916 resultados para Power Systems, Load Model, Indentification
Resumo:
Distributed generation unlike centralized electrical generation aims to generate electrical energy on small scale as near as possible to load centers, interchanging electric power with the network. This work presents a probabilistic methodology conceived to assist the electric system planning engineers in the selection of the distributed generation location, taking into account the hourly load changes or the daily load cycle. The hourly load centers, for each of the different hourly load scenarios, are calculated deterministically. These location points, properly weighted according to their load magnitude, are used to calculate the best fit probability distribution. This distribution is used to determine the maximum likelihood perimeter of the area where each source distributed generation point should preferably be located by the planning engineers. This takes into account, for example, the availability and the cost of the land lots, which are factors of special relevance in urban areas, as well as several obstacles important for the final selection of the candidates of the distributed generation points. The proposed methodology has been applied to a real case, assuming three different bivariate probability distributions: the Gaussian distribution, a bivariate version of Freund’s exponential distribution and the Weibull probability distribution. The methodology algorithm has been programmed in MATLAB. Results are presented and discussed for the application of the methodology to a realistic case and demonstrate the ability of the proposed methodology for efficiently handling the determination of the best location of the distributed generation and their corresponding distribution networks.
Resumo:
Dissertação para a obtenção do grau de Mestre em Engenharia Electrotécnica Ramo de Energia
Resumo:
Dissertação para a obtenção do grau de Mestre em Engenharia Electrotécnica Ramo de Automação e Electrónica Industrial
Resumo:
Dissertação para a obtenção do grau de Mestre em Engenharia Electrotécnica - Ramo de Energia
Resumo:
As it is well known, competitive electricity markets require new computing tools for generation companies to enhance the management of its resources. The economic value of the water stored in a power system reservoir is crucial information for enhancing the management of the reservoirs. This paper proposes a practical deterministic approach for computing the short-term economic value of the water stored in a power system reservoir, emphasizing the need to considerer water stored as a scarce resource with a short-term economic value. The paper addresses a problem concerning reservoirs with small storage capacities, i.e., the reservoirs considered as head-sensitivity. More precisely, the respective hydro plant is head-dependent and a pure linear approach is unable to capture such consideration. The paper presents a case study supported by the proposed practical deterministic approach and applied on a real multi-reservoir power system with three cascaded reservoirs, considering as input data forecasts for the electric energy price and for the natural inflow into the reservoirs over the schedule time horizon. The paper presents various water schedules due to different final stored water volume conditions on the reservoirs. Also, it presents the respective economic value of the water for the reservoirs at different stored water volume conditions.
Resumo:
A alta e crescente participação da energia eólica na matriz da produção traz grandes desafios aos operadores do sistema na gestão da rede e planeamento da produção. A incerteza associada à produção eólica condiciona os processos de escalonamento e despacho económico dos geradores térmicos, uma vez que a produção eólica efetiva pode ser muito diferente da produção prevista. O presente trabalho propõe duas metodologias de otimização do escalonamento de geradores térmicos baseadas em Programação Inteira Mista. Pretende-se encontrar soluções de escalonamento que minimizem as influências negativas da integração de energia eólica no sistema elétrico. Inicialmente o problema de escalonamento de geradores é formulado sem considerar a integração da energia eólica. Posteriormente foi considerada a penetração da energia eólica no sistema elétrico. No primeiro modelo proposto, o problema é formulado como um problema de otimização estocástico. Nesta formulação todos os cenários de produção eólica são levados em consideração no processo de otimização. No segundo modelo, o problema é formulado como um problema de otimização determinística. Nesta formulação, o escalonamento é feito para cada cenário de produção eólica e no fim determina-se a melhor solução por meio de indicadores de avaliação. Foram feitas simulações para diferentes níveis de reserva girante e os resultados obtidos mostraram que a alta participação da energia eólica na matriz da produção põe em causa a segurança e garantia de produção devido às características volátil e intermitente da produção eólica e para manter os mesmos níveis de segurança é preciso dispor no sistema de capacidade reserva girante suficiente capaz de compensar os erros de previsão.
