891 resultados para The 7pm Project
Resumo:
On June 26-27, 2006, 60 academic and industry scientists gathered during the PROSAFE workshop to discuss recommendations on taxonomy, antibiotic resistance, in vitro assessment of virulence and in vivo assessment of safety of probiotics used for human consumption. For identification of lactic acid bacteria (LAB) intended for probiotic use, it was recommended that conventional biochemical methods should be complemented with molecular methods and that these should be performed by an expert lab. Using the newly developed LAB Susceptibility test Medium (LSM), tentative epidemiological cut-off values were proposed. It was recommended that potentially probiotic strains not belonging to the wildtype distributions of relevant antimicrobials should not be developed as future products for human or animal consumption. Furthermore, it was recommended that the use of strains harbouring known and confirmed virulence genes should be avoided. Finally, for in vivo assessment of safety by investigating strain pathogenicity in animal models, the rat endocarditis model appeared to be the most reliable model tested in the PROSAFE project. Moreover, consensus was reached for approving the necessity of a human colonisation study in a randomised placebo-controlled double-blind design; however, further discussions are needed on the details of such as study.
Resumo:
Gastric cancer affects about one million people per year worldwide, being the second leading cause of cancer mortality. The study of its etiology remains therefore a global issue as it may allow the identification of major targets, besides eradication of Helicobacter pylori infection, for primary prevention. It has however received little attention, given its comparatively low incidence in most high-income countries. We introduce a consortium of epidemiological investigations named the 'Stomach cancer Pooling (StoP) Project'. Twenty-two studies agreed to participate, for a total of over 9000 cases and 23 000 controls. Twenty studies have already shared the original data set. Of the patients, 40% are from Asia, 43% from Europe, and 17% from North America; 34% are women and 66% men; the median age is 61 years; 56% are from population-based case-control studies, 41% from hospital-based ones, and 3% from nested case-control studies derived from cohort investigations. Biological samples are available from 12 studies. The aim of the StoP Project is to analyze the role of lifestyle and genetic determinants in the etiology of gastric cancer through pooled analyses of individual-level data. The uniquely large data set will allow us to define and quantify the main effects of each risk factor of interest, including a number of infrequent habits, and to adequately address associations in subgroups of the population, as well as interaction within and between environmental and genetic factors. Further, we will carry out separate analyses according to different histotypes and subsites of gastric cancer, to identify potential different risk patterns and etiological characteristics.
Resumo:
Lappeenrannan teknillisen korkeakoulun sähkötekniikan osasto muutti 1.8.2005 sähkötekniikan tutkinnon kaksiportaiseksi ja vastaamaan näin Bologna-prosessia ja Suomen yliopistolainsäädäntöä. Tutkinnonuudistuksen myötä osasto haluaa varmistaa sähkötekniikan tutkintojen laadun ja vertailtavuuden sekä parantaa opiskelijoidensekä henkilökunnan liikkuvuutta. Tutkintojen laatu ja vertailtavuus osoitetaan sähkötekniikan osaston benchmark-projektilla, jossa kerätään tietoja maisteri- ja tohtorintutkintoa tarjoavista eurooppalaisista yliopistoista. Diplomityö käsittää BM-projektin kolmannen vaiheen suunnittelun ja toteutuksen sisältäen teoriaa benchmark-projekteille tyypillisistä toimintatavoista. Hyväksi havaitut menetelmiä, kuten kyselyt ja matriisit, on tässä työssä otettu soveltuvin osin sähkötekniikan osaston BM-projektin työkaluiksi. Diplomityössä analysoidaan työkalujen avulla BM-kumppaneilta kerättyjä tietoja sekä esitetään ratkaisuja, miten sähkötekniikan osastolla voidaan jatkaa parhaiden toimintatapojen löytämistä.
