996 resultados para building specifications


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objectives The objectives of this project were two-fold: • Assess the ease with which current architectural CAD systems supported the use ofparametric descriptions in defining building shape, engineering system performance and cost at the early stages of building design; • Assess the feasibility of implementing a software decision support system that allowed designers to trade-off the characteristics and configuration of various engineering systems to move towards a “global optimum” rather than considering each system in isolation and expecting humans to weigh up all of the costs and benefits. The first stage of the project consisted of using four different CAD systems to define building shells (envelopes) with different usages. These models were then exported into a shared database using the IFC information exchange specifications. The second stage involved the implementation of small computer programs that were able to estimate relevant system parameters based on performance requirements and the constraints imposed by the other systems. These are presented in a unified user interface that extracts the appropriate building shape parameters from the shared database Note that the term parametric in this context refers to the relationships among and between all elements of the building model - not just geometric associations - which will enable the desired coordination.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper discusses the preliminary findings of an ongoing research project aimed at developing a technological, operational and strategic analysis of adopting BIM in AEC/FM (Architecture-Engineering-Construction/Facility Management) industry as a collaboration tool. Outcomes of the project will provide specifications and guidelines as well as establish industry standards for implementing BIM in practice. This research primarily focuses on BIM model servers as a collaboration platform, and hence the guidelines are aimed at enhancing collaboration capabilities. This paper reports on the findings from: (1) a critical review of latest BIM literature and commercial applications, and (2) workshops with focus groups on changing work-practice, role of technology, current perception and expectations of BIM. Layout for case studies being undertaken is presented. These findings provide a base to develop comprehensive software specifications and national guidelines for BIM with particular emphasis on BIM model servers as collaboration platforms.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building Information Modelling (BIM) is an IT enabled technology that allows storage, management, sharing, access, update and use of all the data relevant to a project through out the project life-cycle in the form of a data repository. BIM enables improved inter-disciplinary collaboration across distributed teams, intelligent documentation and information retrieval, greater consistency in building data, better conflict detection and enhanced facilities management. While the technology itself may not be new, and similar approaches have been in use in some other sectors like Aircraft and Automobile industry for well over a decade now, the AEC/FM (Architecture, Engineering and Construction/ Facilities Management) industry is still to catch up with them in its ability to exploit the benefits of the IT revolution. Though the potential benefits of the technology in terms of knowledge sharing, project management, project co-ordination and collaboration are near to obvious, the adoption rate has been rather lethargic, inspite of some well directed efforts and availability of supporting commercial tools. Since the technology itself has been well tested over the years in some other domains the plausible causes must be rooted well beyond the explanation of the ‘Bell Curve of innovation adoption’. This paper discusses the preliminary findings of an ongoing research project funded by the Cooperative Research Centre for Construction Innovation (CRC-CI) which aims to identify these gaps and come up with specifications and guidelines to enable greater adoption of the BIM approach in practice. A detailed literature review is conducted that looks at some of the similar research reported in the recent years. A desktop audit of some of the existing commercial tools that support BIM application has been conducted to identify the technological issues and concerns, and a workshop was organized with industry partners and various players in the AEC industry for needs analysis, expectations and feedback on the possible deterrents and inhibitions surrounding the BIM adoption.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper conceptualizes a framework for bridging the BIM-Specifications divide by embedding project-specific information in BIM objects by means of a product library. We demonstrate how model information, enriched with data at various levels of development (LODs), can evolve simultaneously with design and construction using a window object embedded in a wall as life-cycle phase exemplars at different levels of granularity. The conceptual approach is informed by the need for exploring an approach that takes cognizance of the limitations of current modelling tools in enhancing the information content of BIM models. Therefore, this work attempts to answer the question, “How can the modelling of building information be enhanced throughout the life-cycle phases of buildings utilizing building specification information?”

