911 resultados para Change Communication
Resumo:
Brisbane Water (BW), a commercialised business arm of Brisbane City Council (BCC) entered into an alliance with a number of organisations from the private sector in order to design, construct, commission and undertake upgrades to three existing wastewater treatment plants located at Sandgate, Oxley Creek, and Wacol in Brisbane. The alliance project is called the Brisbane Water Environmental Alliance (BWEA). This report details the efforts of a team of researchers from the School of Management at Queensland University of Technology to investigate this alliance. This is the second report on this project, and is called Stage 2 of the research. At the time that Stage 2 of the research project was conducted, the BWEA project was nearing completion with a further 8 months remaining before project completion. The aim of this report is to explore individuals’ perceptions of the effectiveness and functioning of the BWEA project in the latter stages of the project. The second aim of this report is to analyse the longitudinal findings of this research project by integrating the findings from Stage 1 and Stage 2 of the project. This long-term analysis of the functioning and effectiveness of the alliance is important because at the current time, researchers have little knowledge of the group developmental processes that occur in large-scale alliances over time. Stage 2 of this research project has a number of aims including assessing performance of the BWEA project from the point of view of a range of stakeholders including the alliance board and alliance management team, alliance staff, and key stakeholders from the client organisation (Brisbane Water). Data were collected using semi-structured interviews with 18 individuals including two board members, one external facilitator, and four staff members from the client organisation. Analysis involved coding the interview transcripts in terms of the major issues that were reported by interviewees.
Resumo:
Reconfiguration of corporate structures and the retailer-supplier interface in the retail industry have restructured product markets and supply chains, as well as supermarket employment, over the past decade or so (Baret, Lehndorff & Sparks 2000; du Gay 1996). Various studies have examined the consequent changes in labour usage practices within supermarkets or superstores (Baret et al. 2000; Marchington 1995; Penn & Wirth 1993; Sparks 1992; Dawson, Findlay & Sparks 1987, 1986). Commonly, this literature explores the interplay between shifts in the structure of the labour market, broader societal trends and retailers’ employment strategies. One study found that domestic and gender dimensions, accompanied by industrial relations regimes, exert considerable influence on patterns of labour usage (Baret et al. 2000). However, while the types of labour usage and the drivers of changes to labour usage patterns have attracted significant academic attention, research has largely overlooked the ways in which the nature of supermarket work has evolved as a result of changing technology, which effectively bolsters managerial prerogative, and which has affected the skill levels of workers in the industry (Marchington 1995).
Resumo:
In architectural design and the construction industry, there is insufficient evidence about the way designers collaborate in their normal working environments using both traditional and digital media. It is this gap in empirical evidence that the CRC project, “Team Collaboration in High Bandwidth Virtual Environments” addresses. The project is primarily, but not exclusively, concerned with the conceptual stages of design carried out by professional designers working in different offices. The aim is to increase opportunities for communication and interaction between people in geographically distant locations in order to improve the quality of collaboration. In order to understand the practical implications of introducing new digital tools on working practices, research into how designers work collaboratively using both traditional and digital media is being undertaken. This will involve a series of empirical studies in the work places of the industry partners in the project. The studies of collaboration processes will provide empirical results that will lead to more effective use of virtual environments in design and construction processes. The report describes the research approach, the industry study, the methods for data collection and analysis and the foundation research methodologies. A distinctive aspect is that the research has been devised to enable field studies to be undertaken in a live industrial environment where the participant designers carry out real projects alongside their colleagues and in familiar locations. There are two basic research objectives: one is to obtain evidence about design practice that will inform the architecture and construction industries about the impact and potential benefit of using digital collaboration technologies; the second is to add to long term research knowledge of human cognitive and behavioural processes based on real world data. In order to achieve this, the research methods must be able to acquire a rich and heterogeneous set of data from design activities as they are carried out in the normal working environment. This places different demands upon the data collection and analysis methods to those of laboratory studies where controlled conditions are required. In order to address this, the research approach that has been adopted is ethnographic in nature and case study-based. The plan is to carry out a series of indepth studies in order to provide baseline results for future research across a wider community of user groups. An important objective has been to develop a methodology that will produce valid, significant and transferable results. The research will contribute to knowledge about how architectural design and the construction industry may benefit from the introduction of leading edge collaboration technologies. The outcomes will provide a sound foundation for the production of guidelines for the assessment of high bandwidth tools and their future deployment. The knowledge will form the basis for the specification of future collaboration products and collaboration processes. This project directly addresses the industry-identified focus on cultural change, image, e-project management, and innovative methods.
