933 resultados para Construction industry Environmental aspects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Comfort is, in essence, satisfaction with the environment, and with respect to the indoor environment it is primarily satisfaction with the thermal conditions and air quality. Improving comfort has social, health and economic benefits, and is more financially significant than any other building cost. Despite this, comfort is not strictly managed throughout the building lifecycle. This is mainly due to the lack of an appropriate system to adequately manage comfort knowledge through the construction process into operation. Previous proposals to improve knowledge management have not been successfully adopted by the construction industry. To address this, the BabySteps approach was devised. BabySteps is an approach, proposed by this research, which states that for an innovation to be adopted into the industry it must be implementable through a number of small changes. This research proposes that improving the management of comfort knowledge will improve comfort. ComMet is a new methodology proposed by this research that manages comfort knowledge. It enables comfort knowledge to be captured, stored and accessed throughout the building life-cycle and so allowing it to be re-used in future stages of the building project and in future projects. It does this using the following: Comfort Performances – These are simplified numerical representations of the comfort of the indoor environment. Comfort Performances quantify the comfort at each stage of the building life-cycle using standard comfort metrics. Comfort Ratings - These are a means of classifying the comfort conditions of the indoor environment according to an appropriate standard. Comfort Ratings are generated by comparing different Comfort Performances. Comfort Ratings provide additional information relating to the comfort conditions of the indoor environment, which is not readily determined from the individual Comfort Performances. Comfort History – This is a continuous descriptive record of the comfort throughout the project, with a focus on documenting the items and activities, proposed and implemented, which could potentially affect comfort. Each aspect of the Comfort History is linked to the relevant comfort entity it references. These three components create a comprehensive record of the comfort throughout the building lifecycle. They are then stored and made available in a common format in a central location which allows them to be re-used ad infinitum. The LCMS System was developed to implement the ComMet methodology. It uses current and emerging technologies to capture, store and allow easy access to comfort knowledge as specified by ComMet. LCMS is an IT system that is a combination of the following six components: Building Standards; Modelling & Simulation; Physical Measurement through the specially developed Egg-Whisk (Wireless Sensor) Network; Data Manipulation; Information Recording; Knowledge Storage and Access.Results from a test case application of the LCMS system - an existing office room at a research facility - highlighted that while some aspects of comfort were being maintained, the building’s environment was not in compliance with the acceptable levels as stipulated by the relevant building standards. The implementation of ComMet, through LCMS, demonstrates how comfort, typically only considered during early design, can be measured and managed appropriately through systematic application of the methodology as means of ensuring a healthy internal environment in the building.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The thesis presents a comparison of the national energy policies of the Federal Republic of Germany and Canada from 1973 until the late 1980s. The purpose of this paper is to analyze whether economic and/or environmental concerns were responsible for changes in the· West-German and Canadian national energy policies. Furthermore, the feasibility of implementing a soft energy path in West-Germany and Canada is examined. For better comprehension of the policy-making process and implemented changes in the national energy policies of the two states, the West-German and Canadian parliamentary systems and the political cultures were compared. For the analysis, several events with international impact were taken as guidelines. Furthermore, based on statistical data, the West-German and Canadian energy production and consumption were analyzed. With reference to these results the degree of the de facto changes in the national energy policies were analyzed. In addition, the thesis discusses the possibilities which a soft energy path offers to both national governments to renounce themselves from the dependencies on a few energy resources. The thesis reveals that changes in the West-German and Canadian national energy policies, in their energy production and consumption are correlated to various world events. In particular, governmental reponses security of energy supply by the two international oil crises of 1973 and 1979/1980 demonstrate that changes in the West-German and Canadian national energy policies were implemented in reaction to economic concerns than environmental ones. With the policies "away from oil" and "off oil", the West-German and Canadian government implemented the i i substitution of oil through various diverse energy supply resources. However, energy savings concepts and policies were initiated through the first oil crisis in 1973. The world recessions in 1975 and 1982 had no 'profound impacts on the agenda of West-German and Canadian energy policies. As a consequence