1000 resultados para Building stones
Resumo:
Traversability maps are a global spatial representation of the relative difficulty in driving through a local region. These maps support simple optimisation of robot paths and have been very popular in path planning techniques. Despite the popularity of these maps, the methods for generating global traversability maps have been limited to using a-priori information. This paper explores the construction of large scale traversability maps for a vehicle performing a repeated activity in a bounded working environment, such as a repeated delivery task.We evaluate the use of vehicle power consumption, longitudinal slip, lateral slip and vehicle orientation to classify the traversability and incorporate this into a map generated from sparse information.
Resumo:
Purpose – This paper presents findings of a research study aimed at identifying critical sustainability factors for improved implementation of Industrialised Building Systems (IBS). It also highlights the importance of decision support, through the establishment of decision making guidelines, for sustainability deliverables in IBS development. Design/methodology/approach – A broad range of sustainability factors, as perceived by researchers and practitioners, are identified through a comprehensive literature study. A study of the survey and statistical data analysis is conducted to examine the criticality of these sustainability factors in IBS implementation. Findings – 18 sustainability factors are identified as critical to IBS implementation. Their interrelationships and driving forces are explored, which leads to the development of a conceptual model to map these factors for actions or potential solutions. The work provides a sound basis towards a set of decision making guidelines for sustainable IBS implementation. Originality/value – Compared with previous studies that focus on technical or economical aspects, this study extends existing knowledge on construction prefabrication by linking all aspects of sustainability issues with the design process. It also covers industry characteristics of developing countries, as represented by Malaysia’s scenarios.
Resumo:
A building information model (BIM) is an electronic repository of structured, three-dimensional data that captures both the physical and dynamic functional characteristics of a facility. In addition to its more traditional function as a tool to aid design and construction, a BIM can be used throughout the life cycle of a facility, functioning as a living database that places resources contained within the building in their spatial and temporal context. Through its comprehension of spatial relationships, a BIM can meaningfully represent and integrate previously isolated control and management systems and processes, and thereby provide a more intuitive interface to users. By placing processes in a spatial context, decision-making can be improved, with positive flow-on effects for security and efficiency. In this article, we systematically analyse the authorization requirements involved in the use of BIMs. We introduce the concept of using a BIM as a graphical tool to support spatial access control configuration and management (including physical access control). We also consider authorization requirements for regulating access to the structured data that exists within a BIM as well as to external systems and data repositories that can be accessed via the BIM interface. With a view to addressing these requirements we present a survey of relevant spatiotemporal access control models, focusing on features applicable to BIMs and highlighting capability gaps. Finally, we present a conceptual authorization framework that utilizes BIMs.
Resumo:
Fire safety has become an important part in structural design due to the ever increasing loss of properties and lives during fires. Conventionally the fire rating of load bearing wall systems made of Light gauge Steel Frames (LSF) is determined using fire tests based on the standard time-temperature curve given in ISO 834 (ISO, 1999). The standard time-temperature curve given in ISO 834 (ISO, 1999) originated from the application of wood burning furnaces in the early 1900s. However, modern commercial and residential buildings make use of thermoplastic materials, which mean considerably high fuel loads. Hence a detailed fire research study into the performance of LSF walls was undertaken using the developed real fire curves based on Eurocode parametric curves (ECS, 2002) and Barnett’s BFD curves (Barnett, 2002) using both full scale fire tests and numerical studies. It included LSF walls without any insulation, and the recently developed externally insulated composite panel system. This paper presents the details of the numerical studies and the results. It also includes brief details of the development of real building fire curves and experimental studies.
Resumo:
Abstract. Fire resistance has become an important part in structural design due to the ever increasing loss of properties and lives every year. Conventionally the fire rating of load bearing Light gauge Steel Frame (LSF) walls is determined using standard fire tests based on the time-temperature curve given in ISO 834 [1]. Full scale fire testing based on this standard time-temperature curve originated from the application of wood burning furnaces in the early 1900s and it is questionable whether it truly represents the fuel loads in modern buildings. Hence a detailed fire research study into the performance of LSF walls was undertaken using real design fires based on Eurocode parametric curves [2] and Barnett’s ‘BFD’ curves [3]. This paper presents the development of these real fire curves and the results of full scale experimental study into the structural and fire behaviour of load bearing LSF stud wall systems.
Resumo:
The Teaching Teachers for the Future (TTF) project is a unique nationally significant project funded by the Australian Government through the Department of Employment, Education and Workplace Relations (DEEWR, Au$8.8 million) and the Information and Communication Technology Innovation Fund (ICTIF). This 2011-2012 project has ambitiously attempted to build the ICT education (ICTE) capacity of the next generation of Australian teachers through its focus on pre-service teachers, teacher educators and the new Australian Curriculum. This paper will provide an overview of the project including a description of its genesis in a changing educational and political landscape, its structure and operations, its grounding in contemporary theory, the research opportunities it has engendered and its tangible outcomes.
