993 resultados para mineral processing


Relevância:

70.00% 70.00%

Publicador:

Resumo:

Computational analysis software is now widely accepted as a key industrial tool for plant design and process analysis. This is due in part to increased accuracy in the models, larger and faster computer systems and better graphical interfaces that allow easy use of the technology by engineers. The use of computational modelling to test new ideas and analyse current processes helps to take the guesswork out of industrial process design and offers attractive cost savings. An overview of computer-based modelling techniques as applied to the materials processing industry is presented and examples of their application are provided in the contexts of the mixing and refining of lead bullion and the manufacture of lead ingots.

Relevância:

70.00% 70.00%

Publicador:

Resumo:

El proyecto tiene como objeto definir la viabilidad de explotación de un importante yacimiento de Estaño y Tántalo que se encuentra en una formación geológica de base pegmatítica situada en el norte de España. En base a las reservas calculadas, se define la capacidad de tratamiento de la planta de procesamiento del mineral para un periodo de explotación de 10 años. Como primer paso se estudian los ensayos de caracterización y concentración realizados en laboratorio a partir de muestras de mano representativas del mineral así como otros en planta piloto llevados a cabo anteriormente. Una vez definida la recuperación del Estaño y Tántalo se procede al diseño conceptual del proceso. Posteriormente se desarrolla un diseño e ingeniería preliminar más aproximados, a partir de los cuales se evalúan los costes de equipos y operacionales que, en base a los retornos por la venta de los concentrados, permitirán calcular la rentabilidad del proyecto y riesgos de la inversión. ABSTRACT The purpose of this project is to define the feasibility of mining a major deposit of tin and tantalum found in a pegmatite formation in northern Spain. Based on the estimated reserves, the operating capacity for mining and mineral processing plant was defined for a period of 10 years. As a first step for the development, a research program for characterization and concentration of the ore, were performed in the laboratory based on representative samples from the deposit. In addition, previous pilot plant results were also taken into account. Once determined the recovery of tin and tantalum, the conceptual design process was defined. As a second step, it was developed a preliminary design and engineering, from which the capital and operating costs were estimated .By means of the calculated returns from the sale of concentrates, the profitability of the project and investment risks were finally assessed

Relevância:

70.00% 70.00%

Publicador:

Relevância:

70.00% 70.00%

Publicador:

Relevância:

70.00% 70.00%

Publicador: