917 resultados para Wind Power Industry


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Anàlisi territorial del litoral català mitjançant una sèrie de variables tractades amb sistemes d’informació geogràfica (recurs eòlic, perfil batimètric, zones incloses en Xarxa Natura 2000, subestacions elèctriques vora la costa) per tal de localitzar les zones òptimes d’implantació d’un parc eòlic marí

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Análisis del riesgo de oportunismo del gobierno Colombiano planteado por el diseño institucional y normativo de la CREG, y favorecido por una notoria concentración de calidades en cabeza del Estado Colombiano como agente de mercado y regulador.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

El presente documento ofrece un estudio del perfil logístico de Portugal, abarcando diferentes aspectos que afectan la competitividad y el desempeño de la cadena logística de un país, con la finalidad de conocer a uno de los socios comerciales con los cuáles Colombia se encuentra negociando, en este caso Portugal, uno de los 28 países que hace parte del reciente tratado de libre comercio aprobado con la Unión Europea, es preciso estudiar las ventajas competitivas que poseen dichos socios, a las cuales el país se enfrenta en un mundo globalizado. Para el desarrollo de este trabajo se determinaron a partir de un análisis competitivo del país; las principales ciudades y puertos; logrando establecer un completo panorama de la situación logística en Portugal.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Objetivo: Evaluar la percepción que tienen los trabajadores acerca del sistema de seguridad y salud en el trabajo en la población asistencial y administrativa en un Hospital de III nivel de atención., Bogotá-Colombia. Materiales y métodos: Estudio de corte transversal en población de trabajadores asistenciales y administrativos. Se aplicó el “Cuestionario Nórdico Sobre Seguridad en el Trabajo NOSACQ 50 Spanish” validado. La muestra fue probabilística estratificada aleatoria, en 308 trabajadores (230 asistenciales y 78 administrativos). Resultados: El promedio de edad fue 39.5± 12 años, con mayor frecuencia de género femenino (74.68%), estado civil soltero (38.96%) y nivel educativo técnico (34.40%). La percepción que tienen los trabajadores acerca del sistema de seguridad y salud en el trabajo fue independiente de su tipo de actividad laboral administrativa y asistencial (p>0.05), la mayor percepción en ambos grupos fue la confianza de los trabajadores en la eficacia del sistema de seguridad (2.71 y 2.77), y las de menor percepción presentaron el empoderamiento de seguridad de gestión (2.35 y 2.46) y la seguridad como prioridad de los empleados y rechazo del riesgo (2.35 y 2.40). Conclusiones: Los trabajadores del Hospital tienen un nivel adecuado de buena percepción acerca de los aspectos de seguridad y salud en el trabajo donde se evidenció que la fortaleza es la confianza de los trabajadores en la eficacia del sistema y la debilidad del sistema se encuentra en la falta de empoderamiento y rechazo al riesgo.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The Bahrain International Circuit (BIC) and complex, at latitude 26.00N and longitude 51.54E, was built in 483 days and cost 150 million US$. The circuit consists of six different individual tracks with a 3.66 km outer track (involving 10 turns) and a 2.55 km inner track (having six turns). The complex has been designed to host a variety of other sporting activities. Fifty thousand spectators, including 10,500 in the main grandstand, can be accommodated simultaneously. State-of-the art on-site media and broadcast facilities are available. The noise level emitted from vehicles on the circuit during the Formula-1 event, on April 4th 2004, was acceptable and caused no physical disturbance to the fans in the VIP lounges or to scholars studying at the University of Bahrain's Shakeir Campus, which is only 1.5 km away from the circuit. The sound-intensity level (SIL) recorded on the balcony of the VIP lounge was 128 dB(A) and was 80 dB(A) inside the lounge. The calculated SIL immediately outside the lecture halls of the University of Bahrain was 70 dB(A) and 65 dB(A) within them. Thus racing at BIC can proceed without significantly disturbing the academic-learning process. The purchased electricity demand by the BIC complex peaked (at 4.5 MW) during the first Formula-1 event on April 4th 2004. The reverse-osmosis (RO) plant at the BIC provides 1000 m(3) of desalinated water per day for landscape irrigation. Renewable-energy inputs, (i.e., via solar and wind power), at the BIC could be harnessed to generate electricity for water desalination, air conditioning, lighting as well as for irrigation. If the covering of the BIC complex was covered by adhesively fixed modern photovoltaic cells, then similar to 1.2 MW of solar electricity could be generated. If two horizontal-axis, at 150 m height above the ground, three 75m bladed, wind turbines were to be installed at the BIC, then the output could reach 4 MW. Furthermore, if 10,000 Jojoba trees (a species renowned for having a low demand for water, needing only five irrigations per year in Bahrain and which remain green throughout the year) are planted near the circuit, then the local micro-climate would be improved with respect to human comfort as well as the local environment becoming cleaner.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

