914 resultados para Task scheduling in computational grid


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The future scenarios for operation of smart grids are likely to include a large diversity of players, of different types and sizes. With control and decision making being decentralized over the network, intelligence should also be decentralized so that every player is able to play in the market environment. In the new context, aggregator players, enabling medium, small, and even micro size players to act in a competitive environment, will be very relevant. Virtual Power Players (VPP) and single players must optimize their energy resource management in order to accomplish their goals. This is relatively easy to larger players, with financial means to have access to adequate decision support tools, to support decision making concerning their optimal resource schedule. However, the smaller players have difficulties in accessing this kind of tools. So, it is required that these smaller players can be offered alternative methods to support their decisions. This paper presents a methodology, based on Artificial Neural Networks (ANN), intended to support smaller players’ resource scheduling. The used methodology uses a training set that is built using the energy resource scheduling solutions obtained with a reference optimization methodology, a mixed-integer non-linear programming (MINLP) in this case. The trained network is able to achieve good schedule results requiring modest computational means.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This chapter presents some of the issues with holonic manufacturing systems. It starts by presenting the current manufacturing scenario and trends and then provides some background information on the holonic concept and its application to manufacturing. The current limitations and future trends of manufacturing suggest more autonomous and distributed organisations for manufacturing systems; holonic manufacturing systems are proposed as a way to achieve such autonomy and decentralisation. After a brief literature survey a specific research work is presented to handle scheduling in holonic manufacturing systems. This work is based on task and resource holons that cooperate with each other based on a variant of the contract net protocol that allow the propagation of constraints between operations in the execution plan. The chapter ends by presenting some challenges and future opportunities of research.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Os sistemas de tempo real modernos geram, cada vez mais, cargas computacionais pesadas e dinâmicas, começando-se a tornar pouco expectável que sejam implementados em sistemas uniprocessador. Na verdade, a mudança de sistemas com um único processador para sistemas multi- processador pode ser vista, tanto no domínio geral, como no de sistemas embebidos, como uma forma eficiente, em termos energéticos, de melhorar a performance das aplicações. Simultaneamente, a proliferação das plataformas multi-processador transformaram a programação paralela num tópico de elevado interesse, levando o paralelismo dinâmico a ganhar rapidamente popularidade como um modelo de programação. A ideia, por detrás deste modelo, é encorajar os programadores a exporem todas as oportunidades de paralelismo através da simples indicação de potenciais regiões paralelas dentro das aplicações. Todas estas anotações são encaradas pelo sistema unicamente como sugestões, podendo estas serem ignoradas e substituídas, por construtores sequenciais equivalentes, pela própria linguagem. Assim, o modo como a computação é na realidade subdividida, e mapeada nos vários processadores, é da responsabilidade do compilador e do sistema computacional subjacente. Ao retirar este fardo do programador, a complexidade da programação é consideravelmente reduzida, o que normalmente se traduz num aumento de produtividade. Todavia, se o mecanismo de escalonamento subjacente não for simples e rápido, de modo a manter o overhead geral em níveis reduzidos, os benefícios da geração de um paralelismo com uma granularidade tão fina serão meramente hipotéticos. Nesta perspetiva de escalonamento, os algoritmos que empregam uma política de workstealing são cada vez mais populares, com uma eficiência comprovada em termos de tempo, espaço e necessidades de comunicação. Contudo, estes algoritmos não contemplam restrições temporais, nem outra qualquer forma de atribuição de prioridades às tarefas, o que impossibilita que sejam diretamente aplicados a sistemas de tempo real. Além disso, são tradicionalmente implementados no runtime da linguagem, criando assim um sistema de escalonamento com dois níveis, onde a previsibilidade, essencial a um sistema de tempo real, não pode ser assegurada. Nesta tese, é descrita a forma como a abordagem de work-stealing pode ser resenhada para cumprir os requisitos de tempo real, mantendo, ao mesmo tempo, os seus princípios fundamentais que tão bons resultados têm demonstrado. Muito resumidamente, a única fila de gestão de processos convencional (deque) é substituída por uma fila de deques, ordenada de forma crescente por prioridade das tarefas. De seguida, aplicamos por cima o conhecido algoritmo de escalonamento dinâmico G-EDF, misturamos as regras de ambos, e assim nasce a nossa proposta: o algoritmo de escalonamento RTWS. Tirando partido da modularidade oferecida pelo escalonador do Linux, o RTWS é adicionado como uma nova classe de escalonamento, de forma a avaliar na prática se o algoritmo proposto é viável, ou seja, se garante a eficiência e escalonabilidade desejadas. Modificar o núcleo do Linux é uma tarefa complicada, devido à complexidade das suas funções internas e às fortes interdependências entre os vários subsistemas. Não obstante, um dos objetivos desta tese era ter a certeza que o RTWS é mais do que um conceito interessante. Assim, uma parte significativa deste documento é dedicada à discussão sobre a implementação do RTWS e à exposição de situações problemáticas, muitas delas não consideradas em teoria, como é o caso do desfasamento entre vários mecanismo de sincronização. Os resultados experimentais mostram que o RTWS, em comparação com outro trabalho prático de escalonamento dinâmico de tarefas com restrições temporais, reduz significativamente o overhead de escalonamento através de um controlo de migrações, e mudanças de contexto, eficiente e escalável (pelo menos até 8 CPUs), ao mesmo tempo que alcança um bom balanceamento dinâmico da carga do sistema, até mesmo de uma forma não custosa. Contudo, durante a avaliação realizada foi detetada uma falha na implementação do RTWS, pela forma como facilmente desiste de roubar trabalho, o que origina períodos de inatividade, no CPU em questão, quando a utilização geral do sistema é baixa. Embora o trabalho realizado se tenha focado em manter o custo de escalonamento baixo e em alcançar boa localidade dos dados, a escalonabilidade do sistema nunca foi negligenciada. Na verdade, o algoritmo de escalonamento proposto provou ser bastante robusto, não falhando qualquer meta temporal nas experiências realizadas. Portanto, podemos afirmar que alguma inversão de prioridades, causada pela sub-política de roubo BAS, não compromete os objetivos de escalonabilidade, e até ajuda a reduzir a contenção nas estruturas de dados. Mesmo assim, o RTWS também suporta uma sub-política de roubo determinística: PAS. A avaliação experimental, porém, não ajudou a ter uma noção clara do impacto de uma e de outra. No entanto, de uma maneira geral, podemos concluir que o RTWS é uma solução promissora para um escalonamento eficiente de tarefas paralelas com restrições temporais.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The recently standardized IEEE 802.15.4/Zigbee protocol stack offers great potentials for ubiquitous and pervasive computing, namely for Wireless Sensor Networks (WSNs). However, there are still some open and ambiguous issues that turn its practical use a challenging task. One of those issues is how to build a synchronized multi-hop cluster-tree network, which is quite suitable for QoS support in WSNs. In fact, the current IEEE 802.15.4/Zigbee specifications restrict the synchronization in the beacon-enabled mode (by the generation of periodic beacon frames) to star-based networks, while it supports multi-hop networking using the peer-to-peer mesh topology, but with no synchronization. Even though both specifications mention the possible use of cluster-tree topologies, which combine multi-hop and synchronization features, the description on how to effectively construct such a network topology is missing. This report tackles this problem, unveils the ambiguities regarding the use of the cluster-tree topology and proposes two collisionfree beacon frame scheduling schemes.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

An intensive use of dispersed energy resources is expected for future power systems, including distributed generation, especially based on renewable sources, and electric vehicles. The system operation methods and tool must be adapted to the increased complexity, especially the optimal resource scheduling problem. Therefore, the use of metaheuristics is required to obtain good solutions in a reasonable amount of time. This paper proposes two new heuristics, called naive electric vehicles charge and discharge allocation and generation tournament based on cost, developed to obtain an initial solution to be used in the energy resource scheduling methodology based on simulated annealing previously developed by the authors. The case study considers two scenarios with 1000 and 2000 electric vehicles connected in a distribution network. The proposed heuristics are compared with a deterministic approach and presenting a very small error concerning the objective function with a low execution time for the scenario with 2000 vehicles.