940 resultados para significant project
Resumo:
Project focused group work is significant in developing social and personal skills as well as extending the ability to identify, formulate and solve engineering problems. As a result of increasing undergraduate class sizes, along with the requirement for many students to work part-time, group projects, peer and collaborative learning are seen as a fundamental part of engineering education. Group formation, connection to learning objectives and fairness of assessment has been widely reported as major issues that leave students dissatisfied with group project based units. Several strategies were trialled including a study of formation of groups by different methods across two engineering disciplines over the past 2 years. Other strategies involved a more structured approach to assessment practices of civil and electrical engineering disciplines design units. A confidential online teamwork management tool was used to collect and collate student self and peer assessment ratings and used for both formative feedback as well as assessment purposes. Student satisfaction and overall academic results in these subjects have improved since the introduction of these interventions. Both student and staff feedback highlight this approach as enhancing student engagement and satisfaction, improved student understanding of group roles, reducing number of dysfunctional groups whilst requiring less commitment of academic resources.
Resumo:
The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP ----- ----- Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trial. ----- ----- Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. ----- ----- This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.
Resumo:
Project alliancing is a new alternative to traditional project delivery systems, especially in the commercial building sector. The Collaborative Process is a theoretical model of people and systems characteristics that are required to reduce the adversarial nature of most construction projects. Although developed separately, both are responses to the same pressures. Project alliancing was just used successfully to complete the National Museum of Australia. This project was analyzed as a case study to determine the extent to which it could be classified as a “collaborative project”. Five key elements of The Collaborative Process were reviewed and numerous examples from the management of this project were cited that support the theoretical recommendations of this model. In the case of this project, significant added value was delivered to the client and many innovations resulted from the collective work of the parties to the contract. It was concluded that project alliances for commercial buildings offer many advantages over traditional project delivery systems, which are related to increasing the levels of collaboration among a project management team.
Resumo:
Significant differences between project partnering and project alliancing occur in the selection process, management structure of the organisations undertaking the project and nature of risk and reward incentives. This paper helps clarify the nature of project alliancing and how alliance member organisations were selected for this case study. A core issue that differentiates between the two approaches is that in partnering, partners may reap rewards at the expense of other partners. In alliancing each alliance member places their profit margin and reward structure ÁÁat riskÂÂ. Thus in alliancing, the entire alliance entity either benefits together or not all. This fundamentally changes the motivation and dynamics of the relationship between alliance members.
Resumo:
The Acton Peninsula project alliance is the first project alliance in building construction in the world. The project alliance is set out to achieve the best possible outcome for the project with all participants in the alliance sharing both risks and rewards. The construction of the National Museum of Australia and the Australian Institute of Aboriginal and Torres Strait Islander Studies, on Acton Peninsula in Canberra, will be a significant Australian architectural and construction achievement. The design and construction project team is committed to achieve outstanding results in all aspects of the design, construction and delivery of this significant national project. Innovation and creativity are valued, and outstanding performance will be rewarded.
Resumo:
There has recently been noted a rapid increase in research attention to projects that involve outside partners. Our knowledge of such inter-organizational projects, however, is limited. This paper reports large scale data from a repeated trend survey amongst 2000 SMEs in 2006 and 2009 that focused on inter-organizational project ventures. Our major findings indicate that the overall prevalence of inter-organizational project ventures remained significant and stable over time, even despite the economic crisis. Moreover, we find that these ventures predominantly solve repetitive rather than unique tasks and are embedded in prior relations between the partnering organizations. These findings provide empirical support for the recent claims that project management should pay more attention to inter-organizational forms of project organization, and suggest that the archetypical view of projects as being unique in every respect should be reconsidered. Both have important implications for project management, especially in the area of project-based learning.
Resumo:
Studies indicate project success should be viewed from the different perspectives of the individual stakeholders. Project managers are owner’s agents. In order to allow early corrective actions to take place in case a project is diverted from plan, to accurately report perceived success of the stakeholders by project managers is essential, though there has been little systematic research in this area. The aim of this paper is to report the fi ndings of an empirical study that compares the level of agreement between project managers and key stakeholders on a list of project performance indicators. A telephone survey involving 18 complex project managers and various key project stakeholder groups was conducted in this study. Krippendorff’s Kappa alpha reliability test was used to assess the agreement level between project managers and stakeholders. While the overall agreement level between project manager and stakeholders is medium, results have also identified 12 performance indicators that have significant level of agreement between project managers and stakeholders.
