999 resultados para optimal contracting


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports the initial steps of research on planning of rural networks for MV and LV. In this paper, two different cases are studied. In the first case, 100 loads are distributed uniformly on a 100 km transmission line in a distribution network and in the second case, the load structure become closer to the rural situation. In case 2, 21 loads are located in a distribution system so that their distance is increasing, distance between load 1 and 2 is 3 km, between 2 and 3 is 6 km, etc). These two models to some extent represent the distribution system in urban and rural areas, respectively. The objective function for the design of the optimal system consists of three main parts: cost of transformers, and MV and LV conductors. The bus voltage is expressed as a constraint and should be maintained within a standard level, rising or falling by no more than 5%.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Partnering has been defined in many ways. It can be considered as an individual project mechanism or can be considered as a long term strategy. Alliancing is normally assumed to be a long term business strategy linking together client, contractor and supply chain. Relational contracting goes further than this and brings in the whole philosophy of the value chain and the linking of the interdependent parts within the construction project as a key business objective. This document aims to review existing definitions of these three concepts and present and overview of the current state of-the-art in terms of their use and implementation. The document should be useful for all of those project team members looking to sharpen their understanding of the various concepts and will also provide a platform for debating the current state of the definitions and implementations being used in Main Roads and Public Works Departments.