857 resultados para Stakeholder Management. Resident Support. Environmental Turistic Project Management


Relevância:

100.00% 100.00%

Publicador:

Resumo:

A Work Project, presented as part of the requirements for the Award of a Masters Degree in Economics from the NOVA – School of Business and Economics

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Hospitals represent complex and difficult contexts for AEC (architecture, engineering and construction) professionals to engage with due to their functional complexity and diversity of stakeholder interests (i.e. patient, visitor, medical specialist). Hospital designers need to take note of changing NHS policy contexts (e.g. the possible empowerment of general practitioners to shape services), technological advances in medical equipment design and the potential health needs of future generations. It is imperative for hospital designers and architects to align their processes and methodologies (e.g. briefing and requirements capture) to the needs and desires of their clients so that a medical facility design is produced which is truly aligned to the requirements of the hospital stakeholders. Semiotics, the “study” or “discipline” of signs aims to investigate the nature of signs (their inception, representation and meaning), whilst semiotics-rooted theories are concerned with investigating how meaning and understanding is mobilized between persons and between organisations. This paper details a semiotics-rooted research approach for investigating the interactions between hospital designers and stakeholders on a forthcoming NHS hospital project in the UK. A semiotics grounded study will potentially provide a deeper understanding of how meaning and understanding is established between hospital project stakeholders and construction professionals.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Environmental Education is an essential component of childhood education and can play a vital role in the development of positive environmental attitudes, community involvement and environmental awareness. One of the main challenges faced by Canadian educators is the lack of support and funding to fully engage and participate in Environmental Education programs that are locally available. To better understand the viewpoint and challenges of educators and Environmental Education programs, this paper includes an interview series with three Environmental Education leaders, followed by a discussion section on significant commonalities. Through the research of peer-reviewed literature, federal documents, and environmental networks, this research paper aims to interpret the development and challenges of K-12 environmental education in North America as well as to review the established programs, networks, and resources availble to Canadian educators.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