Resumo:
Innovation processes are rarely smooth and disruptions often occur at transition points were one knowledge domain passes the technology on to another domain. At these transition points communication is a key component in assisting the smooth hand over of technologies. However for smooth transitions to occur we argue that appropriate structures have to be in place and boundary spanning activities need to be facilitated. This paper presents three case studies of innovation processes and the findings support the view that structures and boundary spanning are essential for smooth transitions.
Resumo:
In today's highly challenging business environment, an innovative and systemic approach is imperative to survival and growth. Organisational integration and technological integration, are often seen as a catalyst of change that could lead to significant improvements in organisations. The levels of improvement in inter and intra firm integration should arise from a detailed understanding and development of competences within and between organisations. Preliminary findings suggest that lack of trust across organisational cultures within the firms has a negative influence on the development of the capabilities to integrate and align technological innovations and hinders implementation and the effectiveness of the operations. Additionally, poor communication and conflict effects customer satisfaction. Firms need to transfer the competences that support cooperative integration, developed through interaction with supply chain partners, to their relationship arrangements with other supply chain partners, as these are key to ensuring low operational costs.
Resumo:
In dynamic environments, firms seek to build capabilities which will permit them to become innovation and change ready. Programs offered by intermediaries, while varying greatly in content and format, are designed to support those firms wishing to enhance their competitiveness. Firms which participate in intermediary programs have displayed their willingness to overcome deficiencies or barriers to competitiveness through acquiring knowledge which is external to the firm. This paper reports on interviews with 24 firms who were involved in a MAP or TAP program offered by QMI Solutions. The findings of the research suggest that knowledge intermediaries serve to disrupt organisational paths and in so doing establish mechanisms for ongoing learning and change. They do this first by disrupting the firm with a positive learning experience and also by establishing processes for developing new relationships and access to knowledge which are critical for learning and change. It is the experience of learning through knowledge exchange which can trigger the pursuit of new paths and it is the processes involving new relations and knowledge processing that provides the micro-foundations for ongoing learning and change. This suggests that the role of intermediaries goes well beyond merely knowledge transfer to include longer term effects on the capability of organisations to innovate, which is critical to economic competitiveness and the survival rate of firms.
Resumo:
Construction sector policy makers have the opportunity to create improvements and develop economic, social and environmental sustainability through supply chain economics. The idea of the supply chain concept to improve firm behaviour and industry performance is not new. However there has been limited application and little or no measurement to monitor successful implementation. Often purchasing policies have been developed with sound strategic procurement principles but even these have had limited penetration in to the processes and practices of infrastructure agencies. The research reported in this paper documents an action research study currently being undertaken in the Australian construction sector which aims to explore supply chain economic policy implementation for sectoral change by two government agencies. The theory which informs this study is the emerging area of construction supply chain economics. There are five stages to the project including; demand analysis, chain analysis, government agency organizational audit, supplier strategy and strategic alignment. The overall objective is towards the development of a Supplier Group Strategy Map for two public sector agencies. Two construction subsectors are examined in detail; construction and demolition waste and precast concrete. Both of these subsectors are critical to the economic and environmental sustainability performance of the construction sector and the community as a whole in the particular jurisdictions. The local and state government agencies who are at the core of the case studies rely individually on the performance of these sectors. The study is set within the context of a sound state purchasing policy that has however, had limited application by the two agencies. Partial results of the study are presented and early findings indicate that the standard risk versus expenditure procurement model does not capture the complexities of project, owner and government risk considerations. A new model is proposed in this paper, which incorporates the added dimension of time. The research results have numerous stakeholders; they will hold particular value for those interested in regional construction sector economics, government agencies who develop and implement policy and who have a large construction purchasing imprint and the players involved in the two subsectors. Even though this is a study in Australia it has widespread applicability as previous research indicates that procurement reform is of international significance and policy implementation is problematic.
Resumo:
This paper presents a secure communication protocol which can be used as the framework for an e-tendering scheme. This protocol is focused on securing the integrity of tendering documents and ensuring that a secure record of document generation is kept. Our protocol provides a mechanism to manage e-tendering contract evidence as a legal record in a unique and effective manner. It is the starting point of reliable record keeping. To a certain extent, it also addresses existing security problems in the traditional tendering processes.
