963 resultados para certificate-based signatures
Resumo:
We investigate the relationship between bricolage – an approach to a firm’s resource development – and the firm’s strategic resource position as depicted by the resource-based view (RBV). The RBV is concerned with the resource characteristics of firms that lead to sustainable competitive advantage. Alternatively, bricolage is a process of resource use and development characterised by using resources at hand, recombining resources and making do. Based on a sample of approximately 700 nascent and 700 young firms we find that higher levels of bricolage behaviour tend to lead to more advantageous strategic resource positions.
Resumo:
We investigate the relationship between bricolage – an approach to a firm’s resource development – and the firm’s strategic resource position as depicted by the resource-based view (RBV). The RBV is concerned with the resource characteristics of firms that lead to sustainable competitive advantage. Alternatively, bricolage is a process of resource use and development characterised by using resources at hand, recombining resources and making do. Based on a sample of 1,329 entrepreneurial start-ups we find that higher levels of bricolage behaviour tend to lead to more advantageous strategic resource positions.
Resumo:
Principal Topic: It is well known that most new ventures suffer from a significant lack of resources, which increases the risk of failure (Shepherd, Douglas and Shanley, 2000) and makes it difficult to attract stakeholders and financing for the venture (Bhide & Stevenson, 1999). The Resource-Based View (RBV) (Barney, 1991; Wernerfelt, 1984) is a dominant theoretical base increasingly drawn on within Strategic Management. While theoretical contributions applying RBV in the domain of entrepreneurship can arguably be traced back to Penrose (1959), there has been renewed attention recently (e.g. Alvarez & Busenitz, 2001; Alvarez & Barney, 2004). This said, empirical work is in its infancy. In part, this may be due to a lack of well developed measuring instruments for testing ideas derived from RBV. The purpose of this study is to develop a measurement scales that can serve to assist such empirical investigations. In so doing we will try to overcome three deficiencies in current empirical measures used for the application of RBV to the entrepreneurship arena. First, measures for resource characteristics and configurations associated with typical competitive advantages found in entrepreneurial firms need to be developed. These include such things as alertness and industry knowledge (Kirzner, 1973), flexibility (Ebben & Johnson, 2005), strong networks (Lee et al., 2001) and within knowledge intensive contexts, unique technical expertise (Wiklund and Shepard, 2003). Second, the RBV has the important limitations of being relatively static and modelled on large, established firms. In that context, traditional RBV focuses on competitive advantages. However, newly established firms often face disadvantages, especially those associated with the liabilities of newness (Aldrich & Auster, 1986). It is therefore important in entrepreneurial contexts to expand to an investigation of responses to competitive disadvantage through an RBV lens. Conversely, recent research has suggested that resource constraints actually have a positive effect on firm growth and performance under some circumstances (e.g., George, 2005; Katila & Shane, 2005; Mishina et al., 2004; Mosakowski, 2002; cf. also Baker & Nelson, 2005). Third, current empirical applications of RBV measured levels or amounts of particular resources available to a firm. They infer that these resources deliver firms competitive advantage by establishing a relationship between these resource levels and performance (e.g. via regression on profitability). However, there is the opportunity to directly measure the characteristics of resource configurations that deliver competitive advantage, such as Barney´s well known VRIO (Valuable, Rare, Inimitable and Organized) framework (Barney, 1997). Key Propositions and Methods: The aim of our study is to develop and test scales for measuring resource advantages (and disadvantages) and inimitability for entrepreneurial firms. The study proceeds in three stages. The first stage developed our initial scales based on earlier literature. Where possible, we adapt scales based on previous work. The first block of the scales related to the level of resource advantages and disadvantages. Respondents were asked the degree to which each resource category represented an advantage or disadvantage relative to other businesses in their industry on a 5 point response scale: Major Disadvantage, Slight Disadvantage, No Advantage or Disadvantage, Slight Advantage and Major Advantage. Items were developed as follows. Network capabilities (3 items) were adapted from (Madsen, Alsos, Borch, Ljunggren & Brastad, 2006). Knowledge resources marketing expertise / customer service (3 items) and technical expertise (3 items) were adapted from Wiklund and Shepard (2003). flexibility (2 items), costs (4 items) were adapted from JIBS B97. New scales were developed for industry knowledge / alertness (3 items) and product / service advantages. The second block asked the respondent to nominate the most important resource advantage (and disadvantage) of the firm. For the advantage, they were then asked four questions to determine how easy it would be for other firms to imitate and/or substitute this resource on a 5 point likert scale. For the disadvantage, they were asked corresponding questions related to overcoming this disadvantage. The second stage involved two pre-tests of the instrument to refine the scales. The first was an on-line convenience sample of 38 respondents. The second pre-test was a telephone interview with a random sample of 31 Nascent firms and 47 Young firms (< 3 years in operation) generated using a PSED method of randomly calling households (Gartner et al. 2004). Several items were dropped or reworded based on the pre-tests. The third stage (currently in progress) is part of Wave 1 of CAUSEE (Nascent Firms) and FEDP (Young Firms), a PSED type study being conducted in Australia. The scales will be tested and analysed with a random sample of approximately 700 Nascent and Young firms respectively. In addition, a judgement sample of approximately 100 high potential businesses in each category will be included. Findings and Implications: The paper will report the results of the main study (stage 3 – currently data collection is in progress) will allow comparison of the level of resource advantage / disadvantage across various sub-groups of the population. Of particular interest will be a comparison of the high potential firms with the random sample. Based on the smaller pre-tests (N=38 and N=78) the factor structure of the items confirmed the distinctiveness of the constructs. The reliabilities are within an acceptable range: Cronbach alpha ranged from 0.701 to 0.927. The study will provide an opportunity for researchers to better operationalize RBV theory in studies within the domain of entrepreneurship. This is a fundamental requirement for the ability to test hypotheses derived from RBV in systematic, large scale research studies.
Resumo:
This thesis reports the outcomes of an investigation into students’ experience of Problem-based learning (PBL) in virtual space. PBL is increasingly being used in many fields including engineering education. At the same time many engineering education providers are turning to online distance education. Unfortunately there is a dearth of research into what constitutes an effective learning experience for adult learners who undertake PBL instruction through online distance education. Research was therefore focussed on discovering the qualitatively different ways that students experience PBL in virtual space. Data was collected in an electronic environment from a course, which adopted the PBL strategy and was delivered entirely in virtual space. Students in this course were asked to respond to open-ended questions designed to elicit their learning experience in the course. Data was analysed using the phenomenographical approach. This interpretative research method concentrated on mapping the qualitative differences in students’ interpretations of their experience in the course. Five qualitatively different ways of experiencing were discovered: Conception 1: ‘A necessary evil for program progression’; Conception 2: ‘Developing skills to understand, evaluate, and solve technical Engineering and Surveying problems’; Conception 3: ‘Developing skills to work effectively in teams in virtual space’; Conception 4: ‘A unique approach to learning how to learn’; Conception 5: ‘Enhancing personal growth’. Each conception reveals variation in how students attend to learning by PBL in virtual space. Results indicate that the design of students’ online learning experience was responsible for making students aware of deeper ways of experiencing PBL in virtual space. Results also suggest that the quality and quantity of interaction with the team facilitator may have a significant impact on the student experience in virtual PBL courses. The outcomes imply pedagogical strategies can be devised for shifting students’ focus as they engage in the virtual PBL experience to effectively manage the student learning experience and thereby ensure that they gain maximum benefit. The results from this research hold important ramifications for graduates with respect to their ease of transition into professional work as well as their later professional competence in terms of problem solving, ability to transfer basic knowledge to real-life engineering scenarios, ability to adapt to changes and apply knowledge in unusual situations, ability to think critically and creatively, and a commitment to continuous life-long learning and self-improvement.