Resumo:
Both Knowledge Management (KM) and Project Management (PM) are known as crucial factors to develop competitive advantage(CA). PM Office (PMO) is recognized as a strong solution to institutionalize PM practices in organization. However, according to the literature there is a significant gap in addressing KM practices in the PMO. In other words, existing PMO maturity models has not been addressed from KM perceptive. This paper discusses undertaken investigations of both KM and PM as an initial part of PhD research on the role of knowledge in PMO
Resumo:
In this paper, an ‘ecological’ lens is applied to an independent living project aiming to provide ‘homes for life’ for adult children with disabilities. The qualities of the project as ecological praxis are highlighted along with the implications for an open-ended enquiry into ecologies for and of the interior. In terms of the ecological concern for intimate modes of being, interior design is shown to be well placed through its association with environments in which people spend most of their life and through powerful concepts such as ‘interiority’ and ‘home’ which link to fundamental existential notions of ‘self ’ and ‘identity’. However, despite the interior being a significant generative force, this has not happened to the exclusion of other disciplines. Ignoring territorial urges to claim areas and concepts as one’s own, the paper describes how the project has actively encouraged design disciplines to trespass in each other’s territories. Ecologies for and of the interior, while recognising the need for discipline emphasis, also demand an integrated and collective approach through what is in effect transdisciplinary practice.
Resumo:
The purpose of this article is to investigate the relationship between organizational and professional commitment of project workers. We first present (1) role-conflict theory and exchange theory to establish the multiple dimensions of commitment (affective, continuance, and normative) and (2) social identity theory to support our argument for different foci of commitment—organization and profession. Building on these theoretical lenses, we present the literature review that compares organizational and professional commitment of project workers with respect to the three dimensions of commitment. Adopting a positivist approach and a sample of 141 project workers, we use Pearson’s correlation to identify the relationship between affective organizational and affective professional, continuance organizational and continuance professional, and normative organizational and normative professional commitment. We report significant correlation between affective organizational commitment and affective professional commitment of project workers. The correlations between continuance organizational commitment and continuance professional commitment and normative organizational commitment and normative professional commitment are moderate. We then discuss the implications of these findings for the project management profession.
Resumo:
The current paper compares and investigates the discrepancies in motivational drives of project team members with respect to their project environment in collocated and distributed (virtual) project teams. The set of factors, which in this context are called ‘Sense of Ownership’, is used as a scale to measure these discrepancies using one tailed t tests. These factors are abstracted from theories of motivation, team performance, and team effectiveness and are related to ‘Nature of Work’, ‘Rewards’, and ‘Communication’. It has been observed that ‘virtual ness’ does not seem to impact the motivational drives of the project team members or the way the project environments provide or support those motivational drives in collocated and distributed projects. At a more specific level in terms of the motivational drives of the project team (‘WANT’) and the ability of the project environment to provide or support those factors (‘GET’), in collocated project teams, significant discrepancies were observed with respect to financial and non financial rewards, learning opportunities, nature of work and project specific communication, while in distributed teams, significant discrepancies with respect to project centric communication, followed by financial rewards and nature of work. Further, distributed project environments seem to better support the team member motivation than collocated project environments. The study concludes that both the collocated and distributed project environments may not be adequately supporting the motivational drives of its project team members, which may be frustrating to them. However, members working in virtual team environments may be less frustrated than their collocated counterparts as virtual project environments are better aligned with the motivational drives of their team members vis-à-vis the collocated project environments.