The main instrument of the Government's renewable energy policy is to promote wind power through regulation and subsidy. This gives rise to anomalies in rural planning when turbines are erected in sensitve areas in which other forms of development are strictly controlled. The situation is reviewed in the context of economic viability and considered also against the alternative of growing fuel crops. The latter are currently hampered by lack of Government support but could fulfil a useful secondary role of sustaining the agricultural sector and with it the management of lowland landscapes.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Accurate replication of the processes associated with the energetics of the tropical ocean is necessary if coupled GCMs are to simulate the physics of ENSO correctly, including the transfer of energy from the winds to the ocean thermocline and energy dissipation during the ENSO cycle. Here, we analyze ocean energetics in coupled GCMs in terms of two integral parameters describing net energy loss in the system using the approach recently proposed by Brown and Fedorov (J Clim 23:1563–1580, 2010a) and Fedorov (J Clim 20:1108–1117, 2007). These parameters are (1) the efficiency c of the conversion of wind power into the buoyancy power that controls the rate of change of the available potential energy (APE) in the ocean and (2) the e-folding rate a that characterizes the damping of APE by turbulent diffusion and other processes. Estimating these two parameters for coupled models reveals potential deficiencies (and large differences) in how state-of-the-art coupled GCMs reproduce the ocean energetics as compared to ocean-only models and data assimilating models. The majority of the coupled models we analyzed show a lower efficiency (values of c in the range of 10–50% versus 50–60% for ocean-only simulations or reanalysis) and a relatively strong energy damping (values of a-1 in the range 0.4–1 years versus 0.9–1.2 years). These differences in the model energetics appear to reflect differences in the simulated thermal structure of the tropical ocean, the structure of ocean equatorial currents, and deficiencies in the way coupled models simulate ENSO.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This thesis examines prerequisites for wind power diffusion in a county in Sweden that quite recently was concidered to be of interest for electricty production from renewable energy sources. Three different municipalities: Falun, Mora and Orsa in the county of Dalarna are highlighted.  Their view on permitting processes of wind power installations are investigated. Other actors, such as exploiters and local citizens are also being analysed. This study shows that the local acceptance was very high when the first wind power parks were built, much thanks to local politicians and local citizens. For the politicians the wind power symbolised a key to a better green society, for the local citizens the wind power meant some economical advantages. The first wind power parks were localised to areas because of good wind conditions and social factors, especially from local communities. However, results from this study shows that the acceptance for wind power the last few years, in generel, has decreased.  The local authorities have also been conscious of some negative consequenses from already built wind power parks.  As a response they started to add planning tools to the permitting process.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This thesis evaluates different sites for a weather measurement system and a suitable PV- simulation for University of Surabaya (UBAYA) in Indonesia/Java. The weather station is able to monitor all common weather phenomena including solar insolation. It is planned to use the data for scientific and educational purposes in the renewable energy studies. During evaluation and installation it falls into place that official specifications from global meteorological organizations could not be meet for some sensors caused by the conditions of UBAYA campus. After arranging the hardware the weather at the site was monitored for period of time. A comparison with different official sources from ground based and satellite bases measurements showed differences in wind and solar radiation. In some cases the monthly average solar insolation was deviating 42 % for satellite-based measurements. For the ground based it was less than 10 %. The average wind speed has a difference of 33 % compared to a source, which evaluated the wind power in Surabaya. The wind direction shows instabilities towards east compared with data from local weather station at the airport. PSET has the chance to get some investments to investigate photovoltaic on there own roof. With several simulations a suitable roof direction and the yearly and monthly outputs are shown. With a 7.7 kWpeak PV installation with the latest crystalline technology on the market 8.82 MWh/year could be achieved with weather data from 2012. Thin film technology could increase the value up to 9.13 MWh/year. However, the roofs have enough area to install PV. Finally the low price of electricity in Indonesia makes it not worth to feed in the energy into the public grid.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

