989 resultados para Illinois. Office of Rehabilitation Services


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Description based on: 16th annual revision (1964)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cover title.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"A product of the Critical Trends Assessment Program (CTAP) and the Ecosystems Program of the Illinois Department of Natural Resources (IDNR)"--P. [2] of cover.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Statement of responsibility from P. [3] of cover.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Description based on: June 1994; title from cover.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Title from cover.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Funded by Part B, Education of the handicapped (Public law 94-142).

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cover title: Long term care facilities issues : past, present, future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Issue for 1923 also in rev. ed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Bibliography: p. 135-136.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"During the 1996 spring session, the General Assembly passed and the Governor signed landmark legislation creating a Department of Human Services (DHS) effective July 1, 1997. The new department consolidates three human services departments in their entirety : Department of Alcoholism and Substance Abuse (DASA) - Department of Rehabilitation Services (DORS) - Department of Mental Health and Developmental Disabilities (DMH/DD)."

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Report by the Illinois Office of Water Resources on Phases III & IV of a flood hazard mitigation project in Rosemont, Illinois. Phase III of the Willow-Higgins Flood Mitigation Project consists of widening and improving a 340-foot reach of Willow-Higgins Creek upstream of River Road. The improvement will include the replacement of 340 lineal feet of vertical floodwall along both sides of Willow-Higgins Creek. Phase IV of the Willow-Higgins Flood Mitigation Project consists of widening and improving a reach of Willow-Higgins Creek between the downstream end of Phase II, which is 2565 feet downstream of Higgins Road, and Granville Road; and also between Willow Creek Road and a point 160 feet downstream of Willow Creek Road. The improvement will include placement of 2200 lineal feet of vertical floodwall along the north side of Willow-Higgins Creek and 160 feet of vertical floodwall along both sides of Willow-Higgins Creek downstream of Willow Creek Road.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"OWR/SPR/98-001"

Relevância:

100.00% 100.00%

Publicador:

Resumo:

"The Illinois Department of Natural Resources/Office of Water Resources (OWR) is cooperating with the Village of Davis Junction to construct a flood control project under the authority of the Flood Control Act of 1945, 615 ILCS 15 (1996 State Bar Edition)."--Leaf 1.