of the stagnation or the negative growth of the world economic market, changes in their energy production and consumption can be perceived. However, the West-German and Canadian energy production and consumption intensified with the augmentation of the world economy. During the period of study, environmental concerns were taken into account in the energy policy agendas of the Federal Republic of Germany and Canada but they were not of primary concern. wi thin the decade of. the 1980s notably more environmental considerations were taken into account in the energy policies of the two states. The two nuclear reactor accidents in 1979 and 1986 sharpened to various degrees West-German and Canadian public discourse of present energy supply mix and attitude towards energy production and consumption. The statistical data reflects yet no changes in the energy policies in regard to the position of nuclear power. However, in the next several years possible changes can be observed through statistical data, because the planning, the construction and possible phase out of nuclear power requires several years. Finally, the thesis reveals that the implementation of a soft energy path requires profound changes in the consumer behaviour. As several studies indicate, a soft energy path is technological and economically feasible for the Federal Republic of Germany and Canada, its implementation remains to be a political decision.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Film sequels are a pervasive part of film consumption practices and have become an important part of the decision making process for Hollywood studios and producers. This thesis indicates that sequels are not homogenous groups of films, as they are often considered, but offer a variety of story construction and utilize a variety of production methods. Three types of blockbuster sequel sets are identified and discussed in this thesis. The Traditional Blockbuster Sequel Set, as exemplified by Back to the Future (1985, 1989, 1990) films, is the most conventional type of sequel set and capitalizes on the winning formula of the first film in the franchise. The MultiMedia Sequel Set, such as The Matrix (1999,2003) trilogy, allows the user/viewer to experience and consume the story as well as the world of the film through many different media. The Lord a/ the Rings (2001, 2002, 2003) set of films is an illustration of The Saga Sequel Set where plot lines are continuous over the entire franchise thus allowing the viewer to see the entire set as a unified work. The thesis also demonstrates how the blockbuster sequel sets, such as the Pirates a/ the Caribbean (2003, 2006, 2007) franchise, restructure the production process of the Hollywood film industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Chapter 1 presents a brief note on the state at which the construction industry stands at present, bringing into focus the significance of the critical study. Relevance of the study, area of investigation and objectives of the study are outlined in this chapter. The 2nd chapter presents a review of the literature on the relevant areas. In the third chapter an analysis on time and cost overrun in construction highlighting the major factors responsible for it has been done. A couple of case studies to estimate loss to the nation on account of delay in construction have been presented in the chapter. The need for an appropriate estimate and a competent contractor has been emphasised for improving effectiveness in the project implementation. Certain useful equations and thoughts have been formulated on this area in this chapter that can be followed in State PWD and other Govt. organisations. Case studies on project implementation of major projects undertaken by Government sponsored/supported organizations in Kerala have been dealt with in Chapter 4. A detailed description of the project of Kerala Legislature Complex with a critical analysis has been given in this chapter. A detailed account of the investigations carried out on the construction of International Stadium, a sports project of Greater Cochin Development Authority is included here. The project details of Cochin International Airport at Nedumbassery, its promoters and contractors are also discussed in Chapter 4. Various aspects of implementation which led the above projects successful have been discussed in chapter 5. The data collected were analysed through discussion and perceptions to arrive at certain conclusions. The emergence of front-loaded contract and its impact on economics of the project execution are dealt with in this chapter. Analysis of delays in respect of the various project narrated in chapter 3 has been done here. The root causes of the project time and overrun and its remedial measures are also enlisted in this chapter. Study of cost and time overrun of any construction project IS a part of construction management. Under the present environment of heavy investment on construction activities in India, the consequences of mismanagement many a time lead to excessive expenditure which are not be avoidable. Cost consciousness, therefore has to be keener than ever before. Optimization in investment can be achieved by improved dynamism in construction management. The successful completion of coristruction projects within the specified programme, optimizing three major attributes of the process - quality, schedule and costs - has become the most valuable and challenging task for the engineer - managers to perform. So, the various aspects of construction management such as cost control, schedule control, quality assurance, management techniques etc. have also been discussed in this fifth chapter. Chapter 6 summarises the conclusions drawn from the above criticalr1 of rhajor construction projects in Kerala.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