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Annually, several million tonnes of waste are produced from reworks, demolition, and use of substandard materials. Building Information Modelling (BIM), a digital representation of facilities and their constituent data, is a viable means of addressing some concerns about the impacts of these processes. BIM functionalities can be extended and combined with rich building information from specifications and product libraries, for efficient, streamlined design and construction. This paper conceptualises a framework for BIM-knowledge transfer from advanced economies for adaptation and use in urban development works in developing nations using the Sydney Down Under and Lagos Eko Atlantic projects as reference points. We present a scenario that highlights BIM-based lifecycle planning/specifications as agents of sustainable construction (in terms of cost and time) crucial to the quality of as-built data from early on in city development. We show how, through the use of BIM, city planners in developing nations can avoid high, retrospective (and sometimes wasteful) maintenance costs and leapfrog infrastructure management standards of advanced economies. Finally, this paper illustrates how BIM can address concerns about economic sustainability during city development in developing countries by enriching model objects with specification information sourced from a product library.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The overarching research work is based on two approaches: - Conceptual Analysis, Extraction and Linking - Experimentation with Product Libraries - Conceptual Analysis, Extraction and Linking: This aspect of the research has been achieved through the development of a conceptual framework for facilitating the understanding of the constituting components of BIM, Specifications and Cost Planning under investigation. The framework builds on theories spanning the constituent research themes and was used as a basis for justifying the elected approaches adopted throughout the research work. By means of tags and codes, a system for classifying building specification information has been developed as a differentiator between the chosen research approach and existing classification strategies in industry. Furthermore, syntactic links between extracted classes of specification information and cost planning have been established and will be adopted as a basis for authenticating the impact of specification information within BIM models. - Experimentation with Product Libraries Following the extraction and classification of BIM, Specifications and Cost Planning information, early experimentation on linking specifications to BIM models by means of a raas-based product library have been successful. A comparative analysis between a range of existing product libraries has also been realised. The outcomes have been amply documented in papers, all of which have received positive reviews. Ongoing experiments and analysis with the product library involve integrating the cost planning component for authenticating the completeness, relevance and impact of embedded specification within BIM models.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

How can obstacles to innovation be overcome in road construction? Using a focus group methodology, and based on two prior rounds of empirical work, the analysis in this chapter generates a set of four key solutions to two main construction innovation obstacles: (1) restrictive tender assessment and (2) disagreement over who carries the risk of new product failure. The four key solutions uncovered were: 1) pre-project product certification; 2) past innovation performance assessment; 3) earlier involvement of product suppliers and road asset operators; and 4) performance-based specifications. Additional research is suggested in order to illicit deeper insights into possible solutions to construction innovation obstacles, and should emphasise furthering the theoretical interpretation of empirical phenomena.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper presents an approach, based on Lean production philosophy, for rationalising the processes involved in the production of specification documents for construction projects. Current construction literature erroneously depicts the process for the creation of construction specifications as a linear one. This traditional understanding of the specification process often culminates in process-wastes. On the contrary, the evidence suggests that though generalised, the activities involved in producing specification documents are nonlinear. Drawing on the outcome of participant observation, this paper presents an optimised approach for representing construction specifications. Consequently, the actors typically involved in producing specification documents are identified, the processes suitable for automation are highlighted and the central role of tacit knowledge is integrated into a conceptual template of construction specifications. By applying the transformation, flow, value (TFV) theory of Lean production the paper argues that value creation can be realised by eliminating the wastes associated with the traditional preparation of specification documents with a view to integrating specifications in digital models such as Building Information Models (BIM). Therefore, the paper presents an approach for rationalising the TFV theory as a method for optimising current approaches for generating construction specifications based on a revised specification writing model.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper conceptualizes a framework for bridging the BIM (building information modelling)-specifications divide through augmenting objects within BIM with specification parameters derived from a product library. We demonstrate how model information, enriched with data at various LODs (levels of development), can evolve simultaneously with design and construction using different representation of a window object embedded in a wall as lifecycle phase exemplars at different levels of granularity. The conceptual standpoint is informed by the need for exploring a methodological approach which extends beyond current limitations of current modelling platforms in enhancing the information content of BIM models. Therefore, this work demonstrates that BIM objects can be augmented with construction specification parameters leveraging product libraries.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This publication lists the more important wood properties of commercial timbers used for construction in Queensland. It also provides requirements and conditions of use for these timbers to provide appropriate design service life in various construction applications. The correct specification of timber considers a range of timber properties including, but not limited to, stress grade; durability class; moisture content and insect resistance. For the specification of timber sizes and spans, relevant Australian Standards and design manuals should be consulted—e.g. Australian Standard AS 1684 series Residential timber—framed construction parts 2 and 3 (Standards Australia 2006a;b.) Book 1 explains the terms used; with reference to nomenclature; origin and timber properties presented under specific column headings in the schedules (Book 2). It also explains target design life; applications and decay hazard zones; presented in the Book 2 Schedules. Book 2 consists of reference tables; presented as schedules A; B and C: • Schedule A contains commercial mixtures of unidentified timbers and of some Australian and imported softwoods. Index numbers 1–10 • Schedule B contains Australian-grown timber species; including both natural forests and plantations. Index numbers 11–493 • Schedule C contains timbers imported into Australia from overseas. Index numbers 494–606 Each schedule has two parts presenting data in tables. • Part 1: Nomenclature, origin and properties of imported timber species • Part 2: Approved uses for commercial mixtures of imported timber species The recommendations made in this publication assume that good building practice will be carried out.