970 resultados para archive


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The following types of experiments for a proposed Space Station Microgravity Particle Research Facility are described: (1) nucleation of refractory vapors at low pressure/high temperature; (2) coagulation of refractory grains; (3) optical properties of refractory grains; (4) mantle growth on refractory cores; (5) coagulation of core-mantle grains; (6) optical properties of core-mantle grains; (7) lightning strokes in the primitive solar nebula; and (8) separation of dust from a grain/gas mixture that interacts with a meter-sized planetesimal to determine if accretion occurs. The required capabilities and desired hardware for the facility are detailed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In Hare v Mount Isa City Council [2009] QDC 39 McGill DCJ examined the scope of s 27(1) of the Personal Injuries Proceedings Act 2002 (Qld) and its interpretation by the Court of Appeal in Haug v Jupiters Ltd [2008] 1 Qd R 276. The judge expressed a number of concerns about the Act and the Regulation made under it, that are worthy of consideration by the Legislature.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In BHP Coal Pty Ltd v K Orenstein & Koppel AG (No 2) [2009] QSC 64 McMurdo J considered the circumstances in which the ordinary rule under r 681 of the Uniform Civil Procedure Rules 1999 (Qld) (UCPR) that costs should follow the event should be departed from in favour of a party who was unsuccessful overall, but who succeeded on particular questions. When the court is satisfied that a departure from the usual order under r 681 of the UCPR is justified, it appears increasingly willing to exercise the power in r 684(2) to declare what percentage of costs was applicable to a particular issue

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In Hill v Robertson Suspension Systems Pty Ltd [2009] QDC 165 McGill DCJ considered the procedural requirements for the service of originating process on a company, and for proving that service for the purpose of obtaining default judgment.The judge’s views adopt a strict and technical construction of the requirements for an affidavit of service under r 120(1)(b). Though clearly obiter, they may well affect the approach taken on applications to enter or set aside default judgments in the lower courts. Pending further judicial consideration of the issue, it is suggested the prudent course is to ensure that the deponent of an affidavit for service effected under s 109X(1)(a) of the Act deposes not only to the location of the registered office of the company but also, at a minimum, provides the source of that information.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In Hogan v Ellery [2009] QDC 154 McGill DCJ considered two applications for leave to deliver interrogatories under r 229 of the Uniform Civil Procedure Rules 1999 (Qld) (UCPR). The judgment provides useful analysis of the circumstances in which a plaintiff may obtain leave to deliver interrogatories to a defendant in defamation proceedings, and also to a non-party before action.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The decision of Applegarth J in Heartwood Architectural & Joinery Pty Ltd v Redchip Lawyers [2009] QSC 195 (27 July 2009) involved a costs order against solicitors personally. This decision is but one of several recent decisions in which the court has been persuaded that the circumstances justified costs orders against legal practitioners on the indemnity basis. These decisions serve as a reminder to practitioners of their disclosure obligations when seeking any interlocutory relief in an ex parte application. These obligations are now clearly set out in r 14.4 of the Legal Profession (Solicitors) Rule 2007 and r 25 of 2007 Barristers Rule. Inexperience or ignorance will not excuse breaches of the duties owed to the court.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The recent decision of the Court of Appeal in AGL Sales (Qld) Pty Ltd v Dawson Sales Pty Ltd [2009] QCA 262 provides clear direction on the Court’s expectations of a party seeking leave to appeal a costs order.This decision is likely to impact upon common practice in relation to appeals against costs orders. It sends a clear message to trial judges that they should not give leave as of course when giving a judgment in relation to costs, and that parties seeking leave under s 253 of the Supreme Court Act 1995 (Qld) should make a separate application. The application should be supported by material presenting an arguable case that the trial judge made an error in the exercise of the discretion of the kind described in House v King (1936) 55 CLR 499. A different, and interesting, aspect of this appeal is that it was the first wholly electronic civil appeal. The court-provided technology had been adopted at trial, and the Court of Appeal dispensed with any requirement for hard copy appeal record books.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The trial in Covecorp Constructions Pty Ltd v Indigo Projects Pty Ltd (File no BS 10157 of 2001; BS 2763 of 2002) commenced on 8 October 2007 before Fryberg J, but the matter settled on 6 November 2007 before the conclusion of the trial. This case was conducted as an “electronic trial” with the use of technology developed within the court. This was the first case in Queensland to employ this technology at trial level. The Court’s aim was to find a means to capture the key benefits which are offered by the more sophisticated trial presentation software of commercial service providers, in a way that was inexpensive for the parties and would facilitate the adoption of technology at trial much more broadly than has been the case to date.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In Syddall v National Mutual Life Association of Australasia Limited [2008] QSC 101 Daubney J ordered the action be tried without a jury. His judgment considered the circumstances in which a trial involves any technical, scientific or other issue that can not be “conveniently” considered and resolved by a jury as provided in r 474 of the Uniform Civil Procedure Rules 1999 (Qld)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The decision in ACN 070 037 599 Pty Ltd v Larvik Pty Ltd (No 2) [2008] QSC 118 involved a consideration of the implications for a plaintiff whose offer to settle under Part 5 of the Uniform Civil Procedure Rules 1999 (Qld) was made jointly with another plaintiff who abandoned her action before trial. The court found nothing wrong with the making of a joint offer. It concluded the successful plaintiff would be entitled to indemnity costs on the simple test of whether the judgment for that plaintiff was more favourable than the offer.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The judgment of Daubney J in Magnamain Investments Pty Ltd v Baker Johnson Lawyers [2008] QSC 245 provides guidance on a number of aspects concerning the scope and maintenance of a solicitor’s retaining lien for costs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Abstract An assessment of the molecular structure of carletonite a rare phyllosilicate mineral with general chemical formula given as KNa4Ca4Si8O18(CO3)4(OH,F)·H2O has been undertaken using vibrational spectroscopy. Carletonite has a complex layered structure. Within one period of c, it contains a silicate layer of composition NaKSi8O18·H2O, a carbonate layer of composition NaCO3·0.5H2O and two carbonate layers of composition NaCa2CO3(F,OH)0.5. Raman bands are observed at 1066, 1075 and 1086 cm−1. Whether these bands are due to the CO32- ν1 symmetric stretching mode or to an SiO stretching vibration is open to question. Multiple bands are observed in the 300–800 cm−1 spectral region, making the attribution of these bands difficult. Multiple water stretching and bending modes are observed showing that there is much variation in hydrogen bonding between water and the silicate and carbonate surfaces.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

