884 resultados para implementation project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

An iterative Monte Carlo algorithm for evaluating linear functionals of the solution of integral equations with polynomial non-linearity is proposed and studied. The method uses a simulation of branching stochastic processes. It is proved that the mathematical expectation of the introduced random variable is equal to a linear functional of the solution. The algorithm uses the so-called almost optimal density function. Numerical examples are considered. Parallel implementation of the algorithm is also realized using the package ATHAPASCAN as an environment for parallel realization.The computational results demonstrate high parallel efficiency of the presented algorithm and give a good solution when almost optimal density function is used as a transition density.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In ensuring the quality of learning and teaching in Higher Education, self-evaluation is an important component of the process. An example would be the approach taken within the CDIO community whereby self-evaluation against the CDIO standards is part of the quality assurance process. Eight European universities (Reykjavik University, Iceland; Turku University of Applied Sciences, Finland; Aarhus University, Denmark; Helsinki Metropolia University of Applied Sciences, Finland; Ume? University, Sweden; Telecom Bretagne, France; Aston University, United Kingdom; Queens University Belfast, United Kingdom) are engaged in an EU funded Erasmus + project that is exploring the quality assurance process associated with active learning. The development of a new self-evaluation framework that feeds into a ?Marketplace? where participating institutions can be paired up and then engage in peer evaluations and sharing around each institutions approach to and implementation of active learning. All of the partner institutions are engaged in the application of CDIO within their engineering programmes and this has provided a common starting point for the partnership to form and the project to be developed. Although the initial focus will be CDIO, the longer term aim is that the approach could be of value beyond CDIO and within other disciplines. The focus of this paper is the process by which the self-evaluation framework is being developed and the form of the draft framework. In today?s Higher Education environment, the need to comply with Quality Assurance standards is an ever present feature of programme development and review. When engaging in a project that spans several countries, the wealth of applicable standards and guidelines is significant. In working towards the development of a robust Self Evaluation Framework for this project, the project team decided to take a wide view of the available resources to ensure a full consideration of different requirements and practices. The approach to developing the framework considered: a) institutional standards and processes b) national standards and processes e.g. QAA in the UK c) documents relating to regional / global accreditation schemes e.g. ABET d) requirements / guidelines relating to particular learning and teaching frameworks e.g. CDIO. The resulting draft self-evaluation framework is to be implemented within the project team to start with to support the initial ?Marketplace? pairing process. Following this initial work, changes will be considered before a final version is made available as part of the project outputs. Particular consideration has been paid to the extent of the framework, as a key objective of the project is to ensure that the approach to quality assurance has impact but is not overly demanding in terms of time or paperwork. In other words that it is focused on action and value added to staff, students and the programmes being considered.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Ez a tanulmány a projektvezetési szakirodalomban kialakult ismeretanyagot szem előtt tartva (noha tételesen nem hivatkozva arra) tárja fel azt a sajátos és tipikusnak nevezhető kontextust, amelyben a projektalapú szervezetek projektmarketing tevékenysége megnyilvánul. A tanulmány célja tehát nem magának a projektmarketingnek a kérdéskörére irányul, hanem elsősorban annak projektspecifikus kontextusára. Jellegét illetően a tanulmány spekulatív jellegű, vagyis lényegét tekintve nem empirikus kutatási eredményekből levont következtetésekre épül. _____ Traditional approach to project marketing focuses on process-related aspects of the marketing efforts of project- based organisations. This paper is different. Unlike to the traditional approach it highlights the decisive contextual features of project marketing, bearing in mind the typical project business from the point of view of project-based organisations. These features include: a) instead of physically existing products project-based organisations need to sell their ability to create the project outcome physically; b) the project outcome and the conditions of implementation are defined by the project client; c) project clients are involved in creating the project outcome; d) project implementation strategy applied in a client organisation may vary project by project. These determining contextual features shape to a great extent the actual competitive position of the project-based organisations which may vary project by project even in relation to the very same project client.