Three time-based scale formulations for the two-stage lot sizing and scheduling in process industries
Contribuinte(s) |
UNIVERSIDADE DE SÃO PAULO |
---|---|
Data(s) |
01/11/2013
01/11/2013
02/08/2013
|
Resumo |
In this paper, we propose three novel mathematical models for the two-stage lot-sizing and scheduling problems present in many process industries. The problem shares a continuous or quasi-continuous production feature upstream and a discrete manufacturing feature downstream, which must be synchronized. Different time-based scale representations are discussed. The first formulation encompasses a discrete-time representation. The second one is a hybrid continuous-discrete model. The last formulation is based on a continuous-time model representation. Computational tests with state-of-the-art MIP solver show that the discrete-time representation provides better feasible solutions in short running time. On the other hand, the hybrid model achieves better solutions for longer computational times and was able to prove optimality more often. The continuous-type model is the most flexible of the three for incorporating additional operational requirements, at a cost of having the worst computational performance. Journal of the Operational Research Society (2012) 63, 1613-1630. doi:10.1057/jors.2011.159 published online 7 March 2012 FAPESP FAPESP [2008/09953-2] CNPq CNPq [300713/2010-0] CAPES from Brazil CAPES from Brazil [CAPESBEX-1545/11-6, 246881] Erasmus Mundus External Cooperation Windows Programme from European Commission Erasmus Mundus External Cooperation Windows Programme from European Commission |
Identificador |
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, BASINGSTOKE, v. 63, n. 11, supl. 1, Part 2, pp. 1613-1630, NOV, 2012 0160-5682 http://www.producao.usp.br/handle/BDPI/37382 10.1057/jors.2011.159 |
Idioma(s) |
eng |
Publicador |
PALGRAVE MACMILLAN LTD BASINGSTOKE |
Relação |
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY |
Direitos |
restrictedAccess Copyright PALGRAVE MACMILLAN LTD |
Palavras-Chave | #LOT SIZING AND SCHEDULING #TWO-STAGE PRODUCTION SYSTEM #MIXED-INTEGER PROGRAM #TIME SCALE #EXTENSIONS #MANAGEMENT #OPERATIONS RESEARCH & MANAGEMENT SCIENCE |
Tipo |
article original article publishedVersion |