With the growth in project management as a form of work organisation in many sectors of the economy has come the significant rise in the number of project managers and project team members. This change in work organisation brings issues in forging career paths and determining career support in work situations that are often dynamic, short lived and intense. In the relatively small but substantially robust Australian economy, a unique labour market and the tyranny of distance bring their own difficulties. Innovative and collaborative project structures and increasing prevalence of contract work provide both challenges and opportunities for new career pathways in many industries. A growing percentage of Australia's workforce is employed in project-based or project-oriented organisations, leading to the claim that Australia is a project-based economy. This provided a context for our research into the career paths and the issues of career management for project managers working in a project based economy. Using in-depth interviews with project managers from three industry areas we found generational and gender differences in experiences of work, workplace support and mentoring for career development. For a continued strong performance in this economy,organisations that employ project personnel will need to consider how they will ensure the supply of high quality project professionals into the future.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Unlike most normal construction projects, post-disaster housing projects are diverse in nature, have unique socio-cultural and economical requirements, and are extremely dynamic and thus necessitate a meaningful and dynamic response. Post-disaster reconstruction practices that lack a strategy compatible with the severity of disaster, community culture, socio-economic requirements, environmental condition, government legislations, and technical and technological situations, often fail to operate and respond effectively to the needs of the wider affected population. Factors that frequently pose real threats to the eventual success of reconstruction projects are rarely given appropriate consideration when designing such projects. Research into past reconstruction practices has shown that ignoring these factors altogether or failing to give them meaningful consideration can affect housing reconstruction projects. In other words, they either miss their targets altogether or undergo serious modifications after their occupancy, subsequently resulting in an overall loss of project resources. This article touches upon the common factors that negatively impact the outcome of such projects.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

We applied a texture-based flow visualisation technique to a numerical hydrodynamic model of the Pumicestone Passage in southeast Queensland, Australia. The quality of the visualisations using our flow visualisation tool, are compared with animations generated using more traditional drogue release plot and velocity contour and vector techniques. The texture-based method is found to be far more effective in visualising advective flow within the model domain. In some instances, it also makes it easier for the researcher to identify specific hydrodynamic features within the complex flow regimes of this shallow tidal barrier estuary as compared with the direct and geometric based methods.