Resumo:
The integration of large amounts of wind energy in power systems raises important operation issues such as the balance between power demand and generation. The pumped storage hydro (PSH) units are seen as one solution for this issue, avoiding the need for wind power curtailments. However, the behavior of a PSH unit might differ considerably when it operates in a liberalized market with some degree of market power. In this regard, a new approach for the optimal daily scheduling of a PSH unit in the day-ahead electricity market was developed and presented in this paper, in which the market power is modeled by a residual inverse demand function with a variable elasticity. The results obtained show that increasing degrees of market power of the PSH unit correspond to decreasing levels of storage and, therefore, the capacity to integrate wind power is considerably reduced under these circumstances.
Resumo:
The operation of generalized Marx-type solid-state bipolar modulators is discussed and compared with simplified Marx-derived circuits, to evaluate their capability to deal with various load conditions. A comparative analysis on the number of switches per cell, fiber optic trigger count, losses, and switch hold-off voltages has been made. A circuit topology is obtained as a compromise in terms of operating performance, trigger simplicity, and switching losses. A five-stage laboratory prototype of this circuit has been assembled using 1200 V insulated gate bipolar transistors (IGBTs) and diodes, operating with 1000 V dc input voltage and 1 kHz frequency, giving 5 kV bipolar pulses, with 2.5 mu s pulse width and 5 mu s relaxation time into resistive, capacitive, and inductive loads.
Resumo:
Nesta dissertação, é realizado o estudo e parametrização dos relés de proteção para geradores e transformadores de grupo de uma central hidroelétrica. É efetuada, também, uma breve abordagem à manutenção e ensaio dos respetivos relés. No fornecimento de Energia Elétrica aos seus consumidores, deve-se ter em consideração todo o funcionamento do Sistema Elétrico de Energia (SEE). Como os SEE são projetados para gerar energia elétrica para responder à carga, é necessário garantir que este assegure o fornecimento de energia elétrica com elevados padrões de qualidade e continuidade de serviço. Assim, as proteções revelam, um papel fulcral na garantia da continuidade de serviço. As proteções são constituídas por equipamentos de proteção nomeadamente, relés de proteção, que são dispositivos cuja função é retirar de serviço os equipamentos em defeito, permitindo que o restante sistema elétrico seja alimentado. Os sistemas de proteção são, assim, de extrema importância, já que têm como função, assegurar, garantir e eliminar anomalias evitando danos nos equipamentos e nos utilizadores/consumidores.
Resumo:
Recent changes in the operation and planning of power systems have been motivated by the introduction of Distributed Generation (DG) and Demand Response (DR) in the competitive electricity markets' environment, with deep concerns at the efficiency level. In this context, grid operators, market operators, utilities and consumers must adopt strategies and methods to take full advantage of demand response and distributed generation. This requires that all the involved players consider all the market opportunities, as the case of energy and reserve components of electricity markets. The present paper proposes a methodology which considers the joint dispatch of demand response and distributed generation in the context of a distribution network operated by a virtual power player. The resources' participation can be performed in both energy and reserve contexts. This methodology contemplates the probability of actually using the reserve and the distribution network constraints. Its application is illustrated in this paper using a 32-bus distribution network with 66 DG units and 218 consumers classified into 6 types of consumers.
Resumo:
This paper presents a coordination approach to maximize the total profit of wind power systems coordinated with concentrated solar power systems, having molten-salt thermal energy storage. Both systems are effectively handled by mixed-integer linear programming in the approach, allowing enhancement on the operational during non-insolation periods. Transmission grid constraints and technical operating constraints on both systems are modeled to enable a true management support for the integration of renewable energy sources in day-ahead electricity markets. A representative case study based on real systems is considered to demonstrate the effectiveness of the proposed approach. © IFIP International Federation for Information Processing 2015.
