898 resultados para international construction
Resumo:
This paper studies the influence of cynic philosophy in the construction of the myth of the good savage. In the first part it studies the importance of cynicism in the XVI century and how the cynic influence of Erasmus, More and Montaigne was fundamental to the way that Europe approached the American indigenous. In the second part it studies the cynic motives that could have influenced in the construction of the myth of the good savage.
Resumo:
The change of supply chain relationships from the traditional adversarial to the collaborative has been increasing in the UK construction industry. To reflect this change, some attempts have been made to establish models for measuring and improving supply chain relationships in construction. However, there are obvious deficiencies in these existing models. This highlights the need for a systematic model for the assessment of construction supply chain relationships. Based on a review of the literature and an expert group discussion, an assessment framework is developed in this paper, which consists of assessment criteria, relationship levels, detailed descriptions, assessment classes and assessment procedures. The proposed framework is evaluated through expert interviews and case studies. This framework provides a roadmap for the improvement of supply chain relationships. It can help construction organisations to position their current relationship and identify key areas for relationship improvement in the future.
Resumo:
The objective of this paper is to identify the various managerial constraints, difficulties and issues encountered and resulting strategies adopted, to aid in the management of the various and often complex health and safety concerns, which occur within a confined construction site. This is achieved through classifying the various managerial burdens encountered with the numerous strategies adopted, to ensure the successful management of such confined environments within the realm of health and safety. Through an extensive literature review and detailed interviews, a comprehensive insight into the health and safety concerns within a confined construction site environment is portrayed. The leading managerial strategies to the management of health and safety on confined construction sites may be listed as follows; (1) Traffic Management Plan, (2) Effective Resource Management Plan, (3) Temporary Facilities Management Plan, (4) Safe System of Work Plan, (5) Site Safety Plan, (6) Design Site Layout, (7) Space Management Plan, (8) Effective Program Management, and (9) Space Scheduling. Based on the research, it can be concluded, that through effective management of these issues identified coupled with implementing the various strategies highlighted; successful management of health and safety within a confined construction site environment is attainable.
Resumo:
Purpose – The purpose of this study is to explore the formative development of construction supply chain guidelines or proposals in a UK region’s schools’ estates procurement process to more effectively address a forthcoming increase in investment.
Design/methodology/approach – The research approach is interpretive. Using an action research approach, repeated semi-structured interviews and focus groups with a range of stakeholders are conducted.
Findings – The current construction supply chain in schools’ estate procurement has many difficulties, not least given the highly fragmented and disconnected nature of the projects. Synergies are being missed and there is little or no continuous improvement. Drawing on these findings, the research iteratively develops a range of proposals and guidelines to address this situation.
Research limitations/implications – This research adds weight to the current focus on pressing for change in the construction industry. It presents potentially valuable insights into the benefits of partnering arrangements and how these might usefully be incorporated into schools’ estate supply chain.
Practical implications – A set of guidelines is developed to guide the public procurement of schools’ estate in a UK region. These guidelines are set within the context of the Modernising and Rethinking Construction agenda.
Originality/value – The action research approach enabled the researchers to gain a unique insight into how public procurement and contractor personnel interact and to establish effective practical guidelines.
Resumo:
Few studies to date have paid attention to relationship management when addressing performance problems. To bridge the knowledge gap, a questionnaire survey is conducted to analyze the impact of relationship management on project performance in construction. The analysis reveals that the deterioration of working relationships may increase the likelihood of poor performance. Poor performance can be effectively reduced by improving some aspects of working relationships. Collaborative working contributes to performance improvement, in which long-term collaboration is more effective than short-term collaboration. In addition to the questionnaire survey, a series of expert interviews provide a deeper insight into effective relationship management.