942 resultados para electric power plant


Relevância:

90.00% 90.00%

Publicador:

Resumo:

This paper examines the life cycle GHG emissions from existing UK pulverized coal power plants. The life cycle of the electricity Generation plant includes construction, operation and decommissioning. The operation phase is extended to upstream and downstream processes. Upstream processes include the mining and transport of coal including methane leakage and the production and transport of limestone and ammonia, which are necessary for flue gas clean up. Downstream processes, on the other hand, include waste disposal and the recovery of land used for surface mining. The methodology used is material based process analysis that allows calculation of the total emissions for each process involved. A simple model for predicting the energy and material requirements of the power plant is developed. Preliminary calculations reveal that for a typical UK coal fired plant, the life cycle emissions amount to 990 g CO2-e/kWh of electricity generated, which compares well with previous UK studies. The majority of these emissions result from direct fuel combustion (882 g/kWh 89%) with methane leakage from mining operations accounting for 60% of indirect emissions. In total, mining operations (including methane leakage) account for 67.4% of indirect emissions, while limestone and other material production and transport account for 31.5%. The methodology developed is also applied to a typical IGCC power plant. It is found that IGCC life cycle emissions are 15% less than those from PC power plants. Furthermore, upon investigating the influence of power plant parameters on life cycle emissions, it is determined that, while the effect of changing the load factor is negligible, increasing efficiency from 35% to 38% can reduce emissions by 7.6%. The current study is funded by the UK National Environment Research Council (NERC) and is undertaken as part of the UK Carbon Capture and Storage Consortium (UKCCSC). Future work will investigate the life cycle emissions from other power generation technologies with and without carbon capture and storage. The current paper reveals that it might be possible that, when CCS is employed. the emissions during generation decrease to a level where the emissions from upstream processes (i.e. coal production and transport) become dominant, and so, the life cycle efficiency of the CCS system can be significantly reduced. The location of coal, coal composition and mining method are important in determining the overall impacts. In addition to studying the net emissions from CCS systems, future work will also investigate the feasibility and technoeconomics of these systems as a means of carbon abatement.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This academic work describes the interfirm technological learning processes behavior at a thermo plant throughout the years 2001 till 2007. Its former ownership structure was composed by two foreigners companies. This structure was changed by the acquisition of the company control by a Brazilian state owned company on April 2006. The company is a Natural Gas Fired Power Plant placed at Macaé City, at Rio de Janeiro State, Brazil generating electric power right to National Integrated System (SIN). The goal of this research is verify how the technological knowledge had been acquired by the firm and how it had been spread out throughout the organization before and after the change of the ownership structure. The taxonomy applied to determining of ownership structure take in account three parameters: type, specific characteristic and the ownership structure itself. Technological Learning Interfirm Processes have been examined from a model of systemic approach that establishes four key characteristics: ¿variety, intensity, functioning and interaction¿. During 2001 until 2006, till the change of owner structure, the firm developed its own learning processes in its own operational routines. The main learning processes have been identified from empirical evidences. It has been adopted the cut line at year of 2006 for the comparison among the technological learning processes behavior, when the change of ownership structure took place. The data capture occurred within April and August 2007 covering since 2001. Verified the behavior of these learning processes before and after the ownership structure changed from private property to state owned property. The conclusion of this case study suggests that interfirm processes of technological learning identified by the research had their dynamical behavior promptly affected by a change from private to ownerstate ownership structure, exposing the company to a poor performance in its industry, due to the lack of 51% of the technological intrafirm learning processes and reduction of the acquisition of new technical knowledge and its conversion throughout the organization.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The natural gas perform a essential paper, not only in primary sectors of energy, but also in others sectors of economy. The use natural gas will have expansion in Brazil, motivated by governmental decision to increase the participation of this fuel in the Brazilian energy matrix from 4% to 12% up until 2010. in order to reach the objective related to increase the consumption of natural gas in the energy matrix and to propose solutions to attend the electric requirements of heart and refrigeration, using natural gas as primary power plant. This thesis has a main objective to analysis the perception of businessmen of hotel sector about the feasability of investment with micro-cogeneration system by natural gas in their hotel in turistic sector, in Natal/RN. It s show a case for the hotels selected analyzing the actual knowledge of businessmen about alternative of new technology in generation of owner energy. There was make a interview using a standard form researching information about this topic. In this interview has shown 4 (four) canaries for businessmen with different configurations of investment in micro-cogeneration. Two of this canaries uses the project finance like option to make fasible this projects. The resulteis showed who businessmen has insecurity to make decision to put in office alone, or with a local company, and perhaps with a national company to perform for a alternative energy system, justifying, the alone feasability and without information by local businessmen. Apart from that, they are receptive for a option to put in office in micro-cogeneration configured in the settings using project finance

