988 resultados para Hydrothermal scheduling problems
Resumo:
1 – Summary of the decision taken by the Portuguese Constitutional Court, of January 13, 2011; 2 – Complete text of the decision of the Portuguese Constitutional Court, of January 13, 2011, Judge Maria João ANTUNES (Reporter), Judge Carlos Pamplona de OLIVEIRA, Judge José Borges SOEIRO, Judge Gil GALVÃO, Judge Rui Manuel Moura RAMOS (President) –in terms of the tribunalconstitucional.pt, August 1, 2011; 3 – Brief annotation to the problem of the “medical act”; 3.1 – Plus some conclusions on the brief annotation to the problem of the “medical act”; 3.2 – Brief annotation to the problem of “consent”– continuation of the previous comments; 4 – Conclusions. It must never be forgotten that “consent” does not stand as the only cause of exclusion of unlawfulness.
Resumo:
This article was written by a Swiss-German historical demographer after having visited different Brazilian Universities in 1984 as a guest-professor. It aims at promoting a real dialog between developed and developing countries, commencing the discussion with the question: Can we learn from each other? An affirmative answer is given, but not in the superficial manner in which the discussion partners simply want to give each other some "good advice" or in which the one declares his country's own development to be the solely valid standard. Three points are emphasized: 1. Using infant mortality in S. Paulo from 1908 to 1983 as an example, it is shown that Brazil has at its disposal excellent, highly varied research literature that is unjustifiably unknown to us (in Europe) for the most part. Brazil by no means needs our tutoring lessons as regards the causal relationships; rather, we could learn two things from Brazil about this. For one, it becomes clear that our almost exclusively medical-biological view is inappropriate for passing a judgment on the present-day problems in Brazil and that any conclusions so derived are thus only transferable to a limited extent. For another, we need to reinterpret the history of infant mortality in our own countries up to the past few decades in a much more encompassing "Brazilian" sense. 2. A fruitful dialog can only take place if both partners frankly present their problems. For this reason, the article refers with much emprasis to our present problems in dealing with death and dying - problems arising near the end of the demographic and epidemiologic transitions: the superanuation of the population, chronic-incurable illnesses as the main causes of death, the manifold dependencies of more and more elderly and really old people at the end of a long life. Brazil seems to be catching up to us in this and will be confronted with these problems sooner or later. A far-sighted discussion already at this time seems thus to be useful. 3. The article, however, does not want to conclude with the rather depressing state of affairs of problems alternatingly superseding each other. Despite the caution which definitely has a place when prognoses are being made on the basis of extrapolations from historical findings, the foreseeable development especially of the epidemiologic transition in the direction of a rectangular survival curve does nevertheless provide good reason for being rather optimistic towards the future: first in regards to the development in our own countries, but then - assuming that the present similar tendencies of development are stuck to - also in regard to Brazil.
Resumo:
This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning head-dependent reservoirs under competitive environment. We propose a novel method, based on mixed-integer nonlinear programming (MINLP), for optimising power generation efficiency. This method considers hydroelectric power generation as a nonlinear function of water discharge and of the head. The main contribution of this paper is that discharge ramping constraints and start/stop of units are also considered, in order to obtain more realistic and feasible results. The proposed method has been applied successfully to solve two case studies based on Portuguese cascaded hydro systems, providing a higher profit at an acceptable computation time in comparison with classical optimisation methods based on mixed-integer linear programming (MILP).
Resumo:
This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain We propose a novel mixed-integer nonlinear programming (MINLP) approach, considering hydroelectric power generation as a nonlinear function of water discharge and of the head. As a new contribution to eat her studies, we model the on-off behavior of the hydro plants using integer variables, in order to avoid water discharges at forbidden areas Thus, an enhanced STHS is provided due to the more realistic modeling presented in this paper Our approach has been applied successfully to solve a test case based on one of the Portuguese cascaded hydro systems with a negligible computational time requirement.
Resumo:
This paper is on the problem of short-term hydro, scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach.
Resumo:
Thirty years ago, G.N. de Oliveira has proposed the following completion problems: Describe the possible characteristic polynomials of [C-ij], i,j is an element of {1, 2}, where C-1,C-1 and C-2,C-2 are square submatrices, when some of the blocks C-ij are fixed and the others vary. Several of these problems remain unsolved. This paper gives the solution, over the field of real numbers, of Oliveira's problem where the blocks C-1,C-1, C-2,C-2 are fixed and the others vary.
