813 resultados para Transit Planning
Resumo:
Many communities in Iowa have expressed a desire to develop a plan for better accommodating pedestrians and bicyclists in their community. This desire results from the recognition that walking and bicycling are popular recreational activities and, are increasingly important as “alternative transportation modes.” Recognizing the desire on the part of communities to create better conditions for bicycling and walking, the Iowa DOT developed this handbook as part of Iowa Trails 2000. This handbook outlines the steps and resources required to create a comprehensive system of bicycle and pedestrian facilities. Such a system can serve local needs and connect communities to the Iowa State Trails System and other regional attractions.
Resumo:
Reaudit report on the Ottumwa Transit Authority in the City of Ottumwa, Iowa for the period July 1, 2008 through June 30, 2009
Resumo:
This guide was created to aid communities in the process of smart planning and is organized around the 10 Smart Planning Principles signed into Iowa law in 2010. A general description of the concept, strategies for encouraging use, policy tools for implementation, and a current Iowa example are presented for each Principle. In addition, a brief list of resources is provided to help local governments, community organizations and citizen planners find information and ideas on community involvement and incorporation of smart planning concepts in every day decisions.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.
Resumo:
Audit report on the Heart of Iowa Regional Transit Agency, Des Moines, for the year ended June 30, 2010
Resumo:
The historically-reactive approach to identifying safety problems and mitigating them involves selecting black spots or hot spots by ranking locations based on crash frequency and severity. The approach focuses mainly on the corridor level without taking the exposure rate (vehicle miles traveled) and socio-demographics information of the study area, which are very important in the transportation planning process, into consideration. A larger study analysis unit at the Transportation Analysis Zone (TAZ) level or the network planning level should be used to address the needs of development of the community in the future and incorporate safety into the long-range transportation planning process. In this study, existing planning tools (such as the PLANSAFE models presented in NCHRP Report 546) were evaluated for forecasting safety in small and medium-sized communities, particularly as related to changes in socio-demographics characteristics, traffic demand, road network, and countermeasures. The research also evaluated the applicability of the Empirical Bayes (EB) method to network-level analysis. In addition, application of the United States Road Assessment Program (usRAP) protocols at the local urban road network level was investigated. This research evaluated the applicability of these three methods for the City of Ames, Iowa. The outcome of this research is a systematic process and framework for considering road safety issues explicitly in the small and medium-sized community transportation planning process and for quantifying the safety impacts of new developments and policy programs. More specifically, quantitative safety may be incorporated into the planning process, through effective visualization and increased awareness of safety issues (usRAP), the identification of high-risk locations with potential for improvement, (usRAP maps and EB), countermeasures for high-risk locations (EB before and after study and PLANSAFE), and socio-economic and demographic induced changes at the planning-level (PLANSAFE).
Resumo:
Iowa’s Rail Environment Iowa’s rail transportation system provides both freight and passenger service. Rail serves a variety of trips, including those within Iowa and those to other states as well as to foreign markets. While rail competes with other modes, it also cooperates with those modes to provide intermodal services to Iowans. In 2009 Iowa’s rail transportation system could be described as follows: Freight Iowa’s 130,000-mile freight transportation system includes an extensive railroad network, a well-developed highway system, two bordering navigable waterways, and a pipeline network as well as air cargo facilities. While rail accounts for only 3 percent of the freight network, it carries 43 percent of Iowa’s freight tonnage. A great variety of commodities ranging from fresh fish to textiles to optical products are moved by rail. However, most of the Iowa rail shipments consist of bulk commodities, including grain, grain products, coal, ethanol, and fertilizers. The railroad network performs an important role in moving bulk commodities produced and consumed in the state to local processors, livestock feeders, river terminals and ports for foreign export. The railroad’s ability to haul large volumes, long distances at low costs will continue to be a major factor in moving freight and improving the economy of Iowa. Key 2008 Facts • 3,945 miles of track • 18 railroads • 49.5 million tons shipped • 39.7 million tons received • 2 Amtrak routes • 6 Amtrak stations • 66,286 rail passenger rides Key Rail Trends • slightly fewer miles being operated; • railroads serving Iowa has remained the same; • more rail freight traffic; • more tons hauled per car; • higher average rail rates per ton-mile since 2002; • more car and tons hauled per locomotive; and • more ton miles per gallon of fuel consumed. Iowa’s rail system and service has been evolving over time relative to its size, financial conditions, and competition from other modes.
Resumo:
This handbook provides an overview of public transit in Iowa and how to do business with the Iowa Department of Transportation (Iowa DOT) Office of Public Transit (OPT). It is intended to be a tool to assist transit managers navigate through the many policies, procedures and requirements of state and federal government. This handbook can be used to provide orientation for new personnel; to help clarify the relationships and required procedures for existing personnel; and to provide easier accessibility to regulations and procedures. Input on the content of the handbook to increase its usefulness is encouraged at any time.