Resumo:
The innovation diffusion and knowledge management literature strongly supports the importance of communities of practice (COP) for enabling knowledge about how to use and adopt innovation initiatives. One of the most powerful tools for innovation diffusion is word-of-mouth wisdom from committed individuals who mentor and support each other. Close proximity for face-to-face interaction is highly effective, however, many organisations are geographically dispersed with projects being virtual linked sub-organisations using ICT to communicate. ICT has also introduced a useful facilitating technology for developing knowledge networks. This paper presents findings from a research program concentrating on ICT innovation diffusion in the Australian construction industry. One way in which ICT diffusion is taking place was found to be through within-company communities of practice. We undertook in-depth unstructured interviews with three of the major 10 to 15 contractors in Australia to discuss their ICT diffusion strategies. We discovered that in all three cases,within company networked communities of practice was a central strategy. Further, effective diffusion of ICT groupware tools can be critical in developing COP where they are geographically dispersed.
Resumo:
This study utilized the Theory of Planned Behavior (TPB) to understand employee change readiness. The extent to which attitude, subjective norm, and perceived behavioral control predicted employees’ intentions to carry out activities that were supportive of a change event were investigated. The impact of group norm was examined as a further predictor of change-related intentions. The context of the research was a sample of 82 employees in the early stages of a re-brand. Results indicated that direct measures of attitude and subjective norm, as well as group norm, emerged as significant predictors of employees’ intentions to perform re-brand behaviors. To capture the indirect beliefs underlying attitude, subjective norm, and perceived behavioral control, participants also provided an assessment of their behavioral, normative, and control beliefs in regards to the change event, respectively. A series of MANOVAs revealed significant differences between moderate and high intenders on a range of underlying beliefs. Findings are discussed in terms of the application of the TPB for effective change management.
Resumo:
Global and local studies show that the present growth-based approach to development is unsustainable. If we are serious about surviving the 21st century we will need graduates who are not simply 'globally portable' or even 'globally competent', but also wise global citizens, Globo sapiens. This book contributes to what educators need to know, do and be in order to support transformative learning. The book is based on work with large, socially and culturally diverse, first-year engineering students at an Australian university of technology. It shows that reflective journals, with appropriate planning and support, can be one pillar of a transformative pedagogy which can encourage significant and even transformative attitude change in relation to gender, culture and the environment. It also offers evidence of improved communication skills and other tangible changes to counter common criticisms that such work is "airy-fairy" and irrelevant. The author combines communication theory with critical futures thinking to provide layered understandings of how transformative learning affected students' thinking, learning and behaviour. So the book is both a case-study and a detailed response to the personal and professional challenges that educators all over the world will face as they try to guide students in sustainable directions. It will be useful to teachers in higher education, especially those interested in internationalisation of the curriculum, transformative learning and values change for sustainable futures.
Resumo:
Focusing primarily on Anglophone countries, this article begins by looking at the changing environment of foundations, the pressures on foundations and some responses to those pressures. It then focuses on the potential of a structural change approach - often known as 'social change' or 'social justice' grant-making - as a solution to some of the modern dilemmas of foundations, and considers why this approach has, with some exceptions, gained relatively little support. This raises the wider issues of why and how resource-independent, endowed foundations change when conventional explanations of organisational change do not easily apply. Researching a 'lack' is clearly difficult; this article adopts an analytic perspective, examining the characteristics of the structural change approach as a mimetic model, and draws on the work of Rogers (2003) on the characteristics required for the successful diffusion of innovations. It suggests that the structural change approach suffers from some fundamental weaknesses as a mimetic model, failing to meet some key characteristics for the diffusion of innovations. In conclusion, the article looks at conditions under which these weaknesses may be overcome.
Resumo:
Discrete event-driven simulations of digital communication networks have been used widely. However, it is difficult to use a network simulator to simulate a hybrid system in which some objects are not discrete event-driven but are continuous time-driven. A networked control system (NCS) is such an application, in which physical process dynamics are continuous by nature. We have designed and implemented a hybrid simulation environment which effectively integrates models of continuous-time plant processes and discrete-event communication networks by extending the open source network simulator NS-2. To do this a synchronisation mechanism was developed to connect a continuous plant simulation with a discrete network simulation. Furthermore, for evaluating co-design approaches in an NCS environment, a piggybacking method was adopted to allow the control period to be adjusted during simulations. The effectiveness of the technique is demonstrated through case studies which simulate a networked control scenario in which the communication and control system properties are defined explicitly.