La construcción es una de las industrias que mayores accidentes laborales genera, en esta investigación se realizó un análisis retrospectivo para determinar si existe alguna relación entre la ocurrencia de accidentes y la fecha de entrega de una meta, debido al incremento en la cantidad de trabajo expresado por la cantidad de días y horas extras trabajados, se cuenta con información de la accidentalidad de cinco empresas constructoras de un gran proyecto vial en Colombia en los años de 2012 y 2013. Se analizó la información correspondiente a la nómina de las mismas empresas, con el valor de la nómina mensual, el valor de las incapacidades mensuales y la cantidad de trabajadores por cada empresa en cada periodo. El manejo de los datos se hizo con EXCEL y el análisis estadístico con STATA 11.1, se usó la correlación de Spearman para encontrar la relación entre la cantidad de accidentes acumulados y: la cantidad acumulada de días trabajados en cada mes, la cantidad acumulada de horas extras trabajadas mensualmente y el costo acumulado en porcentaje de la nómina mensual, encontrándose en todos los casos una relación lineal. Por otra parte, se realizó una prueba binomial para establecer la relación de la fecha de entrega de la meta con la accidentalidad 30 días antes y después, encontrando que la accidentalidad aumenta en la proximidad previa a la entrega de la meta

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Los diferentes sectores de la economía ejercen múltiples actividades que impulsan el crecimiento socio-económico de los diferentes países, sin embargo dichas actividades tienen repercusiones importantes a nivel ambiental, dentro de las que se encuentran transformaciones irreversibles del planeta, tanto físicas como químicas. Gracias a esto, en la actualidad, las empresas y organizaciones han empezado a controlar con mayor responsabilidad sus respectivos procesos y operaciones, buscando no solo mitigar los impactos negativos ocasionados al medio ambiente y a la sociedad sino la optimización en el uso de recursos tanto físicos como económicos. El presente estudio tiene como finalidad analizar las operaciones que se realizan en una obra civil, con el fin de identificar cuáles son las principales causantes de contaminación, por otro lado se hará mención de como la normatividad y legislación colombiana aplica y ejerce control en cada uno de los mismos, finalmente se plantearán diferentes soluciones y alternativas para que dicha industria pueda implementarlas en sus quehaceres diarios. Para lograr lo anterior se utilizaron diferentes herramientas que facilitaron la obtención de datos e información para el estudio tales como: entrevistas a los miembros y participantes de la obra civil, visitas de campo, recopilación de información de estudios similares, realización de la matriz de aspectos e impactos y fichas ambientales, entre otras. Los resultados obtenidos permitieron entender que es inevitable que esta industria no genere ciertas contaminaciones e impactos negativos, además de identificar que la normativa del país en cuanto control ambiental se encuentra algo atrasada, factor que fue determinante a la hora de proponer distintas alternativas que buscan tanto facilitar las prácticas que el sector de la construcción tiene en el país como minimizar al máximo los impactos ambientales negativos ocasionados.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This book is aimed primarily at students for whom the study of building or civil engineering contracts forms part of a construction-based course. We have had in mind the syllabus requirements for first degrees in Building, Civil Engineering, Architecture, Quantity Surveying and Building Surveying, as well as those of postgraduate courses in Construction Management and Project Management. We have also assumed that such students will already have been introduced to the general principles of English law, especially those relating to contract and tort. As a result, while aspects of those subjects that are of particular relevance to construction are dealt with here, the reader must look elsewhere for the general legal background. In producing this third edition, we have again been greatly assisted by the many helpful comments made by reviewers and users of its predecessor. Nonetheless, our basic aim is identical to that which underpinned the first edition: to provide an explanation of the fundamental principles of construction contract law, rather than a clause-by-clause analysis of any particular standard-form contract. As a result, while we draw most frequently upon JCT 98 for our illustrations of particular points, this merely reflects the pre-eminent position occupied by that particular form of contract in the UK construction industry. We conclude by repeating our previous warning as to the dangers inherent in a little learning. Neither this book, nor the courses for which it is intended, seek to produce construction lawyers. The objective is rather to enable those who are not lawyers to resolve simple construction disputes before they become litigious, and to recognize when matters require professional legal advice. It should be the aim of every construction student to understand the legal framework sufficiently that they can instruct and brief specialist lawyers, and this book is designed to help them towards that understanding.