978 resultados para Money management
Resumo:
The case study of Lusoponte illustrates the concession awarded by the Portuguese Government to finance, design, build and operate two bridges over the Tagus in Lisbon, Portugal. It includes an overview of the project's background and an analysis of the main risk categories stating both the actual risks encountered and the mitigation measures adopted. Throughout the project a great attention was given to whole life cycle costs, and gains in efficiency and cost control. Among the lessons that can be learned from both the public and private sector is that a complete risk management analysis must include not only the technical factors but also a realistic assessment of environmental and social risks. These were the risks that were somewhat overseen and that caused the main problems to the project's development.
Resumo:
Over the past decade there have been a large number of significant innovations in manufacturing which have resulted in more flexible and cost efficient methods and higher quality products, as manufacturers have set about upgrading their processes, systems and performance. This study compares the use of technologies and improvement programs between OECD and Non-OECD countries, and also between small and large firms, and examines differences in the use and outcomes across the economies and different sized firms. The empirical analysis provides an opportunity to test whether the ‘capabilities’ or strengths of a firm can be linked to these activities and examines if developing economies are using technology or management programs such as quality management and business process re-engineering to catch up to manufacturers in developed economies. The analysis utilises data from the second International Manufacturing Strategy Survey (IMSS), which encompasses 703 firms in 23 countries.
Resumo:
an initial public offering, the choices made by issuers, such as the offer price, might not appear to be wealth maximizing. In this article, we argue that the choices are strategic. Based on the model developed by Barry (1989), we show that the average change in the issuer's wealth (4.52 per cent) is lower than the average loss implied by underpricing (12.09 per cent). Our results support the notion that the choices issuers make at the offering generate a compensatory benefit in the aftermarket. That the issuer may well not suffer a net wealth loss from the offering is in accordance with continued initial public offering activity.
Resumo:
Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are “strategic benefits” for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value – This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.
Resumo:
Building project management requires effective coordination and collaboration between multiple project members. It can be achieved through real time communication flow between all. In present scenario, it can be achieved through adoption of Information and Communication Technologies (ICT). Construction industry primarily comprises small and medium enterprises (SMEs). Also, ICT adoption has been slow in the industry.---------- Research is required to assess the factors that affect ICT adoption at the three levels of industry, organization and people, with focus on SMEs. This paper discusses a component of the research undertaken to study these factors and issues in the context of Indian construction industry. A questionnaire survey was conducted and through quantitative data analysis the extent of adoption of formal Project Management processes, ICT adoption for these processes and factors including perception based factors affecting ICT adoption were studied. Results of data analysis includes identification of issues that require action at the three study levels.---------- The results can be generalized for other countries with due considerations, specifically for countries where the construction industry is similar to Indian construction industry in terms of working methodologies or for large countries.
Resumo:
This paper analyzes the common factor structure of US, German, and Japanese Government bond returns. Unlike previous studies, we formally take into account the presence of country-specific factors when estimating common factors. We show that the classical approach of running a principal component analysis on a multi-country dataset of bond returns captures both local and common influences and therefore tends to pick too many factors. We conclude that US bond returns share only one common factor with German and Japanese bond returns. This single common factor is associated most notably with changes in the level of domestic term structures. We show that accounting for country-specific factors improves the performance of domestic and international hedging strategies.
Resumo:
Much of the focus of research on patients with chest pain is directed at technological advances in the diagnosis and management of acute coronary syndrome (ACS), pulmonary embolism (PE), and acute aortic dissection (AAD), despite there being no significant difference at 4 years as regards mortality, ongoing chest pain, and quality of life between patients presenting to the emergency department with noncardiac chest pain and those with cardiac chest pain. This article examines future developments in the diagnosis and management of patients with suspected ACS, PE, AAD, gastrointestinal disease, and musculoskeletal chest pain.
Resumo:
Local governments are service driven rather than asset driven. Understanding this distinction is critical to ensuring that community needs are appropriately addressed. Translating community needs and desires into infrastructure is a complex yet little understood process. In this paper, we look at two case studies that explore the interface between service outcomes and the specification of performance requirements for the assets. The two case studies we look at are: a public health issue resulting from inadequate public amenities in a beach resort and the prioritisation of maintenance work in a world of increasing service demands and declining funding. The case studies all use the same investment logic mapping framework to establish clear drivers as to the problem that councils are responding to in delivering their services. The key to the framework is the separation of concern between service management and asset management.