Resumo:
This thesis focuses on integration in project business, i.e. how projectbased companies organize their product and process structures when they deliver industrial solutions to their customers. The customers that invest in these solutions run their businesses in different geographical, political and economical environments, which should be acknowledged by the supplier when providing solutions comprising of larger and more complex scopes than previously supplied to these customers. This means that the suppliers are increasing their supply range by taking over some of the activities in the value chain that have traditionally been handled by the customer. In order to be able to provide the functioning solutions, including more engineering hours, technical equipment and a wider project network, a change is needed in the mindset in order to be able to carry out and take the required responsibility that these new approaches bring. For the supplier it is important to be able to integrate technical products, systems and services, but the supplier also needs to have the capabilities to integrate the cross-functional organizations and departments in the project network, the knowledge and information between and within these organizations and departments, along with inputs from the customer into the product and process structures during the lifecycle of the project under development. Hence, the main objective of this thesis is to explore the challenges of integration that industrial projects meet, and based on that, to suggest a concept of how to manage integration in project business by making use of integration mechanisms. Integration is considered the essential process for accomplishing an industrial project, whereas the accomplishment of the industrial project is considered to be the result of the integration. The thesis consists of an extended summary and four papers, that are based on three studies in which integration mechanisms for value creation in industrial project networks and the management of integration in project business have been explored. The research is based on an inductive approach where in particular the design, commissioning and operations functions of industrial projects have been studied, addressing entire project life-cycles. The studies have been conducted in the shipbuilding and power generation industries where the scopes of supply consist of stand-alone equipment, equipment and engineering, and turnkey solutions. These industrial solutions include demanding efforts in engineering and organization. Addressing the calls for more studies on the evolving value chains of integrated solutions, mechanisms for inter- and intra-organizational integration and subsequent value creation in project networks have been explored. The research results in thirteen integration mechanisms and a typology for integration is proposed. Managing integration consists of integrating the project network (the supplier and the sub-suppliers) and the customer (the customer’s business purpose, operations environment and the end-user) into the project by making use of integration mechanisms. The findings bring new insight into research on industrial project business by proposing integration of technology and engineering related elements with elements related to customer oriented business performance in contemporary project environments. Thirteen mechanisms for combining products and the processes needed to deliver projects are described and categorized according to the impact that they have on the management of knowledge and information. These mechanisms directly relate to the performance of the supplier, and consequently to the functioning of the solution that the project provides. This thesis offers ways to promote integration of knowledge and information during the lifecycle of industrial projects, enhancing the development towards innovative solutions in project business.
Resumo:
Scrum is an agile project management approach that has been widely practiced in the software development projects. It has proven to increase quality, productivity, customer satisfaction, transparency and team morale among other benefits from its implementation. The concept of scrum is based on the concepts of incremental innovation strategies, lean manufacturing, kaizen, iterative development and so on and is usually contrasted with the linear development models such as the waterfall method in the software industry. The traditional approaches to project management such as the waterfall method imply intensive upfront planning and approval of the entire project. These sort of approaches work well in the well-defined stable environments where all the specifications of the project are known in the beginning. However, in the uncertain environments when a project requires continuous development and incorporation of new requirements, they do not tend to work well. The scrum framework was inspiraed by Nonaka’s article about new product developement and was later adopted by software development practitioners. This research explores conditions for and benefits of the application of scrum framework beyond software development projects. There are currently a few case studies on the scrum implementation in non-software projects, but there is a noticeable trend of it in the scrum practitioners’ community. The research is based on the real-life context multiple case study analysis of three different non-software projects. The results of the research showed that in order to succeed within scrum projects need to satisfy certain conditions – necessary and sufficient. Among them the key factors are uncertainty of the project environment, not well defined outcomes, commitment of the scrum teams and management support. The top advantages of scrum implementation identified in the present research include improved transparency, accountability, team morale, communications, cooperation and collaboration. Further researches are advised to be carried out in order to validate these findings on a larger sample and to focus on more specific areas of scrum project management implementation.
Resumo:
Presentation at Open Repositories 2014, Helsinki, Finland, June 9-13, 2014
Resumo:
The management of a public sector project is analysed using a model developed from systems theory. Linear responsibility analysis is used to identify the primary and key decision structure of the project and to generate quantitative data regarding differentiation and integration of the operating system, the managing system and the client/project team. The environmental context of the project is identified. Conclusions are drawn regarding the project organization structure's ability to cope with the prevailing environmental conditions. It is found that the complexity of the managing system imposed on the project was unable to achieve this and created serious deficiencies in the outcome of the project.
