896 resultados para Infrastructure and Construction Projects
Resumo:
The purpose of this thesis is to find development areas for site operations in power plant construction projects delivered by Wärtsilä. The inspected operations are subcontractor management, site material management and work scheduling. The contractor's role in EPC project is to respond for engineering, procurement, and construction supervision. Geographical and cultural differences brings challenges for finding development areas as Wärtsilä delivers projects world-wide. Searching for development area is mainly made with survey, which answers were collected from the target company's site personnel. Based on the results, with good planning and preparation various problems would be avoided. An external view for the thesis was collected by an expert interview, which was held to three expe-rienced construction operating executives. Interviewees believed that with the se-lection of right site personnel and clearly defined areas of responsibility will great-ly affect the outcome of the project. Some of the theory has been collected from areas, which have helped to under-stand the inspected operations on site. Improving competence knowledge has been important due to the broad scope of work and the author’s inexperience of the topic. Also generally effective practices from construction projects has been col-lected to the theory part. Functionality of general practices have been reflected together with the results of empirically collected data for Wärtsilä's projects. As a result, a model was generated where development proposals and the benefits from new procedures were presented.
Resumo:
Software quality has become an important research subject, not only in the Information and Communication Technology spheres, but also in other industries at large where software is applied. Software quality is not a happenstance; it is defined, planned and created into the software product throughout the Software Development Life Cycle. The research objective of this study is to investigate the roles of human and organizational factors that influence software quality construction. The study employs the Straussian grounded theory. The empirical data has been collected from 13 software companies, and the data includes 40 interviews. The results of the study suggest that tools, infrastructure and other resources have a positive impact on software quality, but human factors involved in the software development processes will determine the quality of the products developed. On the other hand, methods of development were found to bring little effect on software quality. The research suggests that software quality is an information-intensive process whereby organizational structures, mode of operation, and information flow within the company variably affect software quality. The results also suggest that software development managers influence the productivity of developers and the quality of the software products. Several challenges of software testing that affect software quality are also brought to light. The findings of this research are expected to benefit the academic community and software practitioners by providing an insight into the issues pertaining to software quality construction undertakings.
Resumo:
The main objective of this PhD research study is to provide a perspective on the urban growth management and sustainable development in Palestine, and more specifically in Hebron district as a case study. Hebron is located 36 km south of Jerusalem, with an overall population size of around 600,000 people living in a total area around1246km2. Hebron is the biggest Palestinian district that has 16 municipalities and 154 localities. The research discusses and analyzes the urban planning system, economical and environmental policies and the solution required to manage and integrate the development elements to develop a sustainable development plan for Hebron. The research provides answers for fundamental questions such as what kind and definition of sustainable development are applicable to the Palestinian case?. What are the sustainability problems there and how the Israeli occupation and unstable political condition affect the sustainable development in Palestine? What are the urban growth management and sustainability policies and actions required from government, public and privets sector in Palestine? The fast urban growth in Palestine is facing many problems and challenges due to the increase in the population size and the resulting impact of this increase including, but not limited to, the demand of new houses, need for more infrastructure services, demands on new industrial, commercial, educational and health projects, which in turn reduces the area of agricultural lands and threatens the natural resources and environment. There are also other associated sustainability problems like the absence of effective plans or regulations that control urban expansion, the absence of sufficient sustainable development plans at the national levels for the district, new job requirements, Israeli restrictions and occupation for more than 60 years, existence of construction factories near residential areas, poor public awareness and poor governmental funds for service projects and development plans. The study consists of nine chapters. Chapter One includes an introduction, study objectives, problems and justifications, while Chapter Two has a theoretical background on sustainability topic and definitions of sustainability. The Palestinian urban planning laws and local government systems are discussed in Chapter Three and the methodology of research is detailed in Chapter Four. As for Chapter Five, it provides a general background on Hebron District including demographical and economical profiles, along with recommendations related to sustainable development for each profile Chapter Six addresses the urban environment, sustainability priorities and policies required. Chapter Seven discusses and analyzes infrastructure services including transportation, water and wastewater. As for Chapter Eight, it addresses the land use, housing and urban expansion beside the cultural heritage, natural heritage with relevant sustainable development polices and recommendations. Finally, Chapter Nine includes a conclusion and comprehensive recommendations integrating all of urban and sustainability event in one map. Hebron has a deep history including a rich cultural heritage aged by thousands of years, with 47% of Hebron district population under 14 years old. Being the biggest Palestinian district, Hebron has thousands of industrial and economical organizations beside a large agricultural sector at Palestine level. This gives Hebron a potential to play major roles in developing a national sustainability plan, as the current urban planning system in Palestine needs urgent reform and development to fulfill the sustainability requirement. The municipalities and ministers should find permanent financial aid for urban planning and development studies so as to face future challenges. The Palestinian government can benefit from available local human resources in development projects; hence Palestinian people have sufficient qualifications in most sectors. The Palestinian people also can invest in the privet sector in Palestine in case businessmen have been encouraged and clear investment laws and plans have been developed. The study provides recommendations associated to the sustainable development in Palestine in general and Hebron, as a case study, in specific. Recommendations include increasing the privet sector as well as the public involvement in urban growth management, and stopping unplanned urban expansion, subjecting granting building permits of new projects to the no-harm environmental impact assessment, increasing the coordination and cooperation between localities and central bodies, protection and renovation of old cites and green areas, increasing the quality and quantity of infrastructure services, establishing district urban planning department to coordinate and organize urban planning and sustainable development activities. Also, among recommendations come dividing Hebron into three planning and administrative areas (north, central and south), and dividing the sustainable development and implementation period (2010 to 2025) into three main phases. Finally, the study strongly recommends benefiting from the same urban development plans in similar districts at national and international levels, also to use new technologies and information systems in urban planning process.