This paper generalizes the HEGY-type test to detect seasonal unit roots in data at any frequency, based on the seasonal unit root tests in univariate time series by Hylleberg, Engle, Granger and Yoo (1990). We introduce the seasonal unit roots at first, and then derive the mechanism of the HEGY-type test for data with any frequency. Thereafter we provide the asymptotic distributions of our test statistics when different test regressions are employed. We find that the F-statistics for testing conjugation unit roots have the same asymptotic distributions. Then we compute the finite-sample and asymptotic critical values for daily and hourly data by a Monte Carlo method. The power and size properties of our test for hourly data is investigated, and we find that including lag augmentations in auxiliary regression without lag elimination have the smallest size distortion and tests with seasonal dummies included in auxiliary regression have more power than the tests without seasonal dummies. At last we apply the our test to hourly wind power production data in Sweden and shows there are no seasonal unit roots in the series.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Nos últimos anos, a indústria elétrica brasileira passou, basicamente, por duas reestruturações setoriais, implantadas segundo políticas e ideologias divergentes, mas que convergiram para o mesmo objetivo final: a busca por investimentos privados para dar suporte à expansão do sistema. Esse é o grande desafio do novo modelo institucional de 2004, que surge em um ambiente conturbado, de forte percepção de riscos e incertezas. A própria instabilidade regulatória é a grande responsável pelo recuo e ponderação na hora de investir. Contudo, a pergunta que se faz na presente pesquisa objetiva identificar os fatores motivadores da nova reestruturação setorial. Só assim, pode-se correlacionar os fatos do passado com a recente reforma, identificando possíveis deficiências e fatores críticos de sucesso. Para tanto, o presente estudo recorreu à literatura existente, assim como a entrevistas semi-estruturadas com especialistas do setor elétrico brasileiro. Os dados foram analisados qualitativamente, por meio de categorias estabelecidas a posteriori, buscando-se aceitar ou refutar suposições. As evidências sugerem que, apesar de a nova reforma institucional ter realizado avanços, ao introduzir mecanismos absorvidos, principalmente, a partir das experiências regulatórias dos últimos anos, dificuldades ainda permanecem e devem ser enfrentadas, especialmente no que tange à mitigação dos riscos ambientais e regulatórios, este último, percebido com maior intensidade a partir de 2004. Sendo assim, cabe ao governo federal, representado pelo Ministério de Minas e Energia (MME), conseguir atrair investimentos e proporcionar estabilidade regulatória, a fim de afastar o “fantasma” do racionamento.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

O objetivo deste trabalho é mostrar através de um estudo de caso que a implantação de um modelo de organização da produção e do trabalho baseado na gestão por processos pode acenar com uma perspectiva pós-fordista para a atividade de operação de sistemas de energia elétrica. As grandes empresas brasileiras do setor de energia elétrica adotaram, desde a sua criação, um modelo organizacional com base nas funções gerenciais propostas por Henri Fayol, sendo estruturadas de forma vertical e hierárquica. Por outro lado, as tarefas realizadas nas salas de controle dos Centros de Operação dessas empresas se processam de acordo com a forma preconizada pelo sistema de Administração Científica de Frederick Taylor e pelos princípios propostos por Henry Ford. Porém, em decorrência da mudança do modelo institucional do setor de energia, ocorrida em meados da década de 90, além da maior conscientização da sociedade a respeito dos seus direitos de cidadania e também da busca dos trabalhadores pela democratização nas relações sociais em seu ambiente de trabalho, as empresas de energia elétrica foram compelidas a buscar novas formas de gestão mais adequadas ao novo cenário cultural, político, social e econômico. Em FURNAS, como nova forma de organização da produção e do trabalho, o Departamento de Operação do Sistema resolveu adotar um sistema baseado na gestão por processos que respeita a estrutura funcional da Empresa, formando, assim, uma estrutura organizacional matricial. Por outro lado, observou-se que, dependendo da forma de implantação e dos mecanismos de gestão adotados, esse novo sistema podia acenar com uma perspectiva pós-fordista para a atividade de operação de sistemas elétricos de grande porte que, tipicamente, no Brasil, é desenvolvida por empresas fayolistas, segundo uma perspectiva taylorista-fordista. Para verificar se essa possibilidade se concretizou foi realizada uma pesquisa que abrangeu os cinco Centros de Operação do Departamento de Operação do Sistema de FURNAS Centrais Elétricas S.A., tomando como elemento-chave a seguinte caracterização do paradigma do pós-fordismo: diferenciação integrada da organização da produção e do trabalho sob a trajetória de inovação tecnológica em direção à ~ democratização das relações sociais nos sistemas-empresa. O trabalho apresenta a percepção da evolução nos relacionamentos interpessoais e a percepção das ações gerenciais empreendidas visando a implantação do novo sistema, bem como também mostra as transformações ocorridas no tocante à democratização das relaçõe~ sociais no Departamento, entre outros fatores que substanciam a pesquisa, cujo resultado aponta para uma nova forma de gestão do trabalho e da produção em que essas relações sociais tendem a ser pautadas por ações gerenciais dialógicas que caracterizam a perspectiva pós-fordista.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Offshore wind power emits low amounts of gases, is renewable and has better performance than onshore due to its greater stability and higher wind power density, less visual and noise impact, among others. Brazil has a high capacity of generation, but has not yet developed any offshore projects. High costs are a strong impediment. This study is an effort towards pricing offshore resources through Livelized Cost of Energy - LCOE, which represents the minimum return to cover the costs of development, production and maintenance of a wind project. Initially LCOE was calculated for all Brazilian onshore wind farms listed at Bloomberg New Energy Finance R○, accounting for 71 farms. Then hypothetical offshore wind farms were created from the onshore farms, tripling the cost of generation, which is consistent with the literature, and estimating the offshore energy for two locations off the Brazilian coast using satellite data extracted from National Oceanic and Atmospheric Administration. The results demonstrate that offshore resources have the potential to significantly reduce the energy price due to the better performance of the wind at sea