Resumo:
Vibration based damage identification methods examine the changes in primary modal parameters or quantities derived from modal parameters. As one method may have advantages over the other under some circumstances, a multi-criteria approach is proposed. Case studies are conducted separately on beam, plate and plate-on-beam structures. Using the numerically simulated modal data obtained through finite element analysis software, algorithms based on flexibility and strain energy changes before and after damage are obtained and used as the indices for the assessment of the state of structural health. Results show that the proposed multi-criteria method is effective in damage identification in these structures.
Resumo:
Objective: To examine the impact on dental utilisation following the introduction of a participating provider scheme (Regional and Rural Oral Health Program {RROHP)). In this model dentists receive higher third party payments from a private health insurance fund for delivering an agreed range of preventive and diagnostic benefits at no out-ofpocket cost to insured patients. Data source/Study setting: Hospitals Contribution Fund of Australia (HCF) dental claims for all members resident in New South Wales over the six financial years from l99811999 to 200312004. Study design: This cohort study involves before and after analyses of dental claims experience over a six year period for approximately 81,000 individuals in the intervention group (HCF members resident in regional and rural New South Wales, Australia) and 267,000 in the control group (HCF members resident in the Sydney area). Only claims for individuals who were members of HCF at 31 December 1997 were included. The analysis groups claims into the three years prior to the establishment of the RROHP and the three years subsequent to implementation. Data collection/Extraction methods: The analysis is based on all claims submitted by users of services for visits between 1 July 1988 and 30 June 2004. In these data approximately 1,000,000 services were provided to the intervention group and approximately 4,900,000 in the control group. Principal findings: Using Statistical Process Control (SPC) charts, special cause variation was identified in total utilisation rate of private dental services in the intervention group post implementation. No such variation was present in the control group. On average in the three years after implementation of the program the utilisation rate of dental services by regional and rural residents of New South Wales who where members of HCF grew by 12.6%, over eight times the growth rate of 1.5% observed in the control group (HCF members who were Sydney residents). The differences were even more pronounced in the areas of service that were the focus of the program: diagnostic and preventive services. Conclusion: The implementation of a benefit design change, a participating provider scheme, that involved the removal of CO-payments on a defined range of preventive and diagnostic dental services combined with the establishment and promotion of a network of dentists, appears to have had a marked impact on HCF members' utilisation of dental services in regional and rural New South Wales, Australia.
Resumo:
As a part of vital infrastructure and transportation networks, bridge structures must function safely at all times. However, due to heavier and faster moving vehicular loads and function adjustment, such as Busway accommodation, many bridges are now operating at an overload beyond their design capacity. Additionally, the huge renovation and replacement costs always make the infrastructure owners difficult to undertake. Structural health monitoring (SHM) is set to assess condition and foresee probable failures of designated bridge(s), so as to monitor the structural health of the bridges. The SHM systems proposed recently are incorporated with Vibration-Based Damage Detection (VBDD) techniques, Statistical Methods and Signal processing techniques and have been regarded as efficient and economical ways to solve the problem. The recent development in damage detection and condition assessment techniques based on VBDD and statistical methods are reviewed. The VBDD methods based on changes in natural frequencies, curvature/strain modes, modal strain energy (MSE) dynamic flexibility, artificial neural networks (ANN) before and after damage and other signal processing methods like Wavelet techniques and empirical mode decomposition (EMD) / Hilbert spectrum methods are discussed here.
Resumo:
Based on Newmark-β method, a structural vibration response is predicted. Through finding the appropriate control force parameters within certain ranges to optimize the objective function, the predictive control of the structural vibration is achieved. At the same time, the numerical simulation analysis of a two-storey frame structure with magneto-rheological (MR) dampers under earthquake records is carried out, and the parameter influence on structural vibration reduction is discussed. The results demonstrate that the semi-active control based on Newmark-β predictive algorithm is better than the classical control strategy based on full-state feedback control and has remarkable advantages of structural vibration reduction and control robustness.