Relevância:

90.00% 90.00%

Publicador:

Resumo:

O presente trabalho teve por objetivo avaliar a quantidade de calda de pulverização depositada nas folhas de Brachiaria plantaginea, em aplicações de pós-emergência precoce, em que se variou o volume de calda de pulverização, a densidade de plantas m-2 e o ângulo de posicionamento da ponta de pulverização na barra de aplicação. Para isso, foram conduzidos três experimentos em condições de laboratório. Nestes estudos, o volume de calda de pulverização foi obtido por meio da variação da velocidade de deslocamento de um veículo composto por plataforma e quatro rolamentos tracionados por um motor elétrico. Foi utilizada a ponta de pulverização XR Teejet 8001 EVS, na pressão de 241,4 kPa. O delineamento experimental utilizado foi o inteiramente casualizado, com cinco repetições. No primeiro experimento, os volumes utilizados foram de 1147,57; 860,68; 573,78; 459,02; 344,27; 229,51; 114,75; e 57,37 L ha-1 de calda de pulverização, com densidade de 600 plantas m-2. No segundo experimento foram estudadas as densidades de 300, 600, 900 e 1.200 plantas m-2; neste caso, utilizou-se o volume de 229,51 L ha-1 de calda de pulverização. No terceiro experimento avaliou-se o posicionamento do ângulo da ponta de pulverização na barra de aplicação e utilizou-se a densidade de 600 plantas m-2. Estudaram-se os ângulos de -30º, -15º, 90º, +15º e +30º e os volumes de calda de pulverização de 198,76; 221,69; 229,51; 221,69; e 198,76 L ha-1, respectivamente. Foram adotados sinais negativos para o sentido de deslocamento do veículo e sinais positivos para o sentido contrário ao deslocamento. As avaliações do depósito de calda de pulverização, na planta e no solo, foram feitas utilizando-se condutividade elétrica. A porcentagem de depósito de calda de pulverização nas plantas de B. plantaginea foi incrementada com a redução do volume de calda pulverizada por hectare. O depósito de calda por planta foi maior nas densidades maiores de plantas. O ângulo de posicionamento da ponta de pulverização na barra de aplicação incrementou o depósito de calda nas plantas de B. plantaginea, quando comparado com o ângulo de 90º.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This article presents an thermoeconomic analysis of cogeneration plants, applied as a rational technique to produce electric power and saturated steam. The aim of this new methodology is the minimum exergetic manufacturing cost (EMC), based on the Second Law of Thermodynamics. The decision variables selected for the optimization are the pressure and the temperature of the steam leaving the boiler in the case of using steam turbine, and the pressure ratio, turbine exhaust temperature and mass flow in the case of using gas turbines. The equations for calculating the capital costs of the components and products are formulated as a function of these decision variables. An application of the method using real data of a multinational chemical industry located in São Paulo state is presented. The conditions which establish the minimum cost are presented as finals conclusions.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This work evaluates the environmental impact resulting from the natural gas and diesel combustion in thermoelectric power plants that utilize the combined cycle technology (CC), as regarding to Brazilian conditions according to Thermopower Priority Plan JPP). In the regions where there are not natural gas the option has been the utilization of diesel and consequentily there are more emission of pollutants. The ecological efficiency concept, which evaluates by and large the environmental impact, caused by CO2, SO2, NOx and particulate matter (PM) emissions. The combustion gases of the thermoelectric power plants working with natural gas (less pollutant) and diesel (more pollutant) cause problems to the environment, for their components harm the human being life, animals and directly the plants. The resulting pollution from natural gas and diesel combustion is analyzed, considering separately the CO2, SO2, NO2 and particulate matter gas emission and comparing them with the in use international standards regarding the air quality. It can be concluded that it is possible to calculate thermoelectric power plant quantitative and qualitative environment factor, and on the ecological standpoint, for plant with total power of 41441 kW, being 27 170 kW for the gas turbine and 14271 kW for the steam turbine. The natural gas used as fuel is better than the diesel, presenting ecological efficiency of 0.944 versus 0.914 for the latter, considering a thermal efficiency of 54% for the combined cycle. (c) 2006 Elsevier Ltd. All rights reserved.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

