876 resultados para project planning and controlling
Resumo:
DUE TO COPYRIGHT RESTRICTIONS ONLY AVAILABLE FOR CONSULTATION AT ASTON UNIVERSITY LIBRARY AND INFORMATION SERVICES WITH PRIOR ARRANGEMENT
Resumo:
One of the most difficult issues of e-Learning is the students’ assessment. Being this an outstanding task regarding theoretical topics, it becomes even more challenging when the topics under evaluation are practical. ISCAP’s Information Systems Department is composed of about twenty teachers who have been for several years using an e-learning environment (at the moment Moodle 2.3) combined with traditional assessment. They are now planning and implementing a new e-learning assessment strategy. This effort was undertaken in order to evaluate a practical topic (the use of spreadsheets to solve management problems) common to shared courses of several undergraduate degree programs. The same team group is already experienced in the assessment of theoretical information systems topics using the b-learning platform. Therefore, this project works as an extension to previous experiences being the team aware of the additional difficulties due to the practical nature of the topics. This paper describes this project and presents two cycles of the action research methodology, used to conduct the research. The first cycle goal was to produce a database of questions. When it was implemented in order to be used with a pilot group of students, several problems were identified. Subsequently, the second cycle consisted in solving the identified problems preparing the database and all the players to a broader scope implementation. For each cycle, all the phases, its drawbacks and achievements are described. This paper suits all those who are or are planning to be in the process of shifting their assessment strategy from a traditional to one supported by an e-learning platform.
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
The authors propose a mathematical model to minimize the project total cost where there are multiple resources constrained by maximum availability. They assume the resources as renewable and the activities can use any subset of resources requiring any quantity from a limited real interval. The stochastic nature is inferred by means of a stochastic work content defined per resource within an activity and following a known distribution and the total cost is the sum of the resource allocation cost with the tardiness cost or earliness bonus in case the project finishes after or before the due date, respectively. The model was computationally implemented relying upon an interchange of two global optimization metaheuristics – the electromagnetism-like mechanism and the evolutionary strategies. Two experiments were conducted testing the implementation to projects with single and multiple resources, and with or without maximum availability constraints. The set of collected results shows good behavior in general and provide a tool to further assist project manager decision making in the planning phase.
Resumo:
"Metric Training For The Highway Industry", HR-376 was designed to produce training materials for the various divisions of the Iowa DOT, local government and the highway construction industry. The project materials were to be used to introduce the highway industry in Iowa to metric measurements in their daily activities. Five modules were developed and used in training over 1,000 DOT, county, city, consultant and contractor staff in the use of metric measurements. The training modules developed deal with the planning through operation areas of highway transportation. The materials and selection of modules were developed with the aid of an advisory personnel from the highway industry. Each module is design as a four hour block of instruction and a stand along module for specific types of personnel. Each module is subdivided into four chapters with chapter one and four covering general topics common to all subjects. Chapters two and three are aimed at hands on experience for a specific group and subject. This module includes: Module 4 - Transportation Planning and Traffic Monitoring. Hands on examples of applications of metric measurements in the development of planning reports and traffic data collection are included in this module.
Resumo:
Almost thirty years ago, as the social sciences underwent their 'discursive turn', Bernardo Secchi (1984) drew, in what he called the 'urban planning narrative', the attention of planners to the production of myths, turning an activity often seen as primarily technical into one centred around the production of images and ideas. This conception of planning practice gave rise to a powerful current of research in English-speaking countries. Efforts were made to both combine the urban planning narrative with storytelling and to establish storytelling as a prescriptive or descriptive model for planning practice. Thus, just as storytelling is supposed to have led democratic communication off track through a pronounced concern for a good story, storytelling applied to the field of urban production may have led to an increasing preoccupation with staging and showmanship for projects to the detriment of their real inclusion in political debate. It is this possible transformation of the territorial action that will be the focus of the articles collected in this special issue of Articulo - Journal of urban research.
Resumo:
Tutkielman tavoitteena on selvittää kuinka suunnitella ja hallita tehokasta verkkoviestintää, joka vastaa kohdeyleisön ja palvelun ylläpitäjien kasvaviin vaatimuksiin. Tutkielma on normatiivinen tapaustutkimus, jonka tuloksena syntyy konstruktiivinen askelmalli kokonaisvaltaisen verkkoviestintäprojektin toteuttamiseen. Tutkimus esittää myös teoreettisesti merkittävän näkökulman verkkopalvelujen sisällön hallintaongelmien ratkaisemiseen. Tosielämän verkkoviestintäprojektin toteutusta seurataan TietoEnator Forestissa, jossa tutkielman kirjoittaja työskentelee. Tutkimusmateriaalina käytetään 11 TietoEnator Forestissa toteutettua haastattelua, TietoEnator konsernin dokumentaatiota ja osallistuvaa havainnointia. Haastattelulomake sisältää 13 avointa kysymystä, jotka käsittelevät verkkoviestintästrategian perusasioita. Tunnistetut verkkoviestinnän avainmenestystekijät ovat vahva sisäinen sitoutuminen hajautettuihin ylläpitorooleihin ja perinpohjainen asiakastarpeiden tunnistaminen. Teknisesti on tärkeää, että eritason verkkoympäristöt, Internet, Intranet ja Extranet, hallitaan samoilla sisällönhallinta työkaluilla. Näin pystytään rationalisoimaan ylläpitotoiminnot.