SOLUTIONS (2013 to 2018) is a European Union Seventh Framework Programme Project (EU-FP7). The project aims to deliver a conceptual framework to support the evidence-based development of environmental policies with regard to water quality. SOLUTIONS will develop the tools for the identification, prioritisation and assessment of those water contaminants that may pose a risk to ecosystems and human health. To this end, a new generation of chemical and effect-based monitoring tools is developed and integrated with a full set of exposure, effect and risk assessment models. SOLUTIONS attempts to address legacy, present and future contamination by integrating monitoring and modelling based approaches with scenarios on future developments in society, economy and technology and thus in contamination. The project follows a solutions-oriented approach by addressing major problems of water and chemicals management and by assessing abatement options. SOLUTIONS takes advantage of the access to the infrastructure necessary to investigate the large basins of the Danube and Rhine as well as relevant Mediterranean basins as case studies, and puts major efforts on stakeholder dialogue and support. Particularly, the EU Water Framework Directive (WFD) Common Implementation Strategy (CIS) working groups, International River Commissions, and water works associations are directly supported with consistent guidance for the early detection, identification, prioritisation, and abatement of chemicals in the water cycle. SOLUTIONS will give a specific emphasis on concepts and tools for the impact and risk assessment of complex mixtures of emerging pollutants, their metabolites and transformation products. Analytical and effect-based screening tools will be applied together with ecological assessment tools for the identification of toxicants and their impacts. The SOLUTIONS approach is expected to provide transparent and evidence-based candidates or River Basin Specific Pollutants in the case study basins and to assist future review of priority pollutants under the WFD as well as potential abatement options.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Stora Enso has research centres in Finland, Sweden and Germany. The research centres use PIMS as a research project invoicing and monitoring system. Possible reorganization and new financing model for R&D functions have been considered and the project management system should be developed to support the new operation model. The objective of this thesis is to find a model for R&D project management, and to present the project management system of Stora Enso, and to discuss if the current system could be developed to respond to the new needs or should it be replaced with another system. The theoretical part of the study describes challenges in R&D project management, and presents different project characteristics, and methods for managing R&D project portfolio. It is also described how the project management system can support project monitoring and controlling, and how inter-project learning can be enhanced. The empirical part of the study presents the current project management system of Stora Enso and how the system should be developed to support Stora Enso’s R&D functions better. In conclusion, it is stated that there is no relevant reason to replace PIMS with another system, because PIMS can be developed to support R&D project management better with a hybrid system. It is also suggested that the new financing model should not be implemented before more comprehensive analysis of its effects is conducted.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Green supply chain management and environmental and ethical behaviour (EEB), a major component of corporate responsibility (CR), are rapidly developing fields in research and practice. The influence and effect of EEB at the functional level, however, is under-researched. Similarly, the management of risk in the supply chain has become a practical concern for many firms. It is important that managers have a good understanding of the risks associated with supplier partnerships. This paper examines the effect of firms’ investment in EEB as part of corporate social responsibility in mediating the relationship between supply chain partnership (SCP) and management appreciation of the risk of partnering. We hypothesise that simply entering into a SCP does not facilitate an appreciation of the risk of partnering and may even hamper such awareness. However, such an appreciation of the risk is facilitated through CR’s environmental and stakeholder management ethos. The study contributes further by separating risk into distinct relational and performance components. The results of a firm-level survey confirm the mediation effect, highlighting the value to supply chain strategy and design of investing in EEB on three fronts: building internal awareness, monitoring and sharing best practice.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper aims at building a theoretical framework to examine the impact of development pressure on private owner’s forest management practices, namely, on regeneration and conversion cut dates. As the rent for developed land is rising over time, our model creates the possibility of switching from forestry to residential use at some point in the future, thus departing from the Faustmann’s traditional setup. Comparative statics results with respect to stumpage prices, regeneration costs and urban growth parameters are provided. The results obtained depend on the impact on the opportunity cost of holding the stand and the impact on the opportunity cost of holding the land, generalizing Faustmann’s unambiguous results.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Lobbying by companies and the management techniques of lobbying have been fairly unknown territory. This study explains different theories related to lobbying including major political, economic and mathematical theories and their connections to lobbying. Existing lobbying networks in the European Union, especially at the European Union level, are explained. Lobbying organisations in the European Union are interconnected. Networks start at a local level, and have connections to national, European Union, international and sometimes to the global level. Relationships between business strategy and lobbying are studied with emphasis on issues management. Business strategy is often seen stemming from business environment analysis and stakeholder management. The issues management concept bridges aspects of business environment analysis and stakeholder management into a project type of management approach. The study includes two different empirical parts. A sample of public policy managers representing the European chemical industry was interviewed, and a chemical industry specific lobbying framework was built. This framework was then tested using a questionnaire sent to European public issues managers representing some of the largest European companies. Based on the results of the questionnaire, a generic framework on how large, European companies manage lobbying in general terms was developed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Various regulations and customer requirements have made it necessary for Vacon Oyj to pay more attention to the environmental aspects in its processes. The main purpose of this master’s thesis project is to define how environmental aspects could be integrated into Vacon’s product development process. The aim is to find out the most important environmental aspects for the company to address, to examine how these could be taken into account during the development process and to map the critical factors that need consideration in order to ensure the successful integration of environmental aspects into the design process. Based on the customer requirements and evolving regulations the most important aspects for Vacon include minimizing the amount of harmful substances, improving the recyclability and energy efficiency of the product and moreover providing meaningful information related to these aspects. To tackle these issues, a new DfE process was developed, tasks in each phase were described and responsibilities were indicated. To ensure the success of the DfE process, management commitment, support of other processes and significant improvements in ways the information is managed are required. The developers should be provided with training and support. Environmental expertise and knowledge in-house should be developed and establishing meaningful environmental indicators is suggested.