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the Biodiversity World (BDW) project we have created a flexible and extensible Web Services-based Grid environment for biodiversity researchers to solve problems in biodiversity and analyse biodiversity patterns. In this environment, heterogeneous and globally distributed biodiversity-related resources such as data sets and analytical tools are made available to be accessed and assembled by users into workflows to perform complex scientific experiments. One such experiment is bioclimatic modelling of the geographical distribution of individual species using climate variables in order to predict past and future climate-related changes in species distribution. Data sources and analytical tools required for such analysis of species distribution are widely dispersed, available on heterogeneous platforms, present data in different formats and lack interoperability. The BDW system brings all these disparate units together so that the user can combine tools with little thought as to their availability, data formats and interoperability. The current Web Servicesbased Grid environment enables execution of the BDW workflow tasks in remote nodes but with a limited scope. The next step in the evolution of the BDW architecture is to enable workflow tasks to utilise computational resources available within and outside the BDW domain. We describe the present BDW architecture and its transition to a new framework which provides a distributed computational environment for mapping and executing workflows in addition to bringing together heterogeneous resources and analytical tools.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In the present work, the effects of spatial constraints on the efficiency of task execution in systems underlain by geographical complex networks are investigated, where the probability of connection decreases with the distance between the nodes. The investigation considers several configurations of the parameters defining the network connectivity, and the Barabasi-Albert network model is also considered for comparisons. The results show that the effect of connectivity is significant only for shorter tasks, the locality of connection simplied by the spatial constraints reduces efficiency, and the addition of edges can improve the efficiency of the execution, although with increasing locality of the connections the improvement is small.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper describes the development and solution of binary integer formulations for production scheduling problems in market-driven foundries. This industrial sector is comprised of small and mid-sized companies with little or no automation, working with diversified production, involving several different metal alloy specifications in small tailor-made product lots. The characteristics and constraints involved in a typical production environment at these industries challenge the formulation of mathematical programming models that can be computationally solved when considering real applications. However, despite the interest on the part of these industries in counting on effective methods for production scheduling, there are few studies available on the subject. The computational tests prove the robustness and feasibility of proposed models in situations analogous to those found in production scheduling at the analyzed industrial sector. (C) 2010 Elsevier Ltd. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The finite volume method is used as a numerical method for solving the fluid flow equations. This method is appropriate to employ under structured and unstructured meshes. Mixed grids, combining both types of grids, are investigated. The coupling of different grids is done by overlapping strategy. The computational effort for the mixed grid is evaluated by the CPU-time, with different percentage of covering area of the unstructured mesh. The present scheme is tested for the driven cavity problem, where the incompressible fluid is integrated by calculating the velocity fields and computing the pressure field in each time step. Several schemes for unstructured grid are examined, and the compatibility condition is applied to check their consistency. A scheme to verify the compatibility condition for the unstructured grids is presented. (c) 2006 IMACS. Published by Elsevier B.V. All rights reserved.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This chapter studies a two-level production planning problem where, on each level, a lot sizing and scheduling problem with parallel machines, capacity constraints and sequence-dependent setup costs and times must be solved. The problem can be found in soft drink companies where the production process involves two interdependent levels with decisions concerning raw material storage and soft drink bottling. Models and solution approaches proposed so far are surveyed and conceptually compared. Two different approaches have been selected to perform a series of computational comparisons: an evolutionary technique comprising a genetic algorithm and its memetic version, and a decomposition and relaxation approach. © 2008 Springer-Verlag Berlin Heidelberg.