Resumo:
An earlier CRC-CI project on ‘automatic estimating’ (AE) has shown the key benefit of model-based design methodologies in building design and construction to be the provision of timely quantitative cost evaluations. Furthermore, using AE during design improves design options, and results in improved design turn-around times, better design quality and/or lower costs. However, AEs for civil engineering structures do not exist; and research partners in the CRC-CI expressed interest in exploring the development of such a process. This document reports on these investigations. The central objective of the study was to evaluate the benefits and costs of developing an AE for concrete civil engineering works. By studying existing documents and through interviews with design engineers, contractors and estimators, we have established that current civil engineering practices (mainly roads/bridges) do not use model-based planning/design. Drawings are executed in 2D and only completed at the end of lengthy planning/design project management lifecycle stages. We have also determined that estimating plays two important, but different roles. The first is part of project management (which we have called macro level estimating). Estimating in this domain sets project budgets, controls quality delivery and contains costs. The second role is estimating during planning/design (micro level estimating). The difference between the two roles is that the former is performed at the end of various lifecycle stages, whereas the latter is performed at any suitable time during planning/design.
Resumo:
The construction industry is categorised as being an information-intensive industry and described as one of the most important industries in any developed country, facing a period of rapid and unparalleled change (Industry Science Resources 1999) (Love P.E.D., Tucker S.N. et al. 1996). Project communications are becoming increasingly complex, with a growing need and fundamental drive to collaborate electronically at project level and beyond (Olesen K. and Myers M.D. 1999; Thorpe T. and Mead S. 2001; CITE 2003). Yet, the industry is also identified as having a considerable lack of knowledge and awareness about innovative information and communication technology (ICT) and web-based communication processes, systems and solutions which may prove beneficial in the procurement, delivery and life cycle of projects (NSW Government 1998; Kajewski S. and Weippert A. 2000). The Internet has debatably revolutionised the way in which information is stored, exchanged and viewed, opening new avenues for business, which only a decade ago were deemed almost inconceivable (DCITA 1998; IIB 2002). In an attempt to put these ‘new avenues of business’ into perspective, this report provides an overall ‘snapshot’ of current public and private construction industry sector opportunities and practices in the implementation and application of web-based ICT tools, systems and processes (e-Uptake). Research found that even with a reserved uptake, the construction industry and its participating organisations are making concerted efforts (fortunately with positive results) in taking up innovative forms of doing business via the internet, including e-Tendering (making it possible to manage the entire tender letting process electronically and online) (Anumba C.J. and Ruikar K. 2002; ITCBP 2003). Furthermore, Government (often a key client within the construction industry),and with its increased tendency to transact its business electronically, undoubtedly has an effect on how various private industry consultants, contractors, suppliers, etc. do business (Murray M. 2003) – by offering a wide range of (current and anticipated) e-facilities / services, including e-Tendering (Ecommerce 2002). Overall, doing business electronically is found to have a profound impact on the way today’s construction businesses operate - streamlining existing processes, with the growth in innovative tools, such as e-Tender, offering the construction industry new responsibilities and opportunities for all parties involved (ITCBP 2003). It is therefore important that these opportunities should be accessible to as many construction industry businesses as possible (The Construction Confederation 2001). Historically, there is a considerable exchange of information between various parties during a tendering process, where accuracy and efficiency of documentation is critical. Traditionally this process is either paper-based (involving large volumes of supporting tender documentation), or via a number of stand-alone, non-compatible computer systems, usually costly to both the client and contractor. As such, having a standard electronic exchange format that allows all parties involved in an electronic tender process to access one system only via the Internet, saves both time and money, eliminates transcription errors and increases speed of bid analysis (The Construction Confederation 2001). Supporting this research project’s aims and objectives, researchers set to determine today’s construction industry ‘current state-of-play’ in relation to e-Tendering opportunities. The report also provides brief introductions to several Australian and International e-Tender systems identified during this investigation. e-Tendering, in its simplest form, is described as the electronic publishing, communicating, accessing, receiving and submitting of all tender related information and documentation via the internet, thereby replacing the traditional paper-based tender processes, and