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Standard form contracts are typically developed through a negotiated consensus, unless they are proffered by one specific interest group. Previously published plans of work and other descriptions of the processes in construction projects tend to focus on operational issues, or they tend to be prepared from the point of view of one or other of the dominant interest groups. Legal practice in the UK permits those who draft contracts to define their terms as they choose. There are no definitive rulings from the courts that give an indication as to the detailed responsibilities of project participants. The science of terminology offers useful guidance for discovering and describing terms and their meanings in their practical context, but has never been used for defining terms for responsibilities of participants in the construction project management process. Organizational analysis enables the management task to be deconstructed into its elemental parts in order that effective organizational structures can be developed. Organizational mapping offers a useful technique for reducing text-based descriptions of project management roles and responsibilities to a comparable basis. Research was carried out by means of a desk study, detailed analysis of nine plans of work and focus groups representing all aspects of the construction industry. No published plan of work offers definitive guidance. There is an enormous amount of variety in the way that terms are used for identifying responsibilities of project participants. A catalogue of concepts and terms (a “Terminology”) has been compiled and indexed to enable those who draft contracts to choose the most appropriate titles for project participants. The purpose of this terminology is to enable the selection and justification of appropriate terms in order to help define roles. The terminology brings an unprecedented clarity to the description of roles and responsibilities in construction projects and, as such, will be helpful for anyone seeking to assemble a team and specify roles for project participants.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since its popularization in the 1980s, competitiveness has received close attention from practitioners and researchers across a wide range of industries. In the construction sector, many works on competitiveness have also been published. So far, however, there seems to be no comprehensive review to summarize and critique existing research on competitiveness in construction. This research, therefore, reviews the extant literature from four aspects: concept of competitiveness, competitiveness research at the construction industry level, competitiveness research at the firm level, and competitiveness research at the project level. The review presents the state-of-the-art development of competitiveness research in construction, identifies the research gaps, and proposes new directions for further studies. Further research is recommended to validate previous studies in construction practices, identify the mechanisms that encourage mutual enhancement of competitiveness at different levels, and how to achieve its sustainability by embracing new management and/or economics techniques.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Anticipating the future is increasingly being seen as a useful way to align, direct and improve current organizational strategy. Several such 'future studies' have been produced which envision various construction industry scenarios which result from technological and socio-economic trends and influences. Thirteen construction-related future studies are critically reviewed. Most studies fail to address the complexities and uncertainties of both the present and the future, and fail to explore the connections between global, local, construction-specific and more widespread factors. The methodological approaches used in these studies do not generate any significantly different advice or recommendations for the industry than those emerging from the much larger canon of non-future oriented construction research. As such, these reports are less about the future than the present. If future studies are to make a worthwhile contribution to construction, it is critical that they develop our appreciation of the practical ability of stakeholders to influence some aspects of the future and not others, and an awareness of the competing agendas and the relative benefits and disadvantages of specific futures within the construction sector. Only then can future studies provide insights and help in preparing for the opportunities and threats the future may bring.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The construction industry has incurred a considerable amount of waste as a result of poor logistics supply chain network management. Therefore, managing logistics in the construction industry is critical. An effective logistic system ensures delivery of the right products and services to the right players at the right time while minimising costs and rewarding all sectors based on value added to the supply chain. This paper reports on an on-going research study on the concept of context-aware services delivery in the construction project supply chain logistics. As part of the emerging wireless technologies, an Intelligent Wireless Web (IWW) using context-aware computing capability represents the next generation ICT application to construction-logistics management. This intelligent system has the potential of serving and improving the construction logistics through access to context-specific data, information and services. Existing mobile communication deployments in the construction industry rely on static modes of