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A framework based on the notion of "conflict-tolerance" was proposed in as a compositional methodology for developing and reasoning about systems that comprise multiple independent controllers. A central notion in this framework is that of a "conflict-tolerant" specification for a controller. In this work we propose a way of defining conflict-tolerant real-time specifications in Metric Interval Temporal Logic (MITL). We call our logic CT-MITL for Conflict-Tolerant MITL. We then give a clock optimal "delay-then-extend" construction for building a timed transition system for monitoring past-MITL formulas. We show how this monitoring transition system can be used to solve the associated verification and synthesis problems for CT-MITL.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Political drivers such as the Kyoto protocol, the EU Energy Performance of Buildings Directive and the Energy end use and Services Directive have been implemented in response to an identified need for a reduction in human related CO2 emissions. Buildings account for a significant portion of global CO2 emissions, approximately 25-30%, and it is widely acknowledged by industry and research organisations that they operate inefficiently. In parallel, unsatisfactory indoor environmental conditions have proven to negatively impact occupant productivity. Legislative drivers and client education are seen as the key motivating factors for an improvement in the holistic environmental and energy performance of a building. A symbiotic relationship exists between building indoor environmental conditions and building energy consumption. However traditional Building Management Systems and Energy Management Systems treat these separately. Conventional performance analysis compares building energy consumption with a previously recorded value or with the consumption of a similar building and does not recognise the fact that all buildings are unique. Therefore what is required is a new framework which incorporates performance comparison against a theoretical building specific ideal benchmark. Traditionally Energy Managers, who work at the operational level of organisations with respect to building performance, do not have access to ideal performance benchmark information and as a result cannot optimally operate buildings. This thesis systematically defines Holistic Environmental and Energy Management and specifies the Scenario Modelling Technique which in turn uses an ideal performance benchmark. The holistic technique uses quantified expressions of building performance and by doing so enables the profiled Energy Manager to visualise his actions and the downstream consequences of his actions in the context of overall building operation. The Ideal Building Framework facilitates the use of this technique by acting as a Building Life Cycle (BLC) data repository through which ideal building performance benchmarks are systematically structured and stored in parallel with actual performance data. The Ideal Building Framework utilises transformed data in the form of the Ideal Set of Performance Objectives and Metrics which are capable of defining the performance of any building at any stage of the BLC. It is proposed that the union of Scenario Models for an individual building would result in a building specific Combination of Performance Metrics which would in turn be stored in the BLC data repository. The Ideal Data Set underpins the Ideal Set of Performance Objectives and Metrics and is the set of measurements required to monitor the performance of the Ideal Building. A Model View describes the unique building specific data relevant to a particular project stakeholder. The energy management data and information exchange requirements that underlie a Model View implementation are detailed and incorporate traditional and proposed energy management. This thesis also specifies the Model View Methodology which complements the Ideal Building Framework. The developed Model View and Rule Set methodology process utilises stakeholder specific rule sets to define stakeholder pertinent environmental and energy performance data. This generic process further enables each stakeholder to define the resolution of data desired. For example, basic, intermediate or detailed. The Model View methodology is applicable for all project stakeholders, each requiring its own customised rule set. Two rule sets are defined in detail, the Energy Manager rule set and the LEED Accreditor rule set. This particular measurement generation process accompanied by defined View would filter and expedite data access for all stakeholders involved in building performance. Information presentation is critical for effective use of the data provided by the Ideal Building Framework and the Energy Management View definition. The specifications for a customised Information Delivery Tool account for the established profile of Energy Managers and best practice user interface design. Components of the developed tool could also be used by Facility Managers working at the tactical and strategic levels of organisations. Informed decision making is made possible through specified decision assistance processes which incorporate the Scenario Modelling and Benchmarking techniques, the Ideal Building Framework, the Energy Manager Model View, the Information Delivery Tool and the established profile of Energy Managers. The Model View and Rule Set Methodology is effectively demonstrated on an appropriate mixed use existing ‘green’ building, the Environmental Research Institute at University College Cork, using the Energy Management and LEED rule sets. Informed Decision Making is also demonstrated using a prototype scenario for the demonstration building.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Many code generation tools exist to aid developers in carrying out common mappings, such as from Object to XML or from Object to relational database. Such generated code tends to possess a high binding between the Object code and the target mapping, making integration into a broader application tedious or even impossible. In this paper we suggest XML technologies and the multiple inheritance capabilities of interface based languages such as Java, offer a means to unify such executable specifications, thus building complete, consistent and useful object models declaratively, without sacrificing component flexibility.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Includes index.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

"Contained herein are general conditions, forms of proposal, agreements and bonds, State Architect's standard specifications for mechanical, electric and elevator works."