achieving a more efficient and effective business process for all parties involved (NT Governement 2000; NT Government 2000; NSW Department of Commerce 2003; NSW Government 2003). Although most of the e-Tender websites investigated at the time, maintain their tendering processes and capabilities are ‘electronic’, research shows these ‘eTendering’ systems vary from being reasonably advanced to more ‘basic’ electronic tender notification and archiving services for various industry sectors. Research also indicates an e-Tender system should have a number of basic features and capabilities, including: • All tender documentation to be distributed via a secure web-based tender system – thereby avoiding the need for collating paperwork and couriers. • The client/purchaser should be able to upload a notice and/or invitation to tender onto the system. • Notification is sent out electronically (usually via email) for suppliers to download the information and return their responses electronically (online). • During the tender period, updates and queries are exchanged through the same e-Tender system. • The client/purchaser should only be able to access the tenders after the deadline has passed. • All tender related information is held in a central database, which should be easily searchable and fully audited, with all activities recorded. • It is essential that tender documents are not read or submitted by unauthorised parties. • Users of the e-Tender system are to be properly identified and registered via controlled access. In simple terms, security has to be as good as if not better than a manual tender process. Data is to be encrypted and users authenticated by means such as digital signatures, electronic certificates or smartcards. • All parties must be assured that no 'undetected' alterations can be made to any tender. • The tenderer should be able to amend the bid right up to the deadline – whilst the client/purchaser cannot obtain access until the submission deadline has passed. • The e-Tender system may also include features such as a database of service providers with spreadsheet-based pricing schedules, which can make it easier for a potential tenderer to electronically prepare and analyse a tender. Research indicates the efficiency of an e-Tender process is well supported internationally, with a significant number, yet similar, e-Tender benefits identified during this investigation. Both construction industry and Government participants generally agree that the implementation of an automated e-Tendering process or system enhances the overall quality, timeliness and cost-effectiveness of a tender process, and provides a more streamlined method of receiving, managing, and submitting tender documents than the traditional paper-based process. On the other hand, whilst there are undoubtedly many more barriers challenging the successful implementation and adoption of an e-Tendering system or process, researchers have also identified a range of challenges and perceptions that seem to hinder the uptake of this innovative approach to tendering electronically. A central concern seems to be that of security - when industry organisations have to use the Internet for electronic information transfer. As a result, when it comes to e-Tendering, industry participants insist these innovative tendering systems are developed to ensure the utmost security and integrity. Finally, if Australian organisations continue to explore the competitive ‘dynamics’ of the construction industry, without realising the current and future, trends and benefits of adopting innovative processes, such as e-Tendering, it will limit their globalising opportunities to expand into overseas markets and allow the continuation of international firms successfully entering local markets. As such, researchers believe increased knowledge, awareness and successful implementation of innovative systems and processes raises great expectations regarding their contribution towards ‘stimulating’ the globalisation of electronic procurement activities, and improving overall business and project performances throughout the construction industry sectors and overall marketplace (NSW Government 2002; Harty C. 2003; Murray M. 2003; Pietroforte R. 2003). Achieving the successful integration of an innovative e-Tender solution with an existing / traditional process can be a complex, and if not done correctly, could lead to failure (Bourn J. 2002).
Resumo:
Australia’s civil infrastructure assets of roads, bridges, railways, buildings and other structures are worth billions of dollars. Road assets alone are valued at around A$ 140 billion. As the condition of assets deteriorate over time, close to A$10 billion is spent annually in asset maintenance on Australia's roads, or the equivalent of A$27 million per day. To effectively manage road infrastructures, firstly, road agencies need to optimise the expenditure for asset data collection, but at the same time, not jeopardise the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates could be accurately estimated. And finally, the prediction of budgets for maintenance and rehabilitation must provide a certain degree of reliability. A procedure for assessing investment decision for road asset management has been developed. The procedure includes: • A methodology for optimising asset data collection; • A methodology for calibrating deterioration prediction models; • A methodology for assessing risk-adjusted estimates for life-cycle cost estimates. • A decision framework in the form of risk map