Resumo:
There is a clear need for financial protection in the construction industry, both to guarantee satisfactory completion of construction projects and to guard against non-payment. However, the cost of financial protection is often felt to be disproportionately high, with unnecessary overlap between different measures. The Reading Construction Forum has commissioned and steered research which is published in this report in an effort to bring the problem out into the open and to clarify the various options open to the various parties and stakeholders in the construction process. "Financial Protection in the UK Building Industry" is the first definitive report on the subject, offering an accurate and simple guide that all levels within the construction industry can understand. This accessible new guide considers the problem of financial protection and clearly lays out the alternative solutions.It looks by turn at the client, the main contractor, and the sub-contractor, discussing which financial protection options are available to each of them, and considers the pros and cons of each option. The cost of each type of financial protection is weighed against the amount of protection provided and the risks involved. The book concludes with guidance for consultants, emphasising relevant points to consider when advising clients and contractors about which type of financial protection to choose. "Financial Protection in the UK Building Industry" was researched by a literature search, collection of statistical data, and financial data, as well as discussions with clients, contractors, sub-contractors and consultants. This investigation has shown that the direct costs of implementing financial protection measures are marginal, and that wider adoption of payment protection would create a more equitable situation between contracting parties.This guide will enable anyone in the construction industry to consider all the options, and determine what is the best solution for them. "Reading Construction Forum Financial Protection for the UK Building Industry" was complied by the University of Reading, funded by the Reading Construction Forum. The Forum has recently commissioned and steered a number of high-profile reports covering important aspects of the construction industry. Members of the Forum include major companies which are concerned with achieving high quality in the design, construction and use of commercial, retail and industrial buildings. All are committed to change and innovation in the British and European construction industries.
Resumo:
The cost of tendering in the construction industry is widely suspected to be excessive, but there is little robust empirical evidence to demonstrate this. It also seems that innovative working practices may reduce the costs of undertaking construction projects and the consequent improvement in relationships should increase overall value for money. The aim of this proposed research project is to develop mechanisms for measuring the true costs of tendering based upon extensive in-house data collection undertaken in a range of different construction firms. The output from this research will enable all participants in the construction process to make better decisions about how to select members of the team and identify the price and scope of their obligations.
Resumo:
There is a lack of knowledge base in relation to experiences gained and lessons learnt from previously executed National Health Service (NHS) infrastructure projects in the UK. This is in part a feature of one-off construction projects, which typify healthcare infrastructure, and in part due to the absence of a suitable method for conveying such information. The complexity of infrastructure delivery process in the NHS makes the construction of healthcare buildings a formidable task. This is particularly the case for the NHS trusts who have little or no experience of construction projects. To facilitate understanding a most important aspect of the delivery process, which is the preparation of a capital investment proposal; steps taken in developing the business case for an NHS healthcare facility are examined. The context for such examination is provided by the planning process of a healthcare project, studied retrospectively. The process is analysed using a social science based method called ‘building stories’, developed at the University of California-Berkeley. By applying this method, stories or narratives are constructed around the data captured on the case study. The findings indicate that the business case process may be used to justify, rather than identify, trusts’ requirements. The study is useful for UK public sector clients as well as consultants and professionals who aim to participate in the delivery of healthcare infrastructure projects in the UK.