As plantas aquáticas são estudadas como um efeito do desequilíbrio causado pela poluição e/ou alagamento dos rios. A quantidade excessiva de plantas, conseqüente desse desequilíbrio, dificulta a navegação e a produção de energia elétrica. O objetivo deste trabalho foi identificar as principais plantas aquáticas do rio Tietê e relacioná-las com a turbidez da água dos diferentes reservatórios. Foram avaliados todos os focos de vegetação aquática emersa, flutuante e submersa, presentes em cada reservatório, em toda a sua extensão, sendo consideradas como importantes as espécies que apresentaram o caráter dominante. Foi observado que os represamentos apresentam problema de plantas aquáticas e a qualidade da infestação varia entre os reservatórios. Foram consideradas como dominantes as seguintes espécies: Brachiaria mutica, Brachiaria subquadripara, Eichhornia crassipes, Egeria densa, Egeria najas, Enidra sessilis e Typha angustifolia. Observou-se que houve uma tendência de maior ocorrência de plantas flutuantes e emersas (marginais) nos reservatórios com maior turbidez e de plantas submersas naqueles com menor turbidez. Para as duas braquiárias, observou-se que a freqüência das espécies aumentou com o aumento da turbidez até o limite de 34,93 NTU. O aguapé ocorreu com altos índices de freqüência (acima de 50%) em todos os reservatórios do rio Tietê, independentemente das características da água. em se tratando das egérias, a freqüência das espécies aumentou gradativamente com a redução da turbidez e a taboa não apresentou uma relação com o índice estudado. A espécie E. sessilis se mostrou bastante dependente da qualidade da água, tendo sua freqüência aumentada com o aumento da turbidez.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This work presents a methodology to analyze transient stability (first oscillation) of electric energy systems, using a neural network based on ART architecture (adaptive resonance theory), named fuzzy ART-ARTMAP neural network for real time applications. The security margin is used as a stability analysis criterion, considering three-phase short circuit faults with a transmission line outage. The neural network operation consists of two fundamental phases: the training and the analysis. The training phase needs a great quantity of processing for the realization, while the analysis phase is effectuated almost without computation effort. This is, therefore the principal purpose to use neural networks for solving complex problems that need fast solutions, as the applications in real time. The ART neural networks have as primordial characteristics the plasticity and the stability, which are essential qualities to the training execution and to an efficient analysis. The fuzzy ART-ARTMAP neural network is proposed seeking a superior performance, in terms of precision and speed, when compared to conventional ARTMAP, and much more when compared to the neural networks that use the training by backpropagation algorithm, which is a benchmark in neural network area. (c) 2005 Elsevier B.V. All rights reserved.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The conventional Newton and fast decoupled power flow (FDPF) methods have been considered inadequate to obtain the maximum loading point of power systems due to ill-conditioning problems at and near this critical point. It is well known that the PV and Q-theta decoupling assumptions of the fast decoupled power flow formulation no longer hold in the vicinity of the critical point. Moreover, the Jacobian matrix of the Newton method becomes singular at this point. However, the maximum loading point can be efficiently computed through parameterization techniques of continuation methods. In this paper it is shown that by using either theta or V as a parameter, the new fast decoupled power flow versions (XB and BX) become adequate for the computation of the maximum loading point only with a few small modifications. The possible use of reactive power injection in a selected PV bus (Q(PV)) as continuation parameter (mu) for the computation of the maximum loading point is also shown. A trivial secant predictor, the modified zero-order polynomial which uses the current solution and a fixed increment in the parameter (V, theta, or mu) as an estimate for the next solution, is used in predictor step. These new versions are compared to each other with the purpose of pointing out their features, as well as the influence of reactive power and transformer tap limits. The results obtained with the new approach for the IEEE test systems (14, 30, 57 and 118 buses) are presented and discussed in the companion paper. The results show that the characteristics of the conventional method are enhanced and the region of convergence around the singular solution is enlarged. In addition, it is shown that parameters can be switched during the tracing process in order to efficiently determine all the PV curve points with few iterations. (C) 2003 Elsevier B.V. All rights reserved.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

