833 resultados para Usability Guidelines


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Poor air quality has a huge detrimental effect, both economic and on the quality of life, in Australia. Transit oriented design (TOD), which aims to minimise urban sprawl and lower dependency on vehicles, leads to an increasing number of buildings close to transport corridors. This project aims at providing guidelines that are appropriate to include within City Plan to inform future planning along road corridors, and provide recommendations on when mitigation measures should be utilised.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The topic of designers’ knowledge and how they conduct design process has been widely investigated in design research. Understanding theoretical and experiential knowledge in design has involved recognition of the importance of designers’ experience of experiencing, seeing, and absorbing ideas from the world as points of reference (or precedents) that are consulted whenever a design problem arises (Lawson, 2004). Hence, various types of design knowledge have been categorized (Lawson, 2004), and the nature of design knowledge continues to be studied (Cross, 2006); nevertheless, the study of the experiential aspects embedded in design knowledge is a topic not fully addressed. In particular there has been little emphasis on the investigation of the ways in which designers’ individual experience influences different types of design tasks. This research focuses on the investigation of the ways in which designers inform a usability design process. It aims to understand how designers design product usability, what informs their process, and the role their individual experience (and episodic knowledge) plays within the design process. This paper introduces initial outcomes from an empirical study involving observation of a design task that emphasized usability issues. It discusses the experiential knowledge observed in the visual representations (sketches) produced by designers as part of the design tasks. Through the use of visuals as means to represent experiential knowledge, this paper presents initial research outcomes to demonstrate how designers’ individual experience is integrated into design tasks and communicated within the design process. Initial outcomes demonstrate the influence of designers’ experience in the design of product usability. It is expected that outcomes will help identify the causal relationships between experience, context of use, and product usability, which will contribute to enhance our understanding about the design of user-product interactions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Cooperative Research Centre (CRC) for Construction Innovation research project 2001-008-C: ‘Project Team Integration: Communication, Coordination and Decision Support’, is supported by a number of Australian industry, government and university based project partners including: Queensland University of Technology (QUT); Commonwealth Scientific Industrial Research Organisation (CSIRO), University of Newcastle; Queensland Department of Public Works (QDPW); and the Queensland Department of Main Roads (QDMR). Supporting the various research aims and objectives of the 2001-008-C (Part B) QUT / Industry Partner agreements, and as a major deliverable for the project, this report is not intended as a comprehensive statement of Architectural, Engineering and Contractor (AEC) industry best practice recommendations. Rather it should read as a set of research and industry recommended guidelines, based on extensive literature reviews and two years worth of investigative activities examining both public and private industry uptake of innovative information and communication technology (ICT) solutions, whilst highlighting the overall need for culture change.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report is for one of the four Tasks of the CRC project ‘Regenerating Construction to Enhance Sustainability’. The report specifically addresses Task 2 ‘Design guidelines for delivering high quality indoor environments’.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper compares and reviews the recommendations and contents of the guide for the design and construction of externally bonded FRP systems for strengthening concrete structures reported by ACI committee 440 and technical report of Externally bonded FRP reinforcement for RC structures (FIB 14) in application of carbon fiber reinforced polymer (CFRP) composites in strengthening of an aging reinforced concrete headstock. The paper also discusses the background, limitations, strengthening for flexure and shear, and other related issues in use of FRP for strengthening of a typical reinforced concrete headstock structure such as durability, de-bonding, strengthening limits, fire and environmental conditions. A case study of strengthening of a bridge headstock using FRP composites is presented as a worked example in order to illustrate and compare the differences between these two design guidelines when used in conjunction with the philosophy of the Austroads (1992) bridge design code.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper presents a comparative study of primarily Australian (and limited international) practices and guidelines on Buildings Asset Management (BAM). The objective of this study was to identify potential gaps in current practices and potential areas of research for further improvement. The paper starts with an overview of BAM. Later sections cover current BAM practices and guidelines across different states of Australia; give a limited overview of international practices and concludes with the authors’ observations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This publication, summarising outcomes of an investigation into eTendering as a part of a CRC Construction Innovation research project, presents guidelines and recommendations to be considered when implementing eTendering systems, procedures and policies.