information delivery and do not take into account the worker’s changing context and dynamic project conditions. The major problems in these applications are lack of context-specificity in the distribution of information, services and other project resources, and lack of cohesion with the existing desktop based ICT infrastructure. The research works focus on identifying the context dimension such as user context, environmental context and project context, selection of technologies to capture context-parameters such wireless sensors and RFID, selection of supporting technologies such as wireless communication, Semantic Web, Web Services, agents, etc. The process of integration of Context-Aware Computing and Web-Services to facilitate the creation of intelligent collaboration environment for managing construction logistics will take into account all the necessary critical parameters such as storage, transportation, distribution, assembly, etc. within off and on-site project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The demolition of constructed structures has earned a negative reputation for the construction industry due to the enormous amount of waste that is sent to landfills. Demolition waste reuse and recycling is, therefore, significant; it is a new and illustrative perspective on demolition waste management from the viewpoint of the building material lifecycle. It is discovered that demolition waste reuse and recycling plays important roles in value transformation for building material lifecycle, local economics,
sustainable environment and nature resource conservation. In this research article, the authors aim to pinpoint demolition waste management in the lifecycle of building materials, and to examine various economic and environmental aspects of demolition waste reuse and recycling. In addition, the barriers, limitations and solutions for improving the implementation of demolition waste reuse and recycling are discussed in the article.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian construction industry, particularly in the area of demolishing existing facilities, is responsible for up to 40% of the country's enormous solid waste streams, totalling about 14 million tonnes annually. The recently created concept of deconstruction, rather than destruction for demolishing a constructed facility, came about because of the rapidly increasing number of demolished buildings and changes in levels of environmental awareness. However,  reconstruction processes are now seen as only an interesting concept for reducing waste through reuse and recycling, but they fail to achieve widespread understanding or acceptance. The challenges faced by deconstruction are significant and diverse. The maturity of deconstruction practice depends on not only on tlle development of deconstruction techniques and management, but also on the enhancement of deconstruction awareness by the owners, designers, and construction teams, as well as the development of environmental regulations. These practical limitations are interrelated and mutually promotional. The technical developments in deconstruction management resulting from this research will have direct effects on various aspects, including the development of design and construction for deconstruction, deconstruction technology, reused material certification, recycl ing technology, and a method by which to calculate environmental benefits so that deconstruction would be promoted from an interesting concept mainly in theory to wide acceptance in practice. 

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper presents a Web-based information system for promoting the cascading utilisation of construction materials in order to mitigate the increasing environmental pressure by the construction industry. First, this paper points out me weaknesses of current waste material exchange systems. Then, a new approach is introduced to reuse demolished materials, by which the utilisation of demolished materials may be ascertained before the demolition is actually produced.. Information technologies, including web-based intelligent and distributed systems, are applied to actua1ise this approach. Finally, the development and implementation of the system is described in detail.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Water consumed directly by the construction industry is known to be of little importance. However, water consumed in the manufacture of goods and services required by construction may be significant in the context of a building's life cycle water requirements and the national water budget. This paper evaluates the significance of water embodied in the construction of individual buildings. To do this, an input-output-based hybrid embodied water analysis was undertaken on 17 Australian non-residential case studies. It was found that there is a considerable amount of water embodied in construction. The highest value was 20.1 kilolitres (kL)/m2 gross floor area (GFA), representing many times the enclosed volume of the building, and many years worth of operational water. The water required by the main construction process is minimal. However, the water embodied in building materials is considerable. These findings suggest that the selection of elements and materials has a great impact on a building's embodied water. This research allows the construction industry to evaluate design and construction in broad environmental terms to select options that might be cost neutral or possibly cost positive while retaining their environmental integrity. The research suggests policies focused on operational water consumption alone are inadequate.