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The ultimate intent of this dissertation was to broaden and strengthen our understanding of IT implementation by emphasizing research efforts on the dynamic nature of the implementation process. More specifically, efforts were directed toward opening the "black box" and providing the story that explains how and why contextual conditions and implementation tactics interact to produce project outcomes. In pursuit of this objective, the dissertation was aimed at theory building and adopted a case study methodology combining qualitative and quantitative evidence. Precisely, it examined the implementation process, use and consequences of three clinical information systems at Jackson Memorial Hospital, a large tertiary care teaching hospital.^ As a preliminary step toward the development of a more realistic model of system implementation, the study proposes a new set of research propositions reflecting the dynamic nature of the implementation process.^ Findings clearly reveal that successful implementation projects are likely to be those where key actors envision end goals, anticipate challenges ahead, and recognize the presence of and seize opportunities. It was also found that IT implementation is characterized by the systems theory of equifinality, that is, there are likely several equally effective ways to achieve a given end goal. The selection of a particular implementation strategy appears to be a rational process where actions and decisions are largely influenced by the degree to which key actors recognize the mediating role of each tactic and are motivated to action. The nature of the implementation process is also characterized by the concept of "duality of structure," that is, context and actions mutually influence each other. Another key finding suggests that there is no underlying program that regulates the process of change and moves it form one given point toward a subsequent and already prefigured end. For this reason, the implementation process cannot be thought of as a series of activities performed in a sequential manner such as conceived in stage models. Finally, it was found that IT implementation is punctuated by a certain indeterminacy. Results suggest that only when substantial efforts are focused on what to look for and think about, it is less likely that unfavorable and undesirable consequences will occur. ^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Governmental accountability is the requirement of government entities to be accountable to the citizenry in order to justify the raising and expenditure of public resources. The concept of service efforts and accomplishments measurement for government programs was introduced by the Governmental Accounting Standards Board (GASB) in Service Efforts and Accomplishments Reporting: Its Time Has Come (1990). This research tested the feasibility of implementing the concept for the Federal-aid highway construction program and identified factors affecting implementation with a case study of the District of Columbia. Changes in condition and performance ratings for specific highway segments in 15 projects, before and after construction expenditures, were evaluated using data provided by the Federal Highway Administration. The results of the evaluation indicated difficulty in drawing conclusions on the state program performance, as a whole. The state program reflects problems within the Federally administered program that severely limit implementation of outcome-oriented performance measurement. Major problems identified with data acquisition are: data reliability, availability, compatibility and consistency among states. Other significant factors affecting implementation are institutional barriers and political barriers. Institutional issues in the Federal Highway Administration include the lack of integration of the fiscal project specific database with the Highway Performance Monitoring System database. The Federal Highway Administration has the ability to resolve both of the data problems, however interviews with key Federal informants indicate this will not occur without external directives and changes to the Federal “stewardship” approach to program administration. ^ The findings indicate many issues must be resolved for successful implementation of outcome-oriented performance measures in the Federal-aid construction program. The issues are organizational and political in nature, however in the current environment resolution is possible. Additional research is desirable and would be useful in overcoming the obstacles to successful implementation. ^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

There is significant national evidence the language development of four year-olds is a critical area for later school success (Brooks-Gunn, Fuligni, & Berlin, 2003; Cunningham, & Stanovich, 1998). This study originated as part of Literacy Intervention X (LIX), a larger national study conducted to examine the effectiveness of early literacy curricula implemented in subsidized childcare centers. The professional development of childcare center providers is key to improving the quality of subsidized care. In exploring the mentoring practices of nine LIX literacy coaches, the researcher investigated the perceptions of what best mentoring practices facilitated the implementation of literacy curricula by childcare providers. A qualitative case study was conducted using a combination of participant observer notes, document analysis, and focus group semi-structured interviews. The researcher is a participant observer, one of the nine Literacy Coaches. The best mentoring practices from the perspective of the literacy coaches are related