Resumo:
Com o aumento do preço da eletricidade e o fim dos combustíveis fósseis, associados à necessidade de Portugal reduzir a sua dependência energética do exterior, provoca a necessidade urgente de apostar nas energias renováveis. Perante este cenário, e assumindo que o custo da fatura energética, é para as empresas portuguesas um fator cada vez mais determinante para serem competitivas, devido aos aumentos consecutivos da energia nos últimos anos, bem como, a subida do imposto de valor acrescentado (IVA) de 6% para 23%. Outro aspeto importante é a eficiência energética como instrumento para reduzir os consumos de eletricidade. Com estas duas medidas: utilização de energias renováveis e o aumento da eficiência energética, são extremamente importantes para a redução da produção dos gases de efeito estufa (GEE). Consequentemente, as empresas terão de investir na produção da própria energia a partir de fontes renováveis, de modo a proporcionar um desenvolvimento sustentável, associado à redução da fatura energética. Esta dissertação propõe o dimensionamento de um sistema híbrido composto por tecnologia fotovoltaica e eólica, com e sem armazenamento de energia em baterias, adequado para reduzir uma parte dos consumos de uma empresa enquadrada no sector dos plásticos. O dimensionamento deste sistema, foi efetuado com recurso à caracterização dos consumos da empresa através da recolha de dados e leituras no local da instalação. Paralelamente, foi efetuada uma pesquisa em diversos fabricantes, de modo a identificar qual o sistema mais indicado a adotar, considerando painéis fotovoltaicos, turbinas eólicas, inversores e baterias. Com base nos dados recolhidos na empresa e referentes ao potencial eólico e solar para o distrito do Porto, em conjunto com as características técnicas dos equipamentos selecionados, foi delineado o sistema híbrido utilizando para o efeito um software de simulação e otimização de sistemas híbridos, denominado Hybrid Optimization Model for Eletric Renewable (HOMER). São apresentadas várias simulações para as diversas configurações escolhidas e estudos comparativos entre si, com o objetivo de reduzir o consumo de eletricidade da rede. Adicionalmente, foram realizadas duas configurações apenas com tecnologia fotovoltaica, de modo a efetuar uma análise comparativa entre um sistema híbrido e outro apenas com uma fonte renovável. Os resultados apresentados focaram-se no desempenho diário, mensal e anual, bem como, a produção individual de cada tecnologia evidenciada. Por último, procedeu-se ao estudo da viabilidade técnico-económica das configurações.
Resumo:
The intensive use of distributed generation based on renewable resources increases the complexity of power systems management, particularly the short-term scheduling. Demand response, storage units and electric and plug-in hybrid vehicles also pose new challenges to the short-term scheduling. However, these distributed energy resources can contribute significantly to turn the shortterm scheduling more efficient and effective improving the power system reliability. This paper proposes a short-term scheduling methodology based on two distinct time horizons: hour-ahead scheduling, and real-time scheduling considering the point of view of one aggregator agent. In each scheduling process, it is necessary to update the generation and consumption operation, and the storage and electric vehicles status. Besides the new operation condition, more accurate forecast values of wind generation and consumption are available, for the resulting of short-term and very short-term methods. In this paper, the aggregator has the main goal of maximizing his profits while, fulfilling the established contracts with the aggregated and external players.
Resumo:
The power systems operation in the smart grid context increases significantly the complexity of their management. New approaches for ancillary services procurement are essential to ensure the operation of electric power systems with appropriate levels of stability, safety, quality, equity and competitiveness. These approaches should include market mechanisms which allow the participation of small and medium distributed energy resources players in a competitive market environment. In this paper, an energy and ancillary services joint market model used by an aggregator is proposed, considering bids of several types of distributed energy resources. In order to improve economic efficiency in the market, ancillary services cascading market mechanism is also considered in the model. The proposed model is included in MASCEM – a multi-agent system electricity market simulator. A case study considering a distribution network with high penetration of distributed energy resources is presented.
Resumo:
The reactive power management in distribution network with large penetration of distributed energy resources is an important task in future power systems. The control of reactive power allows the inclusion of more distributed recourses and a more efficient operation of distributed network. Currently, the reactive power is only controlled in large power plants and in high and very high voltage substations. In this paper, several reactive power control strategies considering a smart grids paradigm are proposed. In this context, the management of distributed energy resources and of the distribution network by an aggregator, namely Virtual Power Player (VPP), is proposed and implemented in a MAS simulation tool. The proposed methods have been computationally implemented and tested using a 32-bus distribution network with intensive use of distributed resources, mainly the distributed generation based on renewable resources. Results concerning the evaluation of the reactive power management algorithms are also presented and compared.