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this thesis is to identify areas for improvement in the current stakeholder management literature. The current stakeholder management theories were analyzed to determine their benefits and detriments. To determine how these theories work in a corporation, General Motors was selected as a single-case study to determine the patterns of stakeholder management over time. These patterns demonstrated the need for dynamic stakeholder management over time, with an emphasis on collaboration and the necessity of recognizing the greater stakeholder network surrounding the corporation. Proper stakeholder management in the early years of General Motors would have prevented its failure, while the organizational culture as a path-dependent variable made it difficult for General Motors to alter long-standing stakeholder relationships.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This chapter introduces a conceptual model to combine creativity techniques with fuzzy cognitive maps (FCMs) and aims to support knowledge management methods by improving expert knowledge acquisition and aggregation. The aim of the conceptual model is to represent acquired knowledge in a manner that is as computer-understandable as possible with the intention of developing automated reasoning in the future as part of intelligent information systems. The formal represented knowledge thus may provide businesses with intelligent information integration. To this end, we introduce and evaluate various creativity techniques with a list of attributes to define the most suitable to combine with FCMs. This proposed combination enables enhanced knowledge management through the acquisition and representation of expert knowledge with FCMs. Our evaluation indicates that the creativity technique known as mind mapping is the most suitable technique in our set. Finally, a scenario from stakeholder management demonstrates the combination of mind mapping with FCMs as an integrated system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Cover title: Proceedings of the UC/AID-University of Alexandria, A.R.E., Seminar/Workshop in Pesticide Management, March 5-10, 1977, University of Alexandria.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The universities rely on the Information Technology (IT) projects to support and enhance their core strategic objectives of teaching, research, and administration. The researcher’s literature review found that the level of IT funding and resources in the universities is not adequate to meet the IT demands. The universities received more IT project requests than they could execute. As such, universities must selectively fund the IT projects. The objectives of the IT projects in the universities vary. An IT project which benefits the teaching functions may not benefit the administrative functions. As such, the selection of an IT project is challenging in the universities. To aid with the IT decision making, many universities in the United States of America (USA) have formed the IT Governance (ITG) processes. ITG is an IT decision making and accountability framework whose purpose is to align the IT efforts in an organization with its strategic objectives, realize the value of the IT investments, meet the expected performance criteria, and manage the risks and the resources (Weil & Ross, 2004). ITG in the universities is relatively new, and it is not well known how the ITG processes are aiding the nonprofit universities in selecting the right IT projects, and managing the performance of these IT projects. This research adds to the body of knowledge regarding the IT project selection under the governance structure, the maturity of the IT projects, and the IT project performance in the nonprofit universities. The case study research methodology was chosen for this exploratory research. The convenience sampling was done to choose the cases from two large, research universities with decentralized colleges, and two small, centralized universities. The data were collected on nine IT projects from these four universities using the interviews and the university documents. The multi-case analysis was complemented by the Qualitative Comparative Analysis (QCA) to systematically analyze how the IT conditions lead to an outcome. This research found that the IT projects were selected in the centralized universities in a more informed manner. ITG was more authoritative in the small centralized universities; the ITG committees were formed by including the key decision makers, the decision-making roles, and responsibilities were better defined, and the frequency of ITG communication was higher. In the centralized universities, the business units and colleges brought the IT requests to ITG committees; which in turn prioritized the IT requests and allocated the funds and the resources to the IT projects. ITG committee members in the centralized universities had a higher awareness of the university-wide IT needs, and the IT projects tended to align with the strategic objectives. On the other hand, the decentralized colleges and business units in the large universities were influential and often bypassed the ITG processes. The decentralized units often chose the “pet” IT projects, and executed them within a silo, without bringing them to the attention of the ITG committees. While these IT projects met the departmental objectives, they did not always align with the university’s strategic objectives. This research found that the IT project maturity in the university could be increased by following the project management methodologies. The IT project management maturity was found higher in the IT projects executed by the centralized university, where a full-time project manager was assigned to manage the project, and the project manager had a higher expertise in the project management. The IT project executed under the guidance of the Project Management Office (PMO) has exhibited a higher project management maturity, as the PMO set the standards and controls for the project. The IT projects managed by the decentralized colleges by a part-time project manager with lower project management expertise have exhibited a lower project management maturity. The IT projects in the decentralized colleges were often managed by the business, or technical leads, who often lacked the project management expertise. This research found that higher the IT project management maturity, the better is the project performance. The IT projects with a higher maturity had a lower project delay, lower number of missed requirements, and lower number of IT system errors. This research found that the quality of IT decision in the university could be improved by centralizing the IT decision-making processes. The IT project management maturity could be improved by following the project management methodologies. The stakeholder management and communication were found critical for the success of the IT projects in the university. It is hoped that the findings from this research would help the university leaders make the strategic IT decisions, and the university’s IT project managers make the IT project decisions.