Resumo:
The coordination of work and expertise in construction projects is often treated in terms of models or formal rules. However, much is to be gained, if we are to understand it, by examining actual coordination practices. The objective in this article is to address practices of coordination of expertise in the context of design team meetings. The focus is specifically on conversational practices between the structural engineer and the landscape architect part of the design team in a healthcare infrastructure project. The central argument is that the coordination of expertise relied on and was organised by mundane and everyday methods, and not by formal and abstract ones. This argument is drawn from ethnomethodology, a form of sociological analysis that focuses on the situated methods by which activities are produced, but shares concerns found in the literature on actual project management practices. The ethnomethodological stance, however, offers a different perspective on the significance of the empirical reality of projects and a possibility to incorporate within this literature a concern with the ordinary methodical organisation of project activities.
Resumo:
With the increase in e-commerce and the digitisation of design data and information,the construction sector has become reliant upon IT infrastructure and systems. The design and production process is more complex, more interconnected, and reliant upon greater information mobility, with seamless exchange of data and information in real time. Construction small and medium-sized enterprises (CSMEs), in particular,the speciality contractors, can effectively utilise cost-effective collaboration-enabling technologies, such as cloud computing, to help in the effective transfer of information and data to improve productivity. The system dynamics (SD) approach offers a perspective and tools to enable a better understanding of the dynamics of complex systems. This research focuses upon system dynamics methodology as a modelling and analysis tool in order to understand and identify the key drivers in the absorption of cloud computing for CSMEs. The aim of this paper is to determine how the use of system dynamics (SD) can improve the management of information flow through collaborative technologies leading to improved productivity. The data supporting the use of system dynamics was obtained through a pilot study consisting of questionnaires and interviews from five CSMEs in the UK house-building sector.
Resumo:
The use of bamboo as construction and raw material for producing products can be considered a feasible alternative to the abusive use of steel, concrete and oil byproducts. Its use can also reduce the pressure on the use of wood from native and planted forests. Although there are thousands of bamboo species spread about the world and Brazil itself has hundreds of native species, the use and basic knowledge of its characteristics and applications are still little known and little disseminated. This paper's main objective is to introduce the species, the management phases, the physical and mechanical characteristics and the experiences in using bamboo in design and civil construction as per the Bamboo Project implemented at UNESP, Bauru campus since 1994. The results are divided into: a) Field activities - description of the technological species of interest, production chain flows, types of preservative treatments and clump management practices for the development, adaptation and production of different species of culms; b) Lab experiments - physical and mechanical characterization of culms processed as laminated strips and as composite material (glue laminated bamboo – glubam); c) Uses in projects - experiences with natural bamboo and glubam in design, architecture and civil construction projects. In the final remarks, the study aims to demonstrate, through practical and laboratory results, the material's multi-functionality and the feasibility in using bamboo as a sustainable material.
Resumo:
The use of mineral wool is becoming more widespread due to increased acoustic and thermal demands of Spanish Technical Building Code. This increase affects both in rehabilitation and new construction projects. Therefore, waste generation of this type of insulating material is having more importance. The main objective of this research is to study the possibility of recycling fiber obtained from mineral wool of the C&DW as an alternative material to chopped glass fibers that are currently used as reinforcing elements in the prefabricated plaster. To achieve this objective, series are made of plaster E-35 additived with rock wool residue and glass wool residue at different rates of addition. These series are repeated by changing the additive by E fiberglass (length of 25mm) to make a comparative analysis with respect to the series additived with mineral wool waste. All the series are subjected to the test to determine Shore C surface hardness and mechanical testing to determine the compressive and flexural strength. From the results it can be concluded that: with rock wool residue, increases Shore C hardness up to 15% with respect to the glass fiber and 9% with respect to the glass wool, with a percentage of addition 2%. With rock wool residue, weight is decreased by 5% with respect to the glass fiber and 4% with respect to the glass wool waste, with an addition percentage of 4%. For an addition rate of 4%, results in the flexural strength test with fiberglass are 85% higher than those obtained with glass wool residue. However, for a percentage of 1% addition, the results obtained with glass wool residue are 35% higher than those obtained with fiberglass. For an addition rate of 3% results in the compressive strength test with fiberglass are 54% lower than those obtained with rock wool waste and 70% lower than those obtained with glass wool waste. Comparing the two mineral wools, it can be concluded that up to 3% of the addition, the glass wool series results obtained are 10% higher than those additived with rock wool. However, higher percentages of addition show that the results obtained with rock wool are 35% higher than those obtained with glass wool. The general conclusion is that the series additived with mineral wool from C&DW show better results in tests than the ones used nowadays as plaster reinforcement.