A Summary of different topological arrangements concerning a ZCS-PWM cell is presented, based on the analysis of its application in boost rectifying preregulators, controlled by the technique of instantaneous average values of input current, with the purpose of obtaining high-input-power-factor rectifier and high efficiency in single-phase applications in telecommunication systems. The main characteristics of each switching cell are described, providing conditions to establish a qualitative comparison among the structures. In addition, experimental results are presented for a prototype of the latest version of the ZCS-PWM boost rectifier, implemented for processing normal values of 1200 W output power and 400 V output average voltage, at 220 V Input RMS voltage and 50 kHz switching frequency.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

One of the important issues about using renewable energy is the integration of dispersed generation in the distribution networks. Previous experience has shown that the integration of dispersed generation can improve voltage profile in the network, decrease loss, etc. but can create safety and technical problems as well. This work report the application of the instantaneous space phasors and the instantaneous complex power in observing performances of the distribution networks with dispersed generators in steady state. New IEEE apparent power definition, the so-called Buchholz-Goodhue effective apparent power, as well as new proposed power quality (oscillation) index in the three-phase distribution systems with unbalanced loads and dispersed generators, are applied. Results obtained from several case studies using IEEE 34 nodes test network are presented and discussed. (C) 2006 Elsevier B.V. All rights reserved.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

This work presents an approach for geometric solution of an optimal power flow (OPF) problem for a two bus system (a slack and a PV busses). Additionally, the geometric relationship between the losses minimization and the increase of the reactive margin and, therefore, the maximum loading point, is shown. The algebraic equations for the calculation of the Lagrange multipliers and for the minimum losses value are obtained. These equations are used to validate the results obtained using an OPF program. (C) 2002 Elsevier B.V. B.V. All rights reserved.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

The parameterized fast decoupled power flow (PFDPF), versions XB and BX, using either theta or V as a parameter have been proposed by the authors in Part I of this paper. The use of reactive power injection of a selected PVbus (Q(PV)) as the continuation parameter for the computation of the maximum loading point (MLP) was also investigated. In this paper, the proposed versions obtained only with small modifications of the conventional one are used for the computation of the MLP of IEEE test systems (14, 30, 57 and 118 buses). These new versions are compared to each other with the purpose of pointing out their features, as well as the influence of reactive power and transformer tap limits. The results obtained with the new approaches are presented and discussed. The results show that the characteristics of the conventional FDPF method are enhanced and the region of convergence around the singular solution is enlarged. In addition, it is shown that these versions can be switched during the tracing process in order to efficiently determine all the PV curve points with few iterations. A trivial secant predictor, the modified zero-order polynomial, which uses the current solution and a fixed increment in the parameter (V, theta, or mu) as an estimate for the next solution, is used for the predictor step. (C) 2003 Elsevier B.V. All rights reserved.