Resumo:
This Report, prepared for Smart Service Queensland (“SSQ”), addresses legal issues, areas of risk and other factors associated with activities conducted on three popular online platforms—YouTube, MySpace and Second Life (which are referred to throughout this Report as the “Platforms”). The Platforms exemplify online participatory spaces and behaviours, including blogging and networking, multimedia sharing, and immersive virtual environments.
Resumo:
Accessibility to housing for low to moderate income groups in Australia has been experiencing a severe decline since 2001. On the supply side, the public sector has been reducing its commitment to the direct provision of public housing. Despite high demand for affordable housing, there has been limited supply generated by non-government housing providers. One possible solution to promote an increase in affordable housing supply, like other infrastructure, is through the development of multi-stakeholder partnerships and private financing. This research aims to identify current issues underlying decision-making criteria for building multi-stakeholder partnerships to deliver affordable housing projects. It also investigates strategies for minimising risk and ensuring the financial outcomes of these partnership arrangements. A mix of qualitative in-depth interviews and quantitative surveys has been used as the main method to explore stakeholder experiences regarding their involvement in partnership arrangements in the affordable housing sector in Queensland. Two sets of interviews were conducted following an exploratory pilot study: one set in 2003-2004 and the other in 2007-2008. There were nineteen respondents representing government, private and not-for-profit organisations in the first stage interviews and surveys. The second stage interviews were focussed on twenty-two housing providers in South East Queensland. Initial analyses have been conducted using thematic and statistical analyses. This study extends the use of existing decision making tools and combines the use of a Soft System Framework to analyse the ideal state questionnaires using qualitative thematic analysis. Soft System Methodology (SSM) has been used to analyse this unstructured complex problem by using systematic thinking to develop a conceptual model and carrying it to the real world situations to solve the problem. This research found that the diversity of stakeholder capability and their level of risk acceptance will allow partnerships to develop the best synergies and a degree of collaboration which achieves the required financial return within acceptable risk parameters. However, some of the negativity attached to future commitment to such partnerships has been found to be the anticipation of a worse outcome than that expected from independent action. Many interviewees agree that housing providers' fear of financial risk and community rejection has been central to dampening their enthusiasm for entering such investment projects. The creation of a mixed-use development structure will mitigate both risk and return as the commercial income will subsidise the affordable housing development and will normalise concentration of marginalised low-income people who live in a prime location with an award winning design. In addition, tenant support schemes and rent-to-buy incentive programs will encourage them to secure their tenancies and significantly reduce the risk of rent arrears and property damage. There is also a breakthrough investment vehicle offered by the social developer which sells the non-physical but financial product to individual and institutional investors to mitigate further financial risk. Finally, this study recommends modification of the current value-for-money framework in favour of broader partnership arrangements which are more closely aligned with risk minimisation strategies.
Resumo:
Alzaid et al. proposed a forward & backward secure key management scheme in wireless sensor networks for Process Control Systems (PCSs) or Supervisory Control and Data Acquisition (SCADA) systems. The scheme, however, is still vulnerable to an attack called the sandwich attack that can be launched when the adversary captures two sensor nodes at times t1 and t2, and then reveals all the group keys used between times t1 and t2. In this paper, a fix to the scheme is proposed in order to limit the vulnerable time duration to an arbitrarily chosen time span while keeping the forward and backward secrecy of the scheme untouched. Then, the performance analysis for our proposal, Alzaid et al.’s scheme, and Nilsson et al.’s scheme is given.
Resumo:
This paper outlines how the Ortelia project’s 3D virtual reality models have the capacity to assist our understanding of sites of cultural heritage. The VR investigation of such spaces can be a valuable tool in 'real world' empirical research in theatre and spatiality. Through a demonstration of two of Ortelia's VR models (an art gallery and a theatre), we suggest how we might consider interpreting cultural space and sites as contributing significantly to cultural capital. We also introduce the potential for human interaction in such venues through motion-capture to discuss the potential for assessing how humans interact in such contexts.
Resumo:
New air traffic automated separation management concepts are constantly under investigation. Yet most of the automated separation management algorithms proposed over the last few decades have assumed either perfect communication or exact knowledge of all aircraft locations. In realistic environments, these idealized assumptions are not valid and any communication failure can potentially lead to disastrous outcomes. This paper examines the separation performance behavior of several popular algorithms during periods of information loss. This comparison is done through simulation studies. These simulation studies suggest that communication failure can cause the performance of these separation management algorithms to degrade significantly. This paper also describes some preliminary flight tests.