Resumo:
The current paper compares and investigates the discrepancies in motivational drives of project team members with respect to their project environment in collocated and distributed (virtual) project teams. The set of factors, which in this context are called ‘Sense of Ownership’, is used as a scale to measure these discrepancies using one tailed t tests. These factors are abstracted from theories of motivation, team performance, and team effectiveness and are related to ‘Nature of Work’, ‘Rewards’, and ‘Communication’. It has been observed that ‘virtualness’ does not seem to impact the motivational drives of the project team members or the way the project environments provide or support those motivational drives in collocated and distributed projects. At a more specific level in terms of the motivational drives of the project team (‘WANT’) and the ability of the project environment to provide or support those factors (‘GET’), in collocated project teams, significant discrepancies were observed with respect to financial and non financial rewards, learning opportunities, nature of work and project specific communication, while in distributed teams, significant discrepancies with respect to project centric communication, followed by financial rewards and nature of work. Further, distributed project environments seem to better support the team member motivation than collocated project environments. The study concludes that both the collocated and distributed project environments may not be adequately supporting the motivational drives of its project team members, which may be frustrating to them. However, members working in virtual team environments may be less frustrated than their collocated counterparts as virtual project environments are better aligned with the motivational drives of their team members vis-à-vis the collocated project environments.
Resumo:
The content and context of work significantly influences an employees’ satisfaction. While managers see work motivation as a tool to engage the employees so that they perform better, academicians value work motivation for its contribution to human behaviour. Though the relationship between employee motivation and project success has been extensively covered in the literature, more research focusing on the nature of job design on project success may have been wanting. We address this gap through this study. The present study contributes to the extant literature by suggesting an operational framework of work motivation for project—based organizations. We are also advancing the conceptual understanding of this variable by understanding how the different facets of work motivation have a differing impact of the various parameters of project performance. A survey instrument using standardized scales of work motivation and project success was used. 199 project workers from various industries completed the survey. We first ‘operationalized’ the definition of work motivation for the purpose of our study through a principal component analysis of work motivation items. We obtained a five factor structure that had items pertaining to employee development, work climate, goal clarity, and job security. We then performed a Pearson’s correlation analysis which revealed moderate to significant relationship between project outcomes ad work climate; project outcomes & employee development. In order to establish a causality between work motivation and project management success, we employed linear regression analysis. The results show that work climate is a significant predictor of client satisfaction, while it moderately influences the project quality. Further, bringing in objectivity to project work is important for a successful implementation.
Resumo:
The purpose of this paper is to investigate the relationship between organizational and professional commitment of project workers. We first present (i) role–conflict theory, and exchange theory to establish the multiple dimensions of commitment—affective, continuance, and normative; and (ii). social–identity theory to support our argument for different foci of commitment—organization and profession. Building on these theoretical lenses, we present the literature review that compares organizational and professional commitment of project workers with respect to the 3 dimensions of commitment. Adopting a positivist approach and a sample of 141 project workers, we use Pearson’s correlation to identify the relationship between affective organizational and affective professional, continuance organizational and continuance professional, and normative organizational and normative professional commitment. We report significant correlation between affective organizational commitment and affective professional commitment of project workers. The correlations between continuance organizational commitment, and continuance professional commitment; and normative organizational commitment, and normative professional commitment are moderate. We then discuss the implications of these findings for the project management profession.
Resumo:
The research field was community empowerment through education and skill-building. The context was the high rates of domestic violence in the Aboriginal and Torres Strait Islander community, and the dearth of culturally-appropriate resource materials to stimulate and encourage community engagement with the issue. The research question concerned the use of a specific media project – the creation of a 7-minute 48-second DVD on the causes and impacts of domestic violence – as a focus for community empowerment, education and skills development. The research represented an innovative partnership between the university research team, a non-government organisation, and various expert content-providers. The project generated new knowledge regarding best practice, in such areas as the culturally appropriate use of the voices of elders, focusing on the responsibilities of both men and women in relation to family and domestic violence, and the protection of Aboriginal and Islander children. The project has created an excellent tool for workshops on related issues including familiarity with the legal system. The film has been distributed to Aboriginal and Torres Strait Islander domestic violence services throughout the State, and has generated interstate interest, indicating a significant gap in available culturally-appropriate domestic violence resources. A support package for educational workers within Indigenous community groups wishing to use the resource has also been produced. In 2010, the DVD was nominated for a Queensland Domestic and Family Violence Prevention Award. Other non-government organisations have expressed interest in using the model created through this community-based project.