Resumo:
Construction projects are risky. However, the characteristics of the risk highly depend on the type of procurement being adopted for managing the project. A build-operate-transfer (BOT) project is recognized as one of the most risky project schemes. There are instances of project failure where a BOT scheme was employed. Ineffective rts are increasingly being managed using various risk management tools and techniques. However, application of those tools depends on the nature of the project, organization's policy, project management strategy, risk attitude of the project team members, and availability of the resources. Understanding of the contents and contexts of BOT projects, together with a thorough understanding of risk management tools and techniques, helps select processes of risk management for effective project implementation in a BOT scheme. This paper studies application of risk management tools and techniques in BOT projects through reviews of relevant literatures and develops a model for selecting risk management process for BOT projects. The application to BOT projects is considered from the viewpoints of the major project participants. Discussion is also made with regard to political risks. This study would contribute to the establishment of a framework for systematic risk management in BOT projects.
Resumo:
Despite the availability of various control techniques and project control software many construction projects still do not achieve their cost and time objectives. Research in this area so far has mainly been devoted to identifying causes of cost and time overruns. There is limited research geared towards studying factors inhibiting the ability of practitioners to effectively control their projects. To fill this gap, a survey was conducted on 250 construction project organizations in the UK, which was followed by face-to-face interviews with experienced practitioners from 15 of these organizations. The common factors that inhibit both time and cost control during construction projects were first identified. Subsequently 90 mitigating measures have been developed for the top five leading inhibiting factors—design changes, risks/uncertainties, inaccurate evaluation of project time/duration, complexities and non-performance of subcontractors were recommended. These mitigating measures were classified as: preventive, predictive, corrective and organizational measures. They can be used as a checklist of good practice and help project managers to improve the effectiveness of control of their projects.
Resumo:
The aim of this study is to address the main deficiencies with the prevailing project cost and time control practices for construction projects in the UK. A questionnaire survey was carried out with 250 top companies followed by in-depth interviews with 15 experienced practitioners from these companies in order to gain further insights of the identified problems, and their experience of good practice on how these problems can be tackled. On the basis of these interviews and syntheses with literature, a list of 65 good practice recommendations have been developed for the key project control tasks: planning, monitoring, reporting and analysing. The Delphi method was then used, with the participation of a panel of 8 practitioner experts, to evaluate these improvement recommendations and to establish their degree of relevance. After two rounds of Delphi, these recommendations are put forward as "critical", "important", or "helpful" measures for improving project control practice.
Resumo:
Today, over 15,000 Ion Mobility Spectrometry (IMS) analyzers are employed at worldwide security checkpoints to detect explosives and illicit drugs. Current portal IMS instruments and other electronic nose technologies detect explosives and drugs by analyzing samples containing the headspace air and loose particles residing on a surface. Canines can outperform these systems at sampling and detecting the low vapor pressure explosives and drugs, such as RDX, PETN, cocaine, and MDMA, because these biological detectors target the volatile signature compounds available in the headspace rather than the non-volatile parent compounds of explosives and drugs.^ In this dissertation research volatile signature compounds available in the headspace over explosive and drug samples were detected using SPME as a headspace sampling tool coupled to an IMS analyzer. A Genetic Algorithm (GA) technique was developed to optimize the operating conditions of a commercial IMS (GE Itemizer 2), leading to the successful detection of plastic explosives (Detasheet, Semtex H, and C-4) and illicit drugs (cocaine, MDMA, and marijuana). Short sampling times (between 10 sec to 5 min) were adequate to extract and preconcentrate sufficient analytes (> 20 ng) representing the volatile signatures in the headspace of a 15 mL glass vial or a quart-sized can containing ≤ 1 g of the bulk explosive or drug.^ Furthermore, a research grade IMS with flexibility for changing operating conditions and physical configurations was designed and fabricated to accommodate future research into different analytes or physical configurations. The design and construction of the FIU-IMS were facilitated by computer modeling and simulation of ion’s behavior within an IMS. The simulation method developed uses SIMION/SDS and was evaluated with experimental data collected using a commercial IMS (PCP Phemto Chem 110). The FIU-IMS instrument has comparable performance to the GE Itemizer 2 (average resolving power of 14, resolution of 3 between two drugs and two explosives, and LODs range from 0.7 to 9 ng). ^ The results from this dissertation further advance the concept of targeting volatile components to presumptively detect the presence of concealed bulk explosives and drugs by SPME-IMS, and the new FIU-IMS provides a flexible platform for future IMS research projects.^