to building relationships including trust, mutual respect, support, empathy, and encouragement with the childcare providers, the center directors, and with fellow literacy coaches. Clear, constant, and consistent communication with the childcare providers was a vital mentoring practice in building a relationship between the literacy coach and childcare provider. Another best mentoring practice in building a relationship with the childcare provider was the perceptions of the literacy coaches as co-learners in the mentoring process. The best mentoring practices highlighted in this study exemplified the kind of effective professional development that builds on the strengths of the childcare providers and does not disrupt the childcare centers or the services provided by the subsidized childcare programs that meet the needs of children and families. The experience of these nine literacy coaches, including their perceptions of effective mentoring practices, along with lesson learned about relationships, mentoring team structures, and general project design sheds light on the challenge of mentoring subsidized childcare providers in future literacy intervention projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this.^ In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.^

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Communication has become an essential function in our civilization. With the increasing demand for communication channels, it is now necessary to find ways to optimize the use of their bandwidth. One way to achieve this is by transforming the information before it is transmitted. This transformation can be performed by several techniques. One of the newest of these techniques is the use of wavelets. Wavelet transformation refers to the act of breaking down a signal into components called details and trends by using small waveforms that have a zero average in the time domain. After this transformation the data can be compressed by discarding the details, transmitting the trends. In the receiving end, the trends are used to reconstruct the image. In this work, the wavelet used for the transformation of an image will be selected from a library of available bases. The accuracy of the reconstruction, after the details are discarded, is dependent on the wavelets chosen from the wavelet basis library. The system developed in this thesis takes a 2-D image and decomposes it using a wavelet bank. A digital signal processor is used to achieve near real-time performance in this transformation task. A contribution of this thesis project is the development of DSP-based test bed for the future development of new real-time wavelet transformation algorithms.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Cloud computing enables independent end users and applications to share data and pooled resources, possibly located in geographically distributed Data Centers, in a fully transparent way. This need is particularly felt by scientific applications to exploit distributed resources in efficient and scalable way for the processing of big amount of data. This paper proposes an open so- lution to deploy a Platform as a service (PaaS) over a set of multi- site data centers by applying open source virtualization tools to facilitate operation among virtual machines while optimizing the usage of distributed resources. An experimental testbed is set up in Openstack environment to obtain evaluations with different types of TCP sample connections to demonstrate the functionality of the proposed solution and to obtain throughput measurements in relation to relevant design parameters.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Acknowledgements Sincere thanks are due to all who have contributed to this study, which was funded in part by the Local Authority. The Head Teacher and Local Authority Officer have been instrumental in encouraging and supporting the research and the teachers and pupils at the school, along with several local authority support staff, have contributed directly. Colleagues from the University of Aberdeen, including Prof Do Coyle, Dr Yvonne Bain, and Phil Marston, helped to guide the project and provided useful feedback.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Acknowledgements Sincere thanks are due to all who have contributed to this study, which was funded in part by the Local Authority. The Head Teacher and Local Authority Officer have been instrumental in encouraging and supporting the research and the teachers and pupils at the school, along with several local authority support staff, have contributed directly. Colleagues from the University of Aberdeen, including Prof Do Coyle, Dr Yvonne Bain, and Phil Marston, helped to guide the project and provided useful feedback.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Large marine areas and regional seas present a challenge in terms of management. They are often bordered by numerous maritime jurisdictions; with multi-use and multi-sector environments; involving varying governance arrangements; and generation of sufficient levels of data to best inform decision-makers. Marine management at the regional scale involves a range of mechanisms and approaches to ensure all relevant stakeholders have an opportunity to engage in the process; and these approaches can differ in their legal and regulatory conditions. At present, no such comparable structures exist at the transnational level for the ecosystem-based management of the Celtic Sea. Against this backdrop, a participative process, involving representatives from differing sectors of activity in the Celtic Sea spanning four Member States, was established for the purpose of identifying realistic and meaningful management principles in line with the goals of the Marine Strategy Framework Directive.