Scheduling of head-dependent cascaded reservoirs considering discharge ramping constraints and start/stop of units


Autoria(s): Catalão, João Paulo da Silva; Pousinho, Hugo Miguel Inácio; Mendes, Víctor Manuel Fernandes
Data(s)

28/11/2011

28/11/2011

01/10/2010

Resumo

This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning head-dependent reservoirs under competitive environment. We propose a novel method, based on mixed-integer nonlinear programming (MINLP), for optimising power generation efficiency. This method considers hydroelectric power generation as a nonlinear function of water discharge and of the head. The main contribution of this paper is that discharge ramping constraints and start/stop of units are also considered, in order to obtain more realistic and feasible results. The proposed method has been applied successfully to solve two case studies based on Portuguese cascaded hydro systems, providing a higher profit at an acceptable computation time in comparison with classical optimisation methods based on mixed-integer linear programming (MILP).

Identificador

Catalão J P S, Pousinho H M I, Mendes V M F. Scheduling of head-dependent cascaded reservoirs considering discharge ramping constraints and start/stop of units.Source: International Journal of Electrical Power & Energy Systems. 2010; 32 (8): 904-910.

0142-0615

http://hdl.handle.net/10400.21/703

Idioma(s)

eng

Publicador

Elsevier SCI LTD

Relação

8;

Direitos

restrictedAccess

Palavras-Chave #Short-term hydro scheduling (STHS) #Electricity market #Head dependence #Mixed-integer nonlinear programming (MINLP)
Tipo

article