Resumo:
The UK construction industry is in the process of trying to adopt a new culture based on the large-scale take up of innovative practices. Through the Demonstration Project process many organizations are implementing changed practices and learning from the experiences of others. This is probably the largest experiment in innovation in any industry in recent times. The long-term success will be measured by the effectiveness of embedding the new practices in the organization. As yet there is no recognized approach to measuring the receptivity of the organization to the innovation process as an indication of the likelihood of long-term development. The development of an appropriate approach is described here. Existing approaches to the measurement of the take up of innovation were reviewed and where appropriate used as the base for the development of a questionnaire. The questionnaire could be applicable to multi-organizational construction project situations such that the output could determine an individual organization's innovative practices via an innovation scorecard, a project team's approach or it could be used to survey a wide cross-section of the industry.
Resumo:
Sea surface temperature (SST) measurements are required by operational ocean and atmospheric forecasting systems to constrain modeled upper ocean circulation and thermal structure. The Global Ocean Data Assimilation Experiment (GODAE) High Resolution SST Pilot Project (GHRSST-PP) was initiated to address these needs by coordinating the provision of accurate, high-resolution, SST products for the global domain. The pilot project is now complete, but activities continue within the Group for High Resolution SST (GHRSST). The pilot project focused on harmonizing diverse satellite and in situ data streams that were indexed, processed, quality controlled, analyzed, and documented within a Regional/Global Task Sharing (R/GTS) framework implemented in an internationally distributed manner. Data with meaningful error estimates developed within GHRSST are provided by services within R/GTS. Currently, several terabytes of data are processed at international centers daily, creating more than 25 gigabytes of product. Ensemble SST analyses together with anomaly SST outputs are generated each day, providing confidence in SST analyses via diagnostic outputs. Diagnostic data sets are generated and Web interfaces are provided to monitor the quality of observation and analysis products. GHRSST research and development projects continue to tackle problems of instrument calibration, algorithm development, diurnal variability, skin temperature deviation, and validation/verification of GHRSST products. GHRSST also works closely with applications and users, providing a forum for discussion and feedback between SST users and producers on a regular basis. All data within the GHRSST R/GTS framework are freely available. This paper reviews the progress of GHRSST-PP, highlighting achievements that have been fundamental to the success of the pilot project.
Resumo:
Many construction professionals and policy-makers would agree that client expectations should be accommodated during a building project. However, this aspiration is not easy to deal with as there may be conflicting interests within a client organization and these may change over time in the course of a project. This research asks why some client interests, and not others, are incorporated into the development of a building project. Actor-Network Theory (ANT) is used to study a single building project on a University campus. The building project is analysed as a number of discussions and negotiations, in which actors persuade each other to choose one solution over another. The analysis traces dynamic client engagement in decision-making processes as available options became increasingly constrained. However, this relative loss of control was countered by clients who continued the control over the timing of participants' involvement, and thus the way to impose their interests even at the later stage of the project.