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This report involves a formal scoping exercise to identify lessons from a wide range of previous and current project and initiative experiences at the national, regional seas, European and global levels. An inventory of 77 projects and initiatives that are relevant with regard to the key activities proposed by the Celtic Seas Partnership has been compiled, as well as a short-list of 23 of the most pertinent projects, lessons learnt and contact names. This report has identified a number of synergies and collaborative opportunities from other project and initiatives in the Celtic Seas and beyond. It provides a strong starting point to clarify to stakeholders the uniqueness of the Celtic Seas Partnership project and delivers a sound baseline for the other preparatory actions (A2 Stakeholder Mapping and A3 Baseline Analysis for Marine Strategy Framework Directive Implementation) and the implementation actions. Furthermore, this report helps to avoid duplication of effort during the life-span of the project by highlighting what information pertaining to the Celtic Seas MSFD sub-region already exists.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

OBJECTIVE: To pilot test if Orthopaedic Surgery residents could self-assess their performance using newly created milestones, as defined by the Accreditation Council on Graduate Medical Education. METHODS: In June 2012, an email was sent to Program Directors and administrative coordinators of the 154 accredited Orthopaedic Surgery Programs, asking them to send their residents a link to an online survey. The survey was adapted from the Orthopaedic Surgery Milestone Project. Completed surveys were aggregated in an anonymous, confidential database. SAS 9.3 was used to perform the analyses. RESULTS: Responses from 71 residents were analyzed. First and second year residents indicated through self-assessment that they had substantially achieved Level 1 and Level 2 milestones. Third year residents reported they had substantially achieved 30/41, and fourth year residents, all Level 3 milestones. Fifth year, graduating residents, reported they had substantially achieved 17 Level 4 milestones, and were extremely close on another 15. No milestone was rated at Level 5, the maximum possible. Earlier in training, Patient Care and Medical Knowledge milestones were rated lower than the milestones reflecting the other four competencies of Practice Based Learning and Improvement, Systems Based Practice, Professionalism, and Interpersonal Communication. The gap was closed by the fourth year. CONCLUSIONS: Residents were able to successfully self-assess using the 41 Orthopaedic Surgery milestones. Respondents' rate improved proficiency over time. Graduating residents report they have substantially, or close to substantially, achieved all Level 4 milestones. Milestone self-assessment may be a useful tool as one component of a program's overall performance assessment strategy.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Integrated project delivery (IPD) method has recently emerged as an alternative to traditional delivery methods. It has the potential to overcome inefficiencies of traditional delivery methods by enhancing collaboration among project participants. Information and communication technology (ICT) facilitates IPD by effective management, processing and communication of information within and among organizations. While the benefits of IPD, and the role of ICT in realizing them, have been generally acknowledged, the US public construction sector is very slow in adopting IPD. The reasons are - lack of experience and inadequate understanding of IPD in public owner as confirmed by the results of the questionnaire survey conducted under this research study. The public construction sector should be aware of the value of IPD and should know the essentials for effective implementation of IPD principles - especially, they should be cognizant of the opportunities offered by advancements in ICT to realize this. In order to address the need an IPD Readiness Assessment Model (IPD-RAM) was developed in this research study. The model was designed with a goal to determine IPD readiness of a public owner organization considering selected IPD principles, and ICT levels, at which project functions were carried out. Subsequent analysis led to identification of possible improvements in ICTs that have the potential to increase IPD readiness scores. Termed as the gap identification, this process was used to formulate improvement strategies. The model had been applied to six Florida International University (FIU) construction projects (case studies). The results showed that the IPD readiness of the organization was considerably low and several project functions can be improved by using higher and/or advanced level ICT tools and methods. Feedbacks from a focus group comprised of FIU officials and an independent group of experts had been received at various stages of this research and had been utilized during development and implementation of the model. Focus group input was also helpful for validation of the model and its results. It was hoped that the model developed would be useful to construction owner organizations in order to assess their IPD readiness and to identify appropriate ICT improvement strategies.