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, we propose three novel mathematical models for the two-stage lot-sizing and scheduling problems present in many process industries. The problem shares a continuous or quasi-continuous production feature upstream and a discrete manufacturing feature downstream, which must be synchronized. Different time-based scale representations are discussed. The first formulation encompasses a discrete-time representation. The second one is a hybrid continuous-discrete model. The last formulation is based on a continuous-time model representation. Computational tests with state-of-the-art MIP solver show that the discrete-time representation provides better feasible solutions in short running time. On the other hand, the hybrid model achieves better solutions for longer computational times and was able to prove optimality more often. The continuous-type model is the most flexible of the three for incorporating additional operational requirements, at a cost of having the worst computational performance. Journal of the Operational Research Society (2012) 63, 1613-1630. doi:10.1057/jors.2011.159 published online 7 March 2012

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Im Bereich sicherheitsrelevanter eingebetteter Systeme stellt sich der Designprozess von Anwendungen als sehr komplex dar. Entsprechend einer gegebenen Hardwarearchitektur lassen sich Steuergeräte aufrüsten, um alle bestehenden Prozesse und Signale pünktlich auszuführen. Die zeitlichen Anforderungen sind strikt und müssen in jeder periodischen Wiederkehr der Prozesse erfüllt sein, da die Sicherstellung der parallelen Ausführung von größter Bedeutung ist. Existierende Ansätze können schnell Designalternativen berechnen, aber sie gewährleisten nicht, dass die Kosten für die nötigen Hardwareänderungen minimal sind. Wir stellen einen Ansatz vor, der kostenminimale Lösungen für das Problem berechnet, die alle zeitlichen Bedingungen erfüllen. Unser Algorithmus verwendet Lineare Programmierung mit Spaltengenerierung, eingebettet in eine Baumstruktur, um untere und obere Schranken während des Optimierungsprozesses bereitzustellen. Die komplexen Randbedingungen zur Gewährleistung der periodischen Ausführung verlagern sich durch eine Zerlegung des Hauptproblems in unabhängige Unterprobleme, die als ganzzahlige lineare Programme formuliert sind. Sowohl die Analysen zur Prozessausführung als auch die Methoden zur Signalübertragung werden untersucht und linearisierte Darstellungen angegeben. Des Weiteren präsentieren wir eine neue Formulierung für die Ausführung mit fixierten Prioritäten, die zusätzlich Prozessantwortzeiten im schlimmsten anzunehmenden Fall berechnet, welche für Szenarien nötig sind, in denen zeitliche Bedingungen an Teilmengen von Prozessen und Signalen gegeben sind. Wir weisen die Anwendbarkeit unserer Methoden durch die Analyse von Instanzen nach, welche Prozessstrukturen aus realen Anwendungen enthalten. Unsere Ergebnisse zeigen, dass untere Schranken schnell berechnet werden können, um die Optimalität von heuristischen Lösungen zu beweisen. Wenn wir optimale Lösungen mit Antwortzeiten liefern, stellt sich unsere neue Formulierung in der Laufzeitanalyse vorteilhaft gegenüber anderen Ansätzen dar. Die besten Resultate werden mit einem hybriden Ansatz erzielt, der heuristische Startlösungen, eine Vorverarbeitung und eine heuristische mit einer kurzen nachfolgenden exakten Berechnungsphase verbindet.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper deals with an event-bus tour booked by Bollywood film fans. During the tour, the participants visit selected locations of famous Bollywood films at various sites in Switzerland. Moreover, the tour includes stops for lunch and shopping. Each day, up to five buses operate the tour; for organizational reasons, two or more buses cannot stay at the same location simultaneously. The planning problem is how to compute a feasible schedule for each bus such that the total waiting time (primary objective) and the total travel time (secondary objective) are minimized. We formulate this problem as a mixed-integer linear program, and we report on computational results obtained with the Gurobi solver.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Adaptive embedded systems are required in various applications. This work addresses these needs in the area of adaptive image compression in FPGA devices. A simplified version of an evolution strategy is utilized to optimize wavelet filters of a Discrete Wavelet Transform algorithm. We propose an adaptive image compression system in FPGA where optimized memory architecture, parallel processing and optimized task scheduling allow reducing the time of evolution. The proposed solution has been extensively evaluated in terms of the quality of compression as well as the processing time. The proposed architecture reduces the time of evolution by 44% compared to our previous reports while maintaining the quality of compression unchanged with respect to existing implementations. The system is able to find an optimized set of wavelet filters in less than 2 min whenever the input type of data changes.