Resumo:
The role of rural demand-responsive transit is changing, and with that change is coming an increasing need for technology. As long as rural transit was limited to a type of social service transportation for a specific set of clients who primarily traveled in groups to common meal sites, work centers for the disabled, or clinics in larger communities, a preset calendar augmented by notes on a yellow legal pad was sufficient to develop schedules. Any individual trips were arranged at least 24 to 48 hours ahead of time and were carefully scheduled the night before in half-hour or twenty-minute windows by a dispatcher who knew every lane in the service area. Since it took hours to build the schedule, any last-minute changes could wreak havoc with the plans and raise the stress level in the dispatch office. Nevertheless, given these parameters, a manual scheduling system worked for a small demand-responsive operation.
Resumo:
The value of driving We as Americans - and especially as Iowans - value the independence of getting around in our own vehicles and staying connected with our families and communities. The majority of older Iowans enjoy a more active, healthy and longer life than previous generations. Freedom of mobility shapes our quality of life. With aging, driving becomes an increasing concern for older Iowans and their families. How we deal with changes in our driving ability and, eventually, choose when and how to retire from driving, will affect our safety and our quality of life.
Resumo:
This 2011 Annual Report further summarizes the work of the Commission during the last year and provides planning recommendations for the future of the Capitol Complex. Please note that Iowa Code Chapter 8A.373 provides that before any physical changes are made to the state capitol complex "it shall be the duty of the officers, commissions, and councils charged by law with the duty of determining such questions to call upon" the Capitol Planning Commission for advice. The Capitol Planning Commission members, as well as DAS Staff, welcome the opportunity to discuss future projects at the request of any legislator.
Resumo:
In Switzerland, the land management regime is characterized by a liberal attitude towards the institution of property rights, which is guaranteed by the Constitution. Under the present Swiss constitutional arrangement, authorities (municipalities) are required to take into account landowners' interests when implementing their spatial planning policy. In other words, the institution of property rights cannot be restricted easily in order to implement zoning plans and planning projects. This situation causes many problems. One of them is the gap between the way land is really used by the landowners and the way land should be used based on zoning plans. In fact, zoning plans only describe how landowners should use their property. There is no sufficient provision for handling cases where the use is not in accordance with zoning plans. In particular, landowners may not be expropriated for a non-conforming use of the land. This situation often leads to the opening of new building areas in greenfields and urban sprawl, which is in contradiction with the goals set into the Federal Law on Spatial Planning. In order to identify legal strategies of intervention to solve the problem, our paper is structured into three main parts. Firstly, we make a short description of the Swiss land management regime. Then, we focus on an innovative land management approach designed to implement zoning plans in accordance with property rights. Finally, we present a case study that shows the usefulness of the presented land management approach in practice. We develop three main results. Firstly, the land management approach brings a mechanism to involve landowners in planning projects. Coordination principle between spatial planning goals and landowners' interests is the cornerstone of all the process. Secondly, the land use is improved both in terms of space and time. Finally, the institution of property rights is not challenged, since there is no expropriation and the market stays free.
Resumo:
Abstract Electrical stimulation is a new way to treat digestive disorders such as constipation. Colonic propulsive activity can be triggered by battery operated devices. This study aimed to demonstrate the effect of direct electrical colonic stimulation on mean transit time in a chronic porcine model. The impact of stimulation and implanted material on the colonic wall was also assessed. Three pairs of electrodes were implanted into the caecal wall of 12 anaesthetized pigs. Reference colonic transit time was determined by radiopaque markers for each pig before implantation. It was repeated 4 weeks after implantation with sham stimulation and 5 weeks after implantation with electrical stimulation. Aboral sequential trains of 1-ms pulse width (10 V; 120 Hz) were applied twice daily for 6 days, using an external battery operated stimulator. For each course of markers, a mean value was computed from transit times obtained from individual pig. Microscopic examination of the caecum was routinely performed after animal sacrifice. A reduction of mean transit time was observed after electrical stimulation (19 +/- 13 h; mean +/- SD) when compared to reference (34 +/- 7 h; P = 0.045) and mean transit time after sham stimulation (36 +/- 9 h; P = 0.035). Histological examination revealed minimal chronic inflammation around the electrodes. Colonic transit time measured in a chronic porcine model is reduced by direct sequential electrical stimulation. Minimal tissue lesion is elicited by stimulation or implanted material. Electrical colonic stimulation could be a promising approach to treat specific disorders of the large bowel.