Relevância:

20.00% 20.00%

Publicador:

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Professional prac− tice guidelines for endoscope reprocessing re− commend reprocessing endoscopes between each case and proper storage following repro− cessing after the last case of the list. There is lim− ited empirical evidence to support the efficacy of endoscope reprocessing prior to use in the first case of the day; however, internationally, many guidelines continue to recommend this practice. The aim of this study is to estimate a safe shelf life for flexible endoscopes in a high−turnover gastroenterology unit. Materials and methods: In a prospective obser− vational study, all flexible endoscopes in active service during the 3−week study period were mi− crobiologically sampled prior to reprocessing be− fore the first case of the day (n = 200). The main outcome variables were culture status, organism cultured, and shelf life. Results: Among the total number of useable samples (n = 194), the overall contamination rate was 15.5 %, with a pathogenic contamination rate of 0.5 %. Mean time between last case one day and reprocessing before the first case on the next day (that is, shelf life) was 37.62 h (SD 36.47). Median shelf life was 18.8 h (range 5.27± 165.35 h). The most frequently identified organ− ism was coagulase−negative Staphylococcus, an environmental nonpathogenic organism. Conclusions: When processed according to es− tablished guidelines, flexible endoscopes remain free from pathogenic organisms between last case and next day first case use. Significant re− ductions in the expenditure of time and resources on reprocessing endoscopes have the potential to reduce the restraints experienced by high−turnover endoscopy units and improve ser− vice delivery.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The two longitudinal case studies that make up this dissertation sought to explain and predict the relationship between usability and clinician acceptance of a health information system. The overall aim of the research study was to determine what role usability plays in the acceptance or rejection of systems used by clinicians in a healthcare context. The focus was on the end users (the clinicians) rather than the views of the system designers and managers responsible for implementation and the clients of the clinicians. A mixed methods approach was adopted that drew on both qualitative and quantitative research methods. This study followed the implementation of a community health information system from early beginnings to its established practice. Users were drawn from different health service departments with distinctly different organisational cultures and attitudes to information and communication technology used in this context. This study provided evidence that a usability analysis in this context would not necessarily be valid when the users have prior reservations on acceptance. Investigation was made on the initial training and post-implementation support together with a study on the nature of the clinicians to determine factors that may influence their attitude. This research identified that acceptance of a system is not necessarily a measure of its quality, capability and usability, is influenced by the user’s attitude which is determined by outside factors, and the nature and quality of training. The need to recognise the limitations of the current methodologies for analysing usability and acceptance was explored to lay the foundations for further research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIM-compatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

These National Guidelines and Case Studies for Digital Modelling are the outcomes from one of a number of Building Information Modelling (BIM)-related projects undertaken by the CRC for Construction Innovation. Since the CRC opened its doors in 2001, the industry has seen a rapid increase in interest in BIM, and widening adoption. These guidelines and case studies are thus very timely, as the industry moves to model-based working and starts to share models in a new context called integrated practice. Governments, both federal and state, and in New Zealand are starting to outline the role they might take, so that in contrast to the adoption of 2D CAD in the early 90s, we ensure that a national, industry-wide benefit results from this new paradigm of working. Section 1 of the guidelines give us an overview of BIM: how it affects our current mode of working, what we need to do to move to fully collaborative model-based facility development. The role of open standards such as IFC is described as a mechanism to support new processes, and make the extensive design and construction information available to asset operators and managers. Digital collaboration modes, types of models, levels of detail, object properties and model management complete this section. It will be relevant for owners, managers and project leaders as well as direct users of BIM. Section 2 provides recommendations and guides for key areas of model creation and development, and the move to simulation and performance measurement. These are the more practical parts of the guidelines developed for design professionals, BIM managers, technical staff and ‘in the field’ workers. The guidelines are supported by six case studies including a summary of lessons learnt about implementing BIM in Australian building projects. A key aspect of these publications is the identification of a number of important industry actions: the need for BIMcompatible product information and a national context for classifying product data; the need for an industry agreement and setting process-for-process definition; and finally, the need to ensure a national standard for sharing data between all of the participants in the facility-development process.