Resumo:
In this work, the diurnal evolution of the radiation balance components over the tropical Atlantic Ocean is described and analysed. The analysis is based on measurements carried Out on board a Brazilian Navy ship during the observational campaign of the FluTuA Project (`Fluxos Turbulentos sobre o Atlantico`), from 15 to 23 May 2002. The observations indicated that the albedo responds its expected to atmospheric attenuation effects with a diurnal evolution similar to the Fresnel albedo. In general, the observed longwave radiation values agreed better with the estimated values obtained without longwave reflection. In agreement with the literature, the average surface emissivity was around 0.97. The net radiation, estimated from published equations for albedo, atmospheric transmissivity and surface emissivity, agreed with the observations, indicating that these parameters are representative of the radiometric properties of the air-sea interface in the region between Natal (6 degrees S, 35.2 degrees W) and the Sao Pedro and Sao Paulo Archipelago (1 degrees N, 29.3 degrees W). Copyright (C) 2008 Royal Meteorological Society
Resumo:
As globalization increases integration, a new playing field is emerging which is driving the need for operational efficiencies and alignment of complementary capabilities among countries to build sustainable models and integrated offerings. As demands increase, companies are turning to effective project management as means to control operations and countries are increasing the amount of mega projects to boost their competitiveness and global footprint. Given the scale, complexity, political nature, multicultural makeup, and high level of visibility; mega projects rely on successful stakeholder management to effectively manage its operational, tactical, and strategic levels to execute their mission. This paper examines the success drivers of mega projects and presents an in depth stakeholder assessment of the Panama Canal Expansion mega project to identify the perceived value to its stakeholder community. The stakeholder categories include: the Panama Canal Authority, subcontractors executing the expansion project, customers of the canal in Panama and U.S., as well as the communities surrounding the Panama Canal and ports in the U.S. East Coast. The conclusion of this paper captures the relationship between the effective stakeholder engagement from the Panama Canal Authority, the perceived value of the Panamanian stakeholders, and compares it to U.S. based mega projects being executed simultaneously to allow the U.S. East Coast ports to accommodate increased cargo volumes.
Resumo:
The human buccal micronucleus cytome assay (BMCyt) is one of the most widely used techniques to measure genetic damage in human population studies. Reducing protocol variability, assessing the role of confounders, and estimating a range of reference values are research priorities that will be addressed by the HUMNXL, collaborative study. The HUMNXL, project evaluates the impact of host factors, occupation, life-style, disease status, and protocol features on the occurrence of MN in exfoliated buccal cells. In addition, the study will provide a range of reference values for all cytome endpoints. A database of 5424 subjects with buccal MN values obtained from 30 laboratories worldwide was compiled and analyzed to investigate the influence of several conditions affecting MN frequency. Random effects models were mostly used to investigate MN predictors. The estimated spontaneous MN frequency was 0.74 parts per thousand (95% CI 0.52-1.05). Only staining among technical features influenced MN frequency, with an abnormal increase for non-DNA-specific stains. No effect of gender was evident, while the trend for age was highly significant (p < 0.001). Most occupational exposures and a diagnosis of cancer significantly increased MN and other endpoints frequencies. MN frequency increased in heavy smoking (>= 40 cig/day. FR = 1.37:95% CI 1.03-.82) and decreased with daily fruit consumption (FR = 0.68; 95% CI 0.50-0.91). The results of the HUMNXL, project identified priorities for validation studies, increased the basic knowledge of the assay, and contributed to the creation of a laboratory network which in perspective may allow the evaluation of disease risk associated with MN frequency. (C) 2011 Elsevier B.V. All rights reserved.
Resumo:
This edition of the FAL Bulletin analyses the activities performed by ECLAC and the Mesoamerica Project related to issues linked to infrastructure services, particularly with regards to the physical integration, facilitation and operation of multimodal services in Central America.
Resumo:
Based on a study conducted in Ribeirao Preto, SP, Brazil in extra-hospital mental health services that addressed the organization of these services, therapeutic projects and the inclusion of psychosocial rehabilitation in health actions available, a theoretical-critical reflection concerning the development process of the therapeutic projects by the services' teams is presented. The qualitative study was conducted in an outpatient clinic and a Psychosocial Care Center. Data were collected through semi-structured interviews and focal groups. Data analysis was based on the hermeneutic dialectic philosophy of Jurgen Habermas according to the techniques of reconstruction and interpretation. Data analysis revealed that professionals have difficulty developing and managing therapeutic projects. Health actions are made available without being concretely supported by a proposal guiding the service's practical activities. The therapeutic projects are referred by professionals as the result of guidelines provided by management levels or technical orientations inherent to each profession but not as an activity that represents a philosophy of work of the health team. When the therapeutic project is focused on as a type of consensus that results from a communicative action directed to a mutual and intersubjective understanding among the members of the mental health extra-hospital team, the difficulties of the services' team dialogically organizing themselves to collectively construct the therapeutic project is evidenced.