Resumo:
This paper proposes a wind power forecasting methodology based on two methods: direct wind power forecasting and wind speed forecasting in the first phase followed by wind power forecasting using turbines characteristics and the aforementioned wind speed forecast. The proposed forecasting methodology aims to support the operation in the scope of the intraday resources scheduling model, namely with a time horizon of 5 minutes. This intraday model supports distribution network operators in the short-term scheduling problem, in the smart grid context. A case study using a real database of 12 months recorded from a Portuguese wind power farm was used. The results show that the straightforward methodology can be applied in the intraday model with high wind speed and wind power accuracy. The wind power forecast direct method shows better performance than wind power forecast using turbine characteristics and wind speed forecast obtained in first phase.
Resumo:
The use of distributed energy resources, based on natural intermittent power sources, like wind generation, in power systems imposes the development of new adequate operation management and control methodologies. A short-term Energy Resource Management (ERM) methodology performed in two phases is proposed in this paper. The first one addresses the day-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. The ERM scheduling is a complex optimization problem due to the high quantity of variables and constraints. In this paper the main goal is to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixedinteger non-linear programming approach. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units and 1000 electric vehicles has been implemented in a simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.
Resumo:
Smart Grids (SGs) appeared as the new paradigm for power system management and operation, being designed to integrate large amounts of distributed energy resources. This new paradigm requires a more efficient Energy Resource Management (ERM) and, simultaneously, makes this a more complex problem, due to the intensive use of distributed energy resources (DER), such as distributed generation, active consumers with demand response contracts, and storage units. This paper presents a methodology to address the energy resource scheduling, considering an intensive use of distributed generation and demand response contracts. A case study of a 30 kV real distribution network, including a substation with 6 feeders and 937 buses, is used to demonstrate the effectiveness of the proposed methodology. This network is managed by six virtual power players (VPP) with capability to manage the DER and the distribution network.
Resumo:
The reactive power management is an important task in future power systems. The control of reactive power allows the increase of distributed energy resources penetration as well as the optimal operation of distribution networks. Currently, the control of reactive power is only controlled in large power units and in high and very high voltage substations. In this paper a reactive power control in smart grids paradigm is proposed, considering the management of distributed energy resources and of the distribution network by an aggregator namely Virtual Power Player (VPP).
Resumo:
Effective legislation and standards for the coordination procedures between consumers, producers and the system operator supports the advances in the technologies that lead to smart distribution systems. In short-term (ST) maintenance scheduling procedure, the energy producers in a distribution system access to the long-term (LT) outage plan that is released by the distribution system operator (DSO). The impact of this additional information on the decision-making procedure of producers in ST maintenance scheduling is studied in this paper. The final ST maintenance plan requires the approval of the DSO that has the responsibility to secure the network reliability and quality, and other players have to follow the finalized schedule. Maintenance scheduling in the producers’ layer and the coordination procedure between them and the DSO is modelled in this paper. The proposed method is applied to a 33-bus distribution system.
Resumo:
n this paper we make an exhaustive study of the fourth order linear operator u((4)) + M u coupled with the clamped beam conditions u(0) = u(1) = u'(0) = u'(1) = 0. We obtain the exact values on the real parameter M for which this operator satisfies an anti-maximum principle. Such a property is equivalent to the fact that the related Green's function is nonnegative in [0, 1] x [0, 1]. When M < 0 we obtain the best estimate by means of the spectral theory and for M > 0 we attain the optimal value by studying the oscillation properties of the solutions of the homogeneous equation u((4)) + M u = 0. By using the method of lower and upper solutions we deduce the existence of solutions for nonlinear problems coupled with this boundary conditions. (C) 2011 Elsevier Ltd. All rights reserved.
Resumo:
The introduction of new distributed energy resources, based on natural intermittent power sources, in power systems imposes the development of new adequate operation management and control methods. This paper proposes a short-term Energy Resource Management (ERM) methodology performed in two phases. The first one addresses the hour-ahead ERM scheduling and the second one deals with the five-minute ahead ERM scheduling. Both phases consider the day-ahead resource scheduling solution. The ERM scheduling is formulated as an optimization problem that aims to minimize the operation costs from the point of view of a virtual power player that manages the network and the existing resources. The optimization problem is solved by a deterministic mixed-integer non-linear programming approach and by a heuristic approach based on genetic algorithms. A case study considering a distribution network with 33 bus, 66 distributed generation, 32 loads with demand response contracts and 7 storage units has been implemented in a PSCADbased simulator developed in the field of the presented work, in order to validate the proposed short-term ERM methodology considering the dynamic power system behavior.