Resumo:
During recent years, mobile phone markets have changed significantly. Asian markets have become vital for the manufacturers with their millions of end users and multiple major mobile network operators. This has resulted in software development as global companies have research and development sites running in multiple locations, including Asia. The reasons behind this are not only in reducing labor costs but also in capitalizing on the local knowledge and knowhow. A ramp-up site has multiple effects in the software development and software release activities. This thesis focuses on representing the importance of software testing as part of software development process and highlighting issues that need to be considered during ramp-up activities. In addition this work tries to emphasize the importance of communication between parties and information gathering prior to setting up the ramp-up site. The output of this thesis was successful software testing site ramp-up within the set time limits. The quality of software testing work was assured and the ramp-up -project requirements were achieved.
Resumo:
The objective of this project was to introduce a new software product to pulp industry, a new market for case company. An optimization based scheduling tool has been developed to allow pulp operations to better control their production processes and improve both production efficiency and stability. Both the work here and earlier research indicates that there is a potential for savings around 1-5%. All the supporting data is available today coming from distributed control systems, data historians and other existing sources. The pulp mill model together with the scheduler, allows what-if analyses of the impacts and timely feasibility of various external actions such as planned maintenance of any particular mill operation. The visibility gained from the model proves also to be a real benefit. The aim is to satisfy demand and gain extra profit, while achieving the required customer service level. Research effort has been put both in understanding the minimum features needed to satisfy the scheduling requirements in the industry and the overall existence of the market. A qualitative study was constructed to both identify competitive situation and the requirements vs. gaps on the market. It becomes clear that there is no such system on the marketplace today and also that there is room to improve target market overall process efficiency through such planning tool. This thesis also provides better overall understanding of the different processes in this particular industry for the case company.
Resumo:
The focus of the research is on the derivation of the valid and reliable performance results regarding establishment and launching of the new full-scale industrial facility, considering the overall current conditions for the project realization in and out of Russia. The study demonstrates the process of the new facility concept development, with following perfor-mance calculation, comparative analyzes conduction, life-cycle simulations, performance indicators derivation and project`s sustainability evaluation. To unite and process the entire input parameters complexity, regards the interlacing between the project`s internal technical and commercial sides on the one hand, and consider all the specifics of the Russian conditions for doing business on the other hand, was developed the unique model for the project`s performance calculation, simulations and results representation. The complete research incorporates all corresponding data to substantiate the assigned facility`s design, sizing and output capacity for high quality and cost efficient ferrous pipe-line accessories manufacturing, as well as, demonstrates that this project could be suc-cessfully realized in current conditions in Russia and highlights the room for significant performance and sustainability improvements based on the indexes of the derived KPIs.
Resumo:
This qualitative study investigated how a team of 7 hospital educators collaborated to develop e-curriculum units to pilot for a newly acquired learning -r management system at a large, multisite academic health sciences centre. A case study approach was used to examine how the e-Curriculum Team was structured, how the educators worked together to develop strategies to better utilize e-leaming in their ovwi practice, what e-curriculum they chose to develop, and how they determined their priorities for e-curriculum development. It also inquired into how they planned to involve other educators in using e-leaming. One set of semistructured interviews with the 6 hospital educators involved in the project, as well as minutes of team meetings and the researcher's journal, were analyzed (the researcher was also a hospital educator on the team). Project management structure, educator support, and organizational pressures on the implementation project feature prominently in the case study. This study suggests that implementation of e-leaming will be more successful if (a) educators involved in the development of e-leaming curriculum are supported in their role as change agents, (b) the pain of vmleaming current educational practice is considered, (c) the limitations of the software being implemented are recognized, (d) time is spent leaming about best practice, and (e) the project is protected as much as possible from organizational pressures and distractions.
Resumo:
Much of the published human factors work on risk is to do with safety and within this is concerned with prediction and analysis of human error and with human reliability assessment. Less has been published on human factors contributions to understanding and managing project, business, engineering and other forms of risk and still less jointly assessing risk to do with broad issues of ‘safety’ and broad issues of ‘production’ or ‘performance’. This paper contains a general commentary on human factors and assessment of risk of various kinds, in the context of the aims of ergonomics and concerns about being too risk averse. The paper then describes a specific project, in rail engineering, where the notion of a human factors case has been employed to analyse engineering functions and related human factors issues. A human factors issues register for potential system disturbances has been developed, prior to a human factors risk assessment, which jointly covers safety and production (engineering delivery) concerns. The paper concludes with a commentary on the potential relevance of a resilience engineering perspective to understanding rail engineering systems risk. Design, planning and management of complex systems will increasingly have to address the issue of making trade-offs between safety and production, and ergonomics should be central to this. The paper addresses the relevant issues and does so in an under-published domain – rail systems engineering work.