and different architectonic typologies of the area. In order to understand the issues involved in design in a historic context, this research addressed and analyzed several architectonic interventions within various historic places. This research concluded with the design of a public facility located at Ocean Drive, Miami Beach, consisting of a Museum of Urban Development and Headquarters for the Planning/Preservation Department of the City of Miami Beach. The project proposal and thesis, addresses architectonic and theoretical issues specific to design in an historic area.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This exhibition was a research presentation of works made at Center for Land Use Interpretation [CLUI]base in Wendover, Utah, USA between 2008-2010. The project was commissioned by the Centre For Land Interpretation in USA and funded by The Henry Moore Foundation in the UK. Documentation of research conducted in the field as made available as video and installation. An experimental discourse on the preservation of land art was put with GPS drawings and research information displayed as maps and documents. In examining physical sites in Utah, USA, the project connected to contemporary discourse centred on archives in relation to land art and land use. Using experimental processes conceived in relation to key concepts such as event structures and entropy, conceptual frameworks developed by Robert Smithson (USA) and John Latham (UK), the 'death drive' of the archive was examined in the context of a cultural impulse to preserve iconic works. The work took items from Lathams archive and placed them at the canonical 'Spiral Jetty', Smithson land art work at Rozel Point north of Salt Lake City. This became a focus for the project that also highlighted the role of the Getty Foundation in documenting major public artworks and CLUI in creating an American Land Museum. Work was created in the field at extreme remote locations using GPS technologies and visual tools were developed to articulate the concepts of the artists discussed, to engage the exhibition audience in ideas of transformation and entropy in art. Audiences were encouraged to sign a petition to be used in future preservation of spiral jetty currently facing development challenges.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Project alliancing is a new alternative to traditional project delivery systems, especially in the commercial building sector. The Collaborative Process is a theoretical model of people and systems characteristics that are required to reduce the adversarial nature of most construction projects. Although developed separately, both are responses to the same pressures. Project alliancing was just used successfully to complete the National Museum of Australia. This project was analyzed as a case study to determine the extent to which it could be classified as a “collaborative project”. Five key elements of The Collaborative Process were reviewed and numerous examples from the management of this project were cited that support the theoretical recommendations of this model. In the case of this project, significant added value was delivered to the client and many innovations resulted from the collective work of the parties to the contract. It was concluded that project alliances for commercial buildings offer many advantages over traditional project delivery systems, which are related to increasing the levels of collaboration among a project management team.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Effective use of information and communication technologies (ICT) is necessary for delivering efficiency and improved project delivery in the construction industry. Convincing clients or contracting organisations to embrace ICT is a difficult task, there are few templates of an ICT business model for the industry to use. ICT application in the construction industry is relatively low compared to automotive and aerospace industries. The National Museum of Australia project provides a unique opportunity for investigating and reporting on this deficiency in publicly available knowledge. Concentrates on the business model content and objectives, briefly indicates the evaluation framework that was used to evaluate ICT effectiveness.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This exhibition catalogue essay discusses the work of artists in the Basil Sellars Art prize at the Ian Potter Gallery in Melbourne. It considers sport's theatre within parameters such as theatre itself; rules and recursive elements; creases in the cultural fold; transformances; and the performers themselves. The artists' articulation of these themes is discussed in detail.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry demands priority from all governments because it impacts economically and socially on all citizens. A number of recent studies have identified inefficiencies in the Australian construction industry by modelling the building process. A culture of reform supported by industry and government is now emerging in the industry – one in which alternate forms of project delivery are being trialed. The Australian Building and Construction Industry Action Agenda brought together industry and government to identify actions necessary to lift Australia’s innovative and knowledge creating capacity at the sector level. A central activity under this Action Agenda was dissemination of information relating to industry best practice initiatives in innovation, project delivery and the use of information technology. Government and industry identified project alliance contracting and more advanced information technology as means to increase efficiency in construction as part of a new innovative procurement environment.