Resumo:
The year 2010 was the wettest year on record for Queensland, Australia and the wettest year since 1974 for Southeast Queensland. The extremely heavy rain in early January 2011 fell on the catchments of heavily saturated Brisbane and Stanley Rivers systems resulting in significant runoff which rapidly produced a widespread and devastating flood event. The area of inundation was equivalent to the total land area of France and Germany combined. Over 200,000 people were affected leaving 35 people dead and 9 missing. The damage bill was estimated at over $1B and cost to the economy at over $10B with over 30,000 homes and 6,000 business flooded and 86 towns and regional centres affected. The need to disburse disaster funding in a prompt manner to the affected population was paramount to facilitate individuals getting their lives back to some normality. However, the payout of insurance claims has proved to be a major area of community anger. The ongoing impasse in payment of insurance compensation is attributed to the nature and number of claims, confusing definition of flooding and the lack or accuracy of information needed to determine individually the properties affected and legitimacy of claims. Information was not readily available at the micro-level including, extent and type of inundation, flood heights at property level and cause of damage. Events during the aftermath highlighted widespread community misconceptions concerning the technical factors associated with the flood event and the impact of such on access to legitimate compensation and assistance. Individual and community wide concerns and frustration, anger and depression, have arisen resulting from delays in the timely settlement of insurance claims. Lessons learnt during the aftermath are presented in the context of their importance as a basis for inculcating communities impacted by the flood event with resilience for the future.
Resumo:
Sustainability issues in built environment have attracted an increasingly level of attention from both the general public and the industry. As a result, a number of green building assessment tools have been developed such as the Leadership in Energy and Environmental Design (LEED) and the BRE Environmental Assessment Method (BREEAM), etc. This paper critically reviewed the assessment tools developed in Australian context, i.e. the Green Star rating tools developed by the Green Building Council of Australia. A particular focus is given to the recent developments of these assessment tools. The results showed that the office buildings take the biggest share of Green Star rated buildings. Similarly, sustainable building assessments seem to be more performance oriented which focuses on the operation stage of buildings. In addition, stakeholder engagement during the decision making process is encouraged. These findings provide useful references to the development of next generation of sustainable building assessment tools.
Resumo:
"The text is unique in the way it balances a "user" and "preparer" perspective and integrates real financial information to illustrate business decision choices and how decisions are made using accounting information. The pedagogical approach presented in the text has been tried and tested over many years, and provides a constructive framework for students to learn fundamental accounting concepts and processes. Through the use of real company information and financial statements students will quickly appreciate the use of accounting information. The textbook clearly outlines to students how to account for typical business transactions and prepare financial statements - such as a balance sheet, income statement, and statement of cash flows - that communicate the financing, operating, and investing activities of a business. Whether a student is required to study one accounting subject, as part of a wider business degree, or undertake a major study of accounting the text builds a strong conceptual understanding of accounting and will develop skills that can be applied to an accounting and business environment. The integral role of financial statements for decision making is also emphasised in this text and is reinforced throughout by the Decision Toolkit in each chapter. Students are provided with an extensive set of tools necessary to make business decisions based on financial information." -- publisher website
Resumo:
This paper considers the conditions that are necessary at system and local levels for teacher assessment to be valid, reliable and rigorous. With sustainable assessment cultures as a goal, the paper examines how education systems can support local level efforts for quality learning and dependable teacher assessment. This is achieved through discussion of relevant research and consideration of a case study involving an evaluation of a cross-sectoral approach to promoting confidence in school-based assessment in Queensland, Australia. Building on the reported case study, essential characteristics for developing sustainable assessment cultures are presented, including: leadership in learning; alignment of curriculum, pedagogy and assessment; the design of quality assessment tasks and accompanying standards, and evidence-based judgement and moderation. Taken together, these elements constitute a new framework for building assessment capabilities and promoting quality assurance.
Resumo:
Physical access control systems play a central role in the protection of critical infrastructures, where both the provision of timely access and preserving the security of sensitive areas are paramount. In this paper we discuss the shortcomings of existing approaches to the administration of physical access control in complex environments. At the heart of the problem is the current dependency on human administrators to reason about the implications of the provision or the revocation of staff access to an area within these facilities. We demonstrate how utilising Building Information Models (BIMs) and the capabilities they provide, including 3D representation of a facility and path-finding can reduce possible intentional or accidental errors made by security administrators.
Resumo:
This paper describes a capacity building process undertaken within the HIV/AIDS prevention project of the Adventist Development and Relief Agency (ADRA) in the Solomon Islands. ADRA HIV/AIDS has recently reoriented its project structure, moving beyond its awareness raising approach to incorporate health promotion frameworks, theories, strategies and assumptions. These have been used to inform project practice in project planning, delivery and evaluation. This paper shares what has worked and not worked in the capacity building process, including a project evaluation of the initial HIV/AIDS awareness raising project and the application of a number of capacity building strategies, including utilising a volunteer Australian Youth Ambassador for Development (AYAD) funded by the Australian Agency for International Development (AusAID). Existing and new projects are outlined. The underlying theme is that any capacity building exercise must include structural support (e.g. management, national frameworks) to ensure the incorporation of new initiatives and approaches. With time this enables ownership by counterparts and external partnerships to develop. The presence of an AYAD volunteer has been an effective strategy to achieve this. Reflections from the evaluators, the AYAD volunteer and the HIV/AIDS team are included.
Resumo:
The effect of resource management on the building design process directly influences the development cycle time and success of construction projects. This paper presents the information constraint net (ICN) to represent the complex information constraint relations among design activities involved in the building design process. An algorithm is developed to transform the information constraints throughout the ICN into a Petri net model. A resource management model is developed using the ICN to simulate and optimize resource allocation in the design process. An example is provided to justify the proposed model through a simulation analysis of the CPN Tools platform in the detailed structural design. The result demonstrates that the proposed approach can obtain the resource management and optimization needed for shortening the development cycle and optimal allocation of resources.