945 resultados para construction projects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The problem of delays in the construction industry is a global phenomenon and the construction industry in Brunei Darussalam is no exception. The goal of all parties involved in construction projects – owners, contractors, engineers and consultants in either the public or private sector is to successfully complete the project on schedule, within planned budget, with the highest quality and in the safest manner. Construction projects are frequently influenced by either success factors that help project parties reach their goal as planned, or delay factors that stifle or postpone project completion. The purpose of this research is to identify success and delay factors which can help project parties reach their intended goals with greater efficiency. This research extracted seven of the most important success factors according to the literature and seven of the most important delay factors identified by project parties, and then examined correlations between them to determine which were the most influential in preventing project delays. This research uses a comprehensive literature review to design and conduct a survey to investigate success and delay factors and then obtain a consensus of expert opinion using the Delphi methodology to rank the most needed critical success factors for Brunei construction projects. A specific survey was distributed to owners, contractors and engineers to examine the most critical delay factors. A general survey was distributed to examine the correlation between the identified delay factors and the seven most important critical success factors selected. A consensus of expert opinion using the Delphi methodology was used to rank the most needed critical success factors for Brunei building construction. Data was collected and evaluated by statistical methods to identify the most significant causes of delay and to measure the strength and direction of the relationship between critical success factors and delay factors in order to examine project parties’ evaluation of projects’ critical success and delay factors, and to evaluate the influence of critical success factors on critical delay factors. A relative importance index has been used to determine the relative importance of the various causes of delays. A one and two-way analysis of variance (ANOVA) has been used to examine how the group or groups evaluated the influence of the critical success factors in avoiding or preventing each of the delay factors, and which success factors were perceived as most influential in avoiding or preventing critical delay factors. Finally the Delphi method, using consensus from an expert panel, was employed to identify the seven most critical success factors used to avoid the delay factors, and thereby improve project performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Effective use of information and communication technologies (ICT) is necessary for delivering efficiency and improved project delivery in the construction industry. Convincing clients or contracting organisations to embrace ICT is a difficult task, there are few templates of an ICT business model for the industry to use. ICT application in the construction industry is relatively low compared to automotive and aerospace industries. The National Museum of Australia project provides a unique opportunity for investigating and reporting on this deficiency in publicly available knowledge. Concentrates on the business model content and objectives, briefly indicates the evaluation framework that was used to evaluate ICT effectiveness.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Community-based activism against proposed construction projects is growing. Many protests are poorly managed and escalate into long-term and sometimes acrimonious disputes which damage communities, firms and the construction industry as a whole. Using a thematic storytelling approach which draws on ethnographic method, within a single case study framework, new insights into the social forces that shape and sustain community-based protest against construction projects are provided. A conceptual model of protest movement continuity is presented which highlights the factors that sustain protest continuity over time. The model illustrates how social contagion leads to common community perceptions of development risk and opportunity, to a positive internalization of collective values and identity, to a strategic utilization of social capital and an awareness of the need to manage the emotional dynamics of protest through mechanisms such as symbolic artefacts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Motivation is a major driver of project performance. Despite team member ability to deliver successful project outcomes if they are not positively motivated to pursue joint project goals, then performance will be constrained. One approach to improving the motivation of project organizations is by offering a financial reward for the achievement of set performance standards above a minimum required level. However, little investigation has been undertaken into the features of successful incentive systems as a part of an overall delivery strategy. With input from organizational management literature, and drawing on the literature covering psychological and economic theories of motivation, this paper presents an integrated framework that can be used by project organizations to assess the impact of financial reward systems on motivation in construction projects. The integrated framework offers four motivation indicators which reflect key theoretical concepts across both psychological and economic disciplines. The indicators are: (1) Goal Commitment, (2) Distributive Justice, (3) Procedural Justice, and (4) Reciprocity. The paper also interprets the integrated framework against the results of a successful Australian social infrastructure project case study and identifies key learning’s for project organizations to consider when designing financial reward systems. Case study results suggest that motivation directed towards the achievement of incentive goals is influenced not only by the value placed on the financial reward for commercial benefit, but also driven by the strength of the project initiatives that encourage just and fair dealings, supporting the establishment of trust and positive reciprocal behavior across a project team. The strength of the project relationships was found to be influenced by how attractive the achievement of the goal is to the incentive recipient and how likely they were to push for the achievement of the goal. Interestingly, findings also suggested that contractor motivation is also influenced by the fairness of the performance measurement process and their perception of the trustworthiness and transparency of their client. These findings provide the basis for future research on the impact of financial reward systems on motivation in construction projects. It is anticipated that such research will shed new light on this complex topic and further define how reward systems should be designed to promote project team motivation. Due to the unique nature of construction projects with high levels of task complexity and interdependence, results are expected to vary in comparison to previous studies based on individuals or single-entity organizations.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

[Quality Management in Construction Projects by Abdul Razzak Rumane, CRC Press, Boca Raton, FL, 2011, 434 pp, ISBN 9781439838716] Issues of quality management, quality control and performance against specification have long been the focus of various business sectors. Recently there has been an additional drive to achieve the continuous improvement and customer satisfaction promised by the 20th-century ‘gurus’ some six or seven decades ago. The engineering and construction industries have generally taken somewhat longer than their counterparts in the manufacturing, service and production sectors to achieve these espoused levels of quality. The construction and engineering sectors stand to realize major rewards from better managing quality in projects. More effort is being put into instructing future participants in the industry as well as assisting existing professionals. This book comes at an opportune time.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Many governments world-wide are increasingly encouraging the involvement of interested individuals, groups and organisations in their publicinfrastructure and construction (PIC) projects as a means of improving the openness, transparency and accountability of the decision-making process and help improve the projects’ long-term viability and benefits to the community. In China, however, the current participatory mechanism at the project level exists only as part of the environmental impact assessment (EIA) process. With an increasing demand for PIC projects and social equality in China, this suggests a need to bring the participatory process into line with international practice. The aim of this paper, therefore, is to identify the weaknesses of EIA-basedpublicparticipation in China and the means by which it may be improved for the whole lifecycle of PIC schemes. To do this, the results of a series of interviews with a diverse group of experts is reported which analyse the nature and extent of existing problems of publicparticipation in EIA and suggestions for improvement. These indicate that the current level of participation in PIC projects is quite limited, particularly in the crucial earlier stages, primarily due to traditional culture and values, uneven progress in the adoption of participatory mechanisms, the risk of not meeting targets and lack of confidence in public competence. Finally, aprocess flowchart is proposed to guide construction practitioners and the community in general.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is a worldwide demand for an increasingly sustainable built environment. This has resulted in the need for a more accurate evaluation of the level of sustainability of construction projects. To do this it involves the development of better measurement and benchmarking methods. One approach is to use a theoretical model to assess construction projects in terms of their sustainable development value (SDV) and sustainable development ability (SDA) for implementation in the project life cycle, where SDA measures the contribution of a project to development sustainability and as a major criterion for assessing its feasibility. This paper develops an improved SDA prototype model that incorporates the effects of dynamical factors on project sustainability. This involves the introduction of two major factors concerning technological advancement and changes in people's perceptions. A case study is used to demonstrate the procedures involved in simulation and modeling, one outcome of which is to demonstrate the greater influence of technological advancement on project sustainability than changes in perception.