974 resultados para Lorenz curve
Resumo:
Both cointegration methods, and non-cointegrated structural VARs identified based on either long-run restrictions, or a combination of long-run and sign restrictions, are used in order to explore the long-run trade-off between inflation and the unemployment rate in the post-WWII U.S., U.K., Euro area, Canada, and Australia. Overall, neither approach produces clear evidence of a non-vertical trade-off. The extent of uncertainty surrounding the estimates is however substantial, thus implying that a researcher holding alternative priors about what a reasonable slope of the long-run trade-off might be will likely not see her views falsified
Resumo:
El propósito de la presente investigación es determinar si, a través del estudio y análisis de los estudios de tráfico en autopistas de peaje, se pueden determinar las razones de los incumplimientos en las previsiones de estos estudios. La metodología se basa en un análisis empírico ex- post facto de los estudios de tráfico contenidos en los anteproyectos de las autopistas Radial 3 y Radial 5 y los datos realmente verificados. Tras una introducción para presentar las principales características de las autopistas de peaje, se realiza una revisión de la bibliografía sobre el cumplimiento de las previsiones de tráfico. Lo anterior permite establecer una serie de aspectos que pueden contribuir a estos incumplimientos, así como una serie de medidas encontradas para mejorar las futuras previsiones. Ya en el núcleo fundamental de la investigación, esta se centra en el análisis del cumplimiento de las previsiones de tráfico contenidas en los anteproyectos de la Radial 3 y Radial 5. Se realiza un análisis crítico de la metodología adoptada, así como de las variables e hipótesis realizadas. Tras este primer análisis, se profundiza en la fase de asignación de los estudios. Siempre con base a los tráficos reales y para el año 2006, se cuantifica el efecto en los incumplimientos, por un lado de las variables utilizadas, y por otro, del propio método ó curva de asignación. Finalmente, y con base en los hallazgos anteriores, se determinan una serie de limitaciones en el método de asignación de tráficos entre recorridos alternativos para el caso de entornos urbanos usado. El planteamiento con base a las teorías del agente racional y maximización de la utilidad esperada es criticado desde la perspectiva de la teoría de decisión bajo condiciones de riesgo planteada por Kahneman y Tversky. Para superar las limitaciones anteriores, se propone una nueva curva de asignación semi empírica que relaciona la proporción del tráfico que circula por la autopista de peaje con la velocidad media en la autovía libre alternativa. ABSTRACT The aim of this research is to confirm whether the forensic analysis of the traffic forecast studies for tolled highways may bring to light the reasons behind the lack of accuracy. The methodology used on this research is empirical and is based on the ex –post facto analysis of the real traffic numbers compared to the forecasted for the tolled highways Radial 3 and Radial 5. Firstly the main features of tolled highways are presented as an introductory chapter. Secondly a broad bibliographic search is presented, this is done from a global perspective and from the Spanish perspective too. From this review, a list of the main causes behind the systematic inaccuracy together with measures to improve future traffic forecast exercises are shown. In what we could consider as the core of the research, it focuses on the ratios of actual / forecast traffic for the tolled highways Radial 3 y Radial 5 in Madrid outskirts. From a critical perspective, the methodology and inputs used in the traffic studies are analysed. In a further step, the trip assignment stage is scrutinised to quantify the influence of the inputs and the assignment model itself in the accuracy of the traffic studies. This exercise is bases on the year 2006. Finally, the assignment model used is criticised for its application in tolled urban highways. The assumptions behind the model, rational agent and expected utility maximization theories, are questioned under the theories presented by Kahneman and Tversky (Prospect Theory). To overcome these assignment model limitations, the author presents a semi empiric new diversion curve. This curve links the traffic proportion using the tolled highway and the average speed in the toll free alternative highway.
Resumo:
In the Line of Investigation that in the department of “Technical Drawing” in the School of Agriculture Engineering of Madrid, we carry out on the study of The Technical Curves and his singularities, we demonstrate an interesting property of the Logarithmic Spiral. The demonstrated property consists of which the logarithmic spiral is a autoisoptic curve, that is to say that if from a point P anyone of the spiral tangent straight lines draw up to the previous arc, these form a constant angle α. This demonstration is novel and in addition we get to contribute a method to calculate the angle α given the equation of the spiral.
Resumo:
This paper presents the measurement of the I-V curve of an 800 kW PV generator by means of an own-made capacitive load. Along the lines of some previous works, it is shown that an I-V curve analysis can also be applied to big PV generators and that, when measuring the operating conditions with reference modules and taking some precautions (especially regarding the operating cell temperature), it is still a useful tool for characterizing them and therefore can be incorporated into maintenance procedures. As far as we know, this is the largest I-V curve measured so far.
Resumo:
This paper presents the measurement of the I-V curve of a 500-kW PV generator by means of an own-made capacitive load. It is shown that I-V curve analysis can also be applied to big PV generators and that when measuring the operation conditions with reference modules and taking some precautions (especially regarding the operation cell temperature), it is still a useful tool for characterizing them and therefore can be incorporated into maintenance procedures. As far as we know, this is the largest I-V curve measured so far.
Resumo:
An application of the Finite Element Method (FEM) to the solution of a geometric problem is shown. The problem is related to curve fitting i.e. pass a curve trough a set of given points even if they are irregularly spaced. Situations where cur ves with cusps can be encountered in the practice and therefore smooth interpolatting curves may be unsuitable. In this paper the possibilities of the FEM to deal with this type of problems are shown. A particular example of application to road planning is discussed. In this case the funcional to be minimized should express the unpleasent effects of the road traveller. Some comparative numerical examples are also given.
Resumo:
Mercury intrusion porosimetry (MIP) has been widely used to evaluate the quality of concrete through the pore size distribution parameters. Two of these parameters are the critical pore diameter (Dcrit) and the percentage of the most interconnected net of pores compared to the total volume of pores. Some researchers consider Dcrit as the diameter obtained from the inflexion point of the cumulative mercury intrusion curve while others consider Dcrit as the diameter obtained from the point of abrupt variation in the same curve. This study aims to analyze two groups of concretes of varying w/c ratios, one cast with pozzolanic cement and another with high initial strength cement, in order to determine which of these diameters feature a better correlation with the quality parameters of the concretes. The concrete quality parameters used for the evaluations were (1) the w/c ratios and (2) chloride diffusion coefficients measured at approximately 90 days. MIP cumulative distributions of the same concretes were also measured at about 90 days, and Dcrit values were determined (1) from the point of abrupt variation and alternatively, (2) from the inflexion point of each of these plots. It was found that Dcrit values measured from the point of abrupt variation were useful indicators of the quality of the concrete, but the Dcrit values based on the inflexion points were not. Hence, it is recommended that Dcrit and the percentage of the most interconnected volume of pores should be obtained considering the point of abrupt variation of the cumulative curve of pore size distribution.
Resumo:
At present, the market is severely mispricing Greece’s sovereign risk relative to the country’s fundamentals. As a result of the mispricing, financial intermediation in Greece has become dysfunctional and the privatisation of state-owned assets has stalled. This mispricing is partially due to an illiquid and fragmented government yield curve. A well-designed public liability management exercise can lead to a more efficient pricing of Greece’s government bonds and thereby help restore stable and affordable financing for the country’s private sector, which is imperative in order to overcome Greece’s deep recession. This paper proposes three measures to enhance the functioning of the Greek government debt market: i) Greece should issue a new five-year bond, ii) it should consolidate the 20 individual series of government bonds into four liquid securities and iii) it should offer investors a swap of these newly created bonds into dollar-denominated securities. Each of these measures would be beneficial to the Hellenic Republic, since the government would be able to reduce the face value and the net present value of its debt stock. Furthermore, this exercise would facilitate the resumption of market access, which is a necessary condition for continuous multilateral disbursements to Greece.
Resumo:
"AEC report no. C00-2383-002."
Resumo:
Federal Highway Administration, Demonstration Projects Division, Arlington, Va.
Resumo:
Mode of access: Internet.
Resumo:
Thesis (M.A.)--Univ. of